Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.6 LAdmitted-Finance AT SANDHAPUR PO GORUAL PS PURI SADAR DIST PURI PIN 752002 | PURI | PURI | ODISHA | 752002 | -37.55% | ₹64.6 L | L1 | Admitted-Finance |
| 2 | L2₹68.4 LAdmitted-Finance WARD NO 19 PO PURI PS KUMBHARAPADA DIST PURI PIN 752001 | PURI | PURI | ODISHA | 752001 | -33.90% | ₹68.4 L | L2 | Admitted-Finance |
| 3 | L3₹71.1 LAdmitted-Finance | -31.31% | ₹71.1 L | L3 | Admitted-Finance |
| 4 | L4₹71.7 LAdmitted-Finance | -30.69% | ₹71.7 L | L4 | Admitted-Finance |
| 5 | L5₹80.9 LAdmitted-Finance | -21.78% | ₹80.9 L | L5 | Admitted-Finance |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
17 Apr 2026, 5:00 pmClosed
CCE Khordha RandB Circle Khordha
O/o the Chief Construction Engineer Khordha R and B Circle Khordha
Improvement of road from subash Bose square to Marine Drive road via PKDA Colony Chhak, KV, Ashram and Bhudan Chhak from 4/550 km to 5/139 km in the District of Puri under state plan for the year 2025-26
2026_EICCL_127992_3
CCE-Khordha (RandB) Circle-16/2025-26
Open Tender
Civil Works - Roads
60 days
Puri
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.0 L
Yes
14 May 2026
9 Apr 2026
18 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & applying tack coat with rapid setting (RS-1) Bitumen Emulsion on prepared surface including cleaning of road surface and spraying tack coat @ 0.20 K.g / Sqm using mechanical means as per Cluse No. 501, 503 and Section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. | - | Sqm | - | - |
| 2 | Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in Table 500-29, prepared by using mastic cooker and laid to required level and slope after cooking the surface,including providing anti-skid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and an approximate spacing of 10 cm center to center in both directio, pressed into surface when the temperature of surfaces is not less than 100° C ,protruding 1 mm to 4 mm over mastic surface including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per Clause 516 of MoRT&H Specifications for Road & Bridge works (5th Revision) etc complete and as per direction of Engineer-in-Charge. | - | Sqm | - | - |
| 3 | Plain cement concrete M-20 including centering and shuttering with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. | - | Cum | - | - |
| 4 | Providing laying spreding 37.5mm thick built up spray grouting including scraping cleaning the road surface applying tack coat using 3.0Kg of bitumen for 10 Sqm and laying 37.5mmthick built up spray grouting in one layer using 0.45cumof 25mm to 40mm size hard granite metal and 12.00Kg penetration grade of bitumen for 10 Sqm in each layer with 0.12cum of 12mm size hard granite chips as key stone for 10 Sqm spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with PRR including hire and running charges of PRR and all other machineries but excluding cost and conveyance of bitumen, metal and chips complete as perspecification and direction of Engineer-in-Charge | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
DTCNsubas.pdf
Tender Documents • 1.80 MB
BOQ_587489.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid