| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹13.3 Craccepted-aoc | accepted-aoc |
Tender Value
₹12.7 Cr
EMD Value
₹12.7 L
Closing Date
20 Feb 2026, 9:30 pmClosed
Karnataka Industrial Areas Development Board
Technical Assistant-2
Formation of Road Construction of RCC Side Drain & Construction of Spur Culvert at Dobaspet 3rd Phase Industrial Area, Nelamangala Taluk, Bengaluru Rural District.
KIADB/2025-26/OW/WORK_INDENT400
KIADB/2025-26/OW/WORK_INDENT400
Open
Other Works
Two Tender Document System(Two Cover)
KIADB Head Office Bangalore
2 documents required · 2 mandatory
To qualify for award of this contract, each Tenderer in its/his name should have in the last five years period (2020-21 to 2024-25). Satisfactory completed (at least 90% of the contract value), as a prime contractor, at least One Similar Work such as Formation of road, construction of RCC drain, culvert, as per the scope work, of value not less than Rs.634.50 lakhs.
Executed in any one financial year, the following minimum quantities of work: (Certificates of proof shall be enclosed from competent Authority not below the rank of Executive Engineer in Government/Public Sectors/Government Undertaking Organizations). (1) Earthwork Excavation/Earth work for Embankment/ Subgrade & Earthen Shoulders: 25820 Cum, (2) Granular Sub Base/ Wet Mix Macadam: 10206 Cum, (3) BM/DBM/BC/SDBC: 1733 Cum, (4) PCC/RCC: 3984 Cum, (5) TMT Steel Reinforcement: 186 Tonne
Each Tenderer should further demonstrate: Availability by owning at least 50% of the required / specified key and critical equipment for this work. The remaining 50% can be deployed on lease / hire basis for all works provided, the relevant documents (commitment agreements etc.,) for availability for this work are furnished : (Furnish details of plant / machinery / equipment etc.,)
Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity: (AxNx1.5 - B), where, A: Maximum value of Civil Engineering works executed in any one year during the last five years (updated to 2025-26 price level) taking into account the completed as well as works in progress. N: Number of years prescribed for completion of the works for which tenders are invited. B: Value, at 2025-26 price level, of existing commitments and on-going works to be completed during the next 09 Months
To qualify for award of this contract, each Tenderer in its/his name should have in the last five years period (2020-21 to 2024-25). Achieved in at least two financial years a minimum financial turnover of Rs. 2538.00 Lakhs. (Civil Contract Works Only) (Not less than 2 times the amount put to tender)
Each Tenderer should further demonstrate: liquid assets and /or availability of credit facilities of not less than Rs.380.70 lakhs (Credit lines/ letter of credit/ certificates from Public sector banks/Nationalized Banks (as per RBI guidelines) not less than 30% of the amount put to tender for meeting the fund requirement etc).
₹7,500
₹12.7 L
20 Feb 2026
6 Feb 2026
21 Feb 2026
10 Feb 2026
10 Feb 2026
Formation of Road Construction of RCC Side Drain & Construction of Spur Culvert at Dobaspet 3rd Phase Industrial Area, Nelamangala Taluk, Bengaluru Rural District.
code01 Formation of Road : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removalof stumps of trees cut earlier and disposa... 336.45 100 Sqm
code02 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li... 12283.81 Cum
code03 Earth work excavation for Foundation by mechanical means for all works & Depth exceeding 1.5 m, but not exceeding 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 3070.95 Cum
code04 Compacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth ... 10110.66 Cum
code05 Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. complete with all... 3685.14 Cum
code06 Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,... 1349.42 Cum
code07 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee... 10255.10 Cum
code08 Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on p... 6740.44 Cum
code09 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia... 6018.25 Cum
code10 Prime Coat over WMM/WBM: Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0... 24073.00 Sqm
code11 Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. MORTH Spec... 24073.00 Sqm
code12 Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total... 1203.65 Cum
code13 Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, t... 962.92 Cum
code14 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC... 1289.63 Sqm
code15 Utility Crossing:Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, stru... 1267.50 Cum
code16 Providing and laying 300 mm diameter open jointed hume pipes with collars in rock-toe for drainage including cost of all materials, machinery, labour and all other ancillary operations complete. compl... 1755.00 Mtr
code17 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ... 592.31 Cum
code18 CONSTRUCTION OF SIDE DRAIN: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutt... 2630.84 Cum
code19 Earth work excavation for Foundation by mechanical means for all works & Depth exceeding 1.5 m, but not exceeding 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 292.32 Cum
code20 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes... 1341.21 Cum
code21 Providing and laying in position Cement Concrete for all sub structure works of bridges, drain works & other parallel works from 0.5m to 3.5m height. The granite/trap/basalt crushed graded coarse aggr... 1289.63 Cum
code22 Providing and laying in position Cement Concrete for all sub structure works of bridges, drain works & other parallel works from 0.5m to 3.5m height. The granite/trap/basalt crushed graded coarse aggr... 2063.40 Cum
code23 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 217.95 Tonne
code24 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar... 687.80 Mtr
code25 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ... 2579.25 Cum
code26 CONSTRUCTION OF SPUR CULVERT:Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strut... 255.60 Cum
code27 Earth work excavation for Foundation by mechanical means for all works & Depth exceeding 1.5 m, but not exceeding 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 109.54 Cum
code28 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes... 33.52 Cum
code29 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T... 122.30 Cum
code30 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 8.56 Tonne
code31 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar... 50.00 Mtr
code32 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ... 95.26 Cum
code33 CONSTRUCTION OF INSPECTION CHAMBER: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring... 1240.54 Cum
code34 Earth work excavation for Foundation by mechanical means for all works & Depth exceeding 1.5 m, but not exceeding 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 531.66 Cum
code35 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes... 19.13 Cum
code36 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T... 111.38 Cum
code37 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 6.13 Tonne
code38 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ... 1532.07 Cum
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Dobapet 3rd phase.pdf
Tender Document • 1.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .