| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | ₹2.3 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C M Ravindran L1 |
|---|---|---|---|---|
| 1.00Demolishing brick/laterite work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | ||||
| 1.10 | In cement mortar | 4.5 | Cum | 800 ₹3,600 |
| 2.00Laterite masonry work using available dismantled laterite stones in cement mortar 1:6 (1 cement : 6 coarse sand) including dressing the stones to required shape and finish including necessary scaffolding etc. complete | ||||
| 2.10 | For compound wall | 4 | Cum | 7,800 ₹31,200 |
| 3.00Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | ||||
| 3.10 | Beyond 30 cm girth up to and including 60 cm girth | 3 | Nos | 1,000 ₹3,000 |
| 3.20 | Beyond 60 cm girth up to and including 120 cm girth | 3 | Nos | 2,500 ₹7,500 |
| 4.0015 mm cement plaster on rough side of single or half brick wall of mix: | ||||
| 4.10 | 1:6 (1 cement: 6 coarse sand) | 20 | Sqm | 450 ₹9,000 |
| 5.00Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces: | ||||
Tender Value
₹2.2 L
EMD Value
₹4,330
Closing Date
16 Dec 2025, 6:00 pmClosed
EXECUTIVE ENGINEER (CIVIL)
EXECUTIVE ENGINEER (CIVIL), BSNL CIVIL DIVISION, BSNL BHAVAN, KANNUR
Re-construction of damaged compound wall and maintenance works of TE building Munderi.
2025_BSNL_258474_1
21/NIT/EE-KNR/2025-26
Open Tender
Civil Works
60 days
Munderi Kannur
Please Refer Tender Documents
2 documents required · 2 mandatory
₹590
BSNL
₹4,330
30 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
16 Dec 2025
9 Dec 2025
Demolishing brick/laterite work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
In cement mortar
Laterite masonry work using available dismantled laterite stones in cement mortar 1:6 (1 cement : 6 coarse sand) including dressing the stones to required shape and finish including necessary scaffolding etc. complete
For compound wall
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 30 cm girth up to and including 60 cm girth
Beyond 60 cm girth up to and including 120 cm girth
15 mm cement plaster on rough side of single or half brick wall of mix:
1:6 (1 cement: 6 coarse sand)
Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces:
Two coats
Finishing walls with Acrylic Smooth exterior paint of required shade :
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface).
Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour.
One coat.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work.
Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge.
12mm average thickness
Applying crack filler Dr.Fixit crack- X-paste or equivalent by removing existing paints to expose the plaster at line cracks ,widening the cracks upto 2mm , apply the crack filler firmly and level the surface , allow it settle for 24 hours into the crack with a spatula or putty knife and then apply another coat, all as per the direction of the Engineer in charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
NITMUNDERI.pdf
Tender Documents • 0.90 MB
BOQ_298420.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid