| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹61.1 L+₹8.5 L (16.3%)Admitted-Finance 17 SUROHI 3 NIKOL NARODA ROAD NIKOL AHMEDABAD GUJARAT 382350 | AHMADABAD | GUJARAT | 382350 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAP TECHNOLAB PVT. LTD. L1 | Deesha Civil Engineering Design L2 |
|---|---|---|---|---|---|
| 1.00 | Topographic and Contour Survey work with level at every 10m interval
upto ROW (a) For ROW of 04 meter | 1 | Nos | 35,000 ₹35,000 Lowest | 42,000 ₹42,000 |
| 1.01 | (b) For ROW of 06 meter | 1 | Nos | 37,000 ₹37,000 Lowest | 45,420 ₹45,420 |
| 1.02 | (c ) For ROW of 10 meter | 1 | Nos | 40,000 ₹40,000 Lowest | 46,530 ₹46,530 |
| 1.03 | (d) For ROW of 15 meter | 1 | Nos | 42,000 ₹42,000 Lowest | 48,640 ₹48,640 |
| 1.04 | (e) For ROW of 20 meter | 1 | Nos | 45,000 ₹45,000 Lowest | 53,200 ₹53,200 |
| 2.00 | Topography & Contour Survey for Ground (a) For up to1 Hector | 1 | Nos | 60,000 ₹60,000 Lowest | 67,650 ₹67,650 |
| 2.01 | (b) For 1 to 5 Hector | 1 | Nos | 55,000 ₹55,000 Lowest | 62,520 ₹62,520 |
| 2.02 | (c) For 6 to 10 Hector | 1 | Nos | 54,000 ₹54,000 Lowest | 62,350 ₹62,350 |
| 2.03 | (d) For 11 to 15 Hector | 1 | Nos | 53,000 ₹53,000 Lowest | 61,400 ₹61,400 |
| 2.04 | (e) For 16 to 20 Hector | 1 | Nos | 52,000 ₹52,000 Lowest | 59,630 ₹59,630 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
25 Apr 2022, 3:00 pmClosed
Executive Engineer, LPWD Kavaratti
Executive Engineer, LPWD Kavaratti
SELECTION OF CONSULTANCY FIRM FOR PROVIDING CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF VARIOUS MAIN ROADS, OTHER LINK ROADS AND VILLAGE ROADS IN THE UNION TERRITORY OF LAKSHADWEEP
2022_UTL_1739_3
RFP No.18/RFP/EE(Kvt)/2021-22
Open Tender
Consultancy
Item Rate
45 days
Kavaratti
Please refer Tender documents.
17 documents required · 17 mandatory
₹1,500
Executive Engineer, LPWD Kavaratti
₹2 L
LPWD Division Office Kavaratti
11 May 2022
14 Apr 2022
25 Apr 2022
14 Apr 2022
25 Apr 2022
14 Apr 2022
20 Apr 2022
Amount
Topographic and Contour Survey work with level at every 10m interval upto ROW (a) For ROW of 04 meter
(b) For ROW of 06 meter
(c ) For ROW of 10 meter
(d) For ROW of 15 meter
(e) For ROW of 20 meter
Topography & Contour Survey for Ground (a) For up to1 Hector
(b) For 1 to 5 Hector
(c) For 6 to 10 Hector
(d) For 11 to 15 Hector
(e) For 16 to 20 Hector
(f) For 21 to 50 Hector
(g) For 51 to 100 Hector
(h) For 101 Hector above
Areal Drone Surveying/Mapping (a) For up to1 Hector
(b) For 1 to 5 Hector
(c) For 6 to 10 Hector
(d) For 11 to 15 Hector
(e) For 16 to 20 Hector
(f) For 21 to 50 Hector
(g) For 51 to 100 Hector
(h) For 101 Hector above
Collection of Subgrade soil sample and Necessary Laboratory Investigation
Conducting BBD test, Condition survey and condition survey on existing pavement including truckrent
Conducting FWD test, Condition survey and condition survey on existing pavement
Pavement design for the Overlay & widening
Geometric Design (Horizontal and Vertical alignment) and Junction improvement with shyness and Road Marking /Furniture as per the IRC Guidelines with Typical cross section of the road
Bill of Quantities and Cost estimate for Road work
Jetty Design, Drawing & BOQ as per the direction of Competent authority
Under sea water Tunnel Design, Drawing and BOQ
Preparation of detailed design drawing and BOQ (New/ Widening) including inventory for the Cross- drainage work like Major bridge, Minor bridge, Box culvert, Pipe culvert (a) Major Bridge
(b) Minor bridge
(c ) Box/ slab Culvert
(d) Pipe culvert
Preparation of Detail design, Drawing and BOQ for the Retaining wall / Toe wall
Tender Preparation on include RFP, NIT and Technical Specification
Conducting traffic Survey
Conducting Axle load
Origin - Destination and commodity Movements Surveys
Turning Movement Surveys
Speed - Delay Surveys
Pedestrian Surveys
Traffic Demand Estimates
Mapping of heritage structure
Drainage System Design
Water Harvesting Network including hydrology
Water supply Network Including RCC ESR, Under Ground Sump, Pump House
Sewerage Network
S.T.P. Design, Drawing and BOQ
Architectural Planning, Designing and preparation of BOQ
Road furniture plan
Parking Areas and Rest Areas
Project Reports
Geo technical Investigation for proposed structures including Drilling of boreholes, Collection of Disturbed and Undisturbed samples, Conducting SPT, Carrying out necessary. Ground surface (a) For Soil
(b) For Soft Rock
(c ) For Hard Rock
Under Water (a) For Soil
(b) For Soft Rock
(c ) For Hard Rock
Land AcquisitionPlan
Deesha Civil Engineering Design
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .