Loading…
Loading…
88 results • Latest
Strengthening of 12.00m wide road adjacent to plot no. 22C & D, 8, 9 & 10 allotted to GTTC College & Construction of RCC Box Drain in Sublayout at Haralapura Industrial Area, Harihara Taluk, Davanagere District (2nd Call)
Providing additional infrastructure works at road no. 4, 5A, 9, 17, 8 & 23 to 27 of Doddaballapura - Devanahalli General Industrial Area (ITIR), Bengaluru Rural District.
Project Management Consultancy Services for the work of Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning Jackwell cum pump house, M S pipe Rising Main from Yetinahole Gravity canal to MS Gravity pipe near KWIN City including Pumping Machineries and allied works inside the pump houses, SCADA, Land Acquisition & 5 years of O&M for Providing & supplying fresh water to the industrial areas in districts around Bengaluru on EPC Basis. (Package-6) (3rd Call)
Consultancy services to carryout EIA studies, SIS etc., to obtain EC from SEIAA and CFE from KSPCB and submission of Half yearly compliance report for all the conditions of EC & CFE for-3 years for Bidaluru Industrial Area at Nelamangala Taluk, Sompura Hobli, Hanumanthapura village and Bidaluru, Kodipalya villages, Thyamagondlu Hobli, Bengaluru Rural District.
Consultancy services to carryout EIA studies, SIS etc., to obtain EC from SEIAA and CFE from KSPCB and submission of Half yearly compliance report for all the conditions of EC & CFE for-3 years for Kwin City 2nd Phase at Kodigehalli, Kenchanapura, Balagere and Hulikunte Villages, Nelamangala-Doddaballapura Taluk, Bengaluru Rural District (2nd Call)
Improvements and maintenance of Roads & water supply (Road No. 3, 5, 6, 7 & 9) at Badanaguppe-Kellamballi Industrial Area, Chamarajanagar Taluk & District.
Consultancy services to carryout EIA studies, SIS etc., to obtain Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA)/ Ministry of Environment, Forest and Climate Change (MoEF&CC) and Consent for Establishment (CFE) from Karnataka State Pollution Control Board (KSPCB) and submission of Half yearly compliance report for all the conditions of EC & CFE for 3 years for Sanjeevrayanakote Industrial Area Phase-2, Sanjeevrayanakote village, Ballari Taluk, Ballari District.3rd Call.
Providing Basic Electrical Infrastructure facilities Mummigati Industrial Area Phase-2, Dharwad District.
Project Management Consultancy Services for Formation of Industrial Layout Including Formation of 24M Wide Roads, Flexible Pavement, Construction of RCC Side Drains, RCC Box Culverts, RCC Utility Ducts, HDPE Water Supply Pipeline etc., at Itangihal Industrial Area, Vijayapura Taluk & District.(Package-1) & Formation of Industrial Layout Including Formation of 24M & 18M Wide Roads, Flexible Pavement, Construction of RCC Side Drains, RCC Box Culverts, RCC Utility Ducts, HDPE Water Supply Pipeline, ELSR etc., at Itangihal Industrial Area, Vijayapura Taluk & District.(Package-2)
Formation of Industrial Layout including asphalt roads, construction of RCC Side Drains, RCC Cross Drainage Works, Retaining Wall, HDPE Dual Water Supply Pipe line, OHT, GLSR & RWH in KGF Industrial Area, Bangaradagani Village, KGF Taluk, Kolar District.
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) for the Formation of New Industrial Areas Jeans/Textile park, including Economic Analysis, Surveying, Layout Plan Design, Preparation of Cost Estimates, Cost Structure etc., for the proposed Sanjeevarayanakote Industrial Area, Phase-2 at Ballari Taluk & District.
Formation of Industrial Layout, including Construction of Roads, RCC Side Drains, Utility Ducts, Culverts & HDPE Water supply pipeline at Sira Industrial Area Phase-2, Sira Taluk, Tumakuru District.2nd Call.
Providing Consultancy Services for preparing EIA, SIS studies etc., to obtain Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA)/ Ministry of Environment, Forest and Climate Change (MoEF&CC) and Consent for Establishment (CFE) from Karnataka State Pollution Control Board (KSPCB) and submission of Half-yearly compliance Report for all the conditions of EC & CFE for 3 years for the Chandrabanda Industrial Area, Chandrabanda, Kurubadoddai and Singanodi villages, Raichuru Taluk, Raichuru District.
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) including Economic Analysis, Surveying, Layout Plan, Design, Preparation of Estimate and cost structure etc., for the proposed Dobaspete Industrial Area, Phase 8 at Nelamangala Taluk, Bengaluru Rural District (Extent 486 A-27 1/2 G).
Part-A- (a) Construction of SC transmission line using Single side/double side cross arm Monopoles from existing 400/220kV Vasanthanarasapura PGCIL sub-station to Entry point of Vasanthanarasapura Industrial Area (Proposed 220kV CTT location). (b) Construction of SC transmission line using Single side/double side cross arm Monopoles from existing 220/66kV Vasanthanarasapura KPTCL sub-station to Entry point of Vasanthanarasapura Industrial Area (Proposed 220kV CTT location). Part-B- Running of 220kV DC 1200sqmm XLPE Copper UG cable from 220kV DC CTT Location (Entry point of Vasanthanarasapura Industrial Area) to the proposed 220/66/11kV GIS/AIS sub-station at Chennai-Bengaluru Industrial Corridor (CBIC) for a distance of 1.890 kms. Part-C- Construction of 220kV & 66kV Terminal Bays at existing 220/66/11kV Vasanthanarasapura KIADB sub-station under Self execution basis by KIADB on Total Turnkey Basis
Construction of RCC Side Drains from Accute Bearing Factory upto Road Connecting from State Highway at Doddaballapura General Industrial Area (1st Phase), Doddaballapura Taluk, Bengaluru Rural District.
Consultancy services to carryout EIA studies, SIS etc., to obtain Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA) and Consent for Establishment (CFE) from Karnataka State Pollution Control Board (KSPCB) and submission of Half yearly compliance report for all the conditions of EC & CFE for-3 years for Dobaspet Industrial Area 8th Phase at Nelamangala Taluk, Sompura Hobli, Kambalu, Machenahalli, Ghantehosahalli & Kasaraghatta Villages, Bengaluru Rural District.
Providing Consultancy Services for Survey, investigation, design, estimate and preparation of Detailed project Report (DPR) for Water Supply Scheme from Vanivilas Sagara Dam to Tumakuru Industrial Township (CBIC) via Metikurke Industrial Area and Sira Industrial Area (2nd Call)
Formation of Industrial Layout, including Construction of Roads, RCC Side Drains, RCC Ducts, RCC Cross Drainage, Retaining Wall, SWD & HDPE Dual Water supply pipe line at Sector-3 in Devanahalli General Industrial Area Phase-2 (ITIR Phase-2), Doddaballapura & Devanahalli Taluk, Bengaluru Rural District.
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of MS Pipe Gravity Main from MBR to IPS-3 and construction of Intermediate Pumping Station-3 (IPS-3), Pumping machineries and allied works inside the pump houses, 5 years of O&M for Providing & supplying fresh water to the industrial areas in districts around Bengaluru on EPC Basis. (Package-3)
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of Jackwell with pump houses at Cauvery river and Agara Tank, Impounding Reservoirs at Agara and Maddur tanks, MS pipe Raising main from Cauvery river to Impounding Reservoirs and from Agara tank to Intermediate Pumping Station-1 (IPS-1), Pumping machineries and allied works inside the pump houses, SCADA, Land Acquisition & 5 years of O&M for Providing & supplying fresh water to the industrial areas in and around Bengaluru on EPC Basis (Package-1)
Providing Consultancy for the work of Formation of 18m wide roads & 15m wide roads, including asphalting, Construction of RCC side drains, RCC cross drainage works, Sump, OHT, Rising Main, Borewell, RWH & HDPE dual water supply pipe lines, etc., at Koluru Block for Koluru Ganajuru Industrial Area, Haveri Taluk & District.
Establishment of Knowledge, Wellbeing and Innovation City (KWIN City) of Sector-2 of Phase-2, Doddaballapura & Nelamangala Taluk, Bengaluru Rural District
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of MS Pipe Rising Main from IPS-03 to Malur and Other Industrial Areas, Land Acquisition, 5 years of O&M for Providing & supplying fresh water to the industrial areas in districts around Bengaluru on EPC Basis. (Package-4) 2nd call.
Construction of Storm Water Drain from Ch.0.00m to 550.00m of Road No.35 at Sublayout-4 of Hassan Growth Center Industrial Area, Hassan District (2nd Call).
Formation of Industrial Layout including construction of Roads, Construction of RCC Side Drains, RCC Cross Drainage Works, Retaining Wall & HDPE Dual Water Supply pipe line in Sector-2 for Sub layout in KGF Industrial Area, Bangaradagani Village, KGF Taluk, Kolar District.
Improvement to Industrial Layout including reconstruction and re-surfacing of 12m wide and 18m wide roads including flexible pavement, construction of RCC side drain, RCC cross drainage in Bommasandra Jigani Link Road Industrial Area, Anekal Taluk, Bengaluru Urban District.
Providing and laying of Domestic Sewage Network at Adinarayanahosahalli Industrial Area Phase-2, Doddaballapura & Devanahalli Taluk, Bengaluru Rural District
Formation of 12.00 mtr wide road and construction of RCC Box Drain, RCC Box Culvert including providing HDPE water supply pipeline in Sublayout in plot no. 90 at Hanagawadi 2nd Stage Industrial Area, Harihara Taluk, Davanagere District (2nd Call)
Formation of 9mtr wide connecting road from Road No. 5 to Utility area 3 and construction of RCC Box Drain, RCC Box Culvert & Compound wall to Water supply area at Sarathi Kurubarahalli 2nd Stage Industrial Area, Harihara Taluk, Davanagere District.
Project Management Consultancy Services for the work of Formation of Industrial Layout including formation of 30m wide roads, 24m wide roads, 18m wide roads & 12 wide roads including asphalting, construction of RCC side drains, RCC Cross Drainage works, retaining wall & HDPE Water Supply pipe line at Sector-2 in Dobaspet Industrial Area Phase-7, Nelamangala Taluk, Bengaluru Rural District
Project Management Consultancy Services for the work of Formation of Industrial Layout including formation of 24m wide roads, 18m wide roads including asphalting, construction of RCC side drains, RCC Cross Drainage works, retaining wall & HDPE Water Supply pipe line at Sector-1 in Dobaspet Industrial Area Phase-7, Nelamangala Taluk, Bengaluru Rural District
Formation of Industrial Layout, including asphalt roads, construction of RCC Side drains, RCC Cross Drainage Works, Retaining Wall, HDPE Dual Water Supply Pipe Line, OHT, Sump, Borewell, Rising main & RWH in Kambalipura Industrial Area, Hoskote Taluk, Bengaluru Rural District.
Formation of Industrial Layout, including Construction of Roads, of RCC Side Drains, RCC Ducts, RCC Cross Drainage, Retaining wall, Nala Training Works, HDPE Dual Water supply pipe line, OHT, GLSR, Borewell, Raising Main & RWH at Sector-5 in Devanahalli General Industrial Area Phase-2 (ITIR Phase-2), Doddaballapura & Devanahalli Taluk, Bengaluru Rural District (2nd Call)
Providing Water Supply Distribution to Kadechur 2nd Phase Industrial Area, Yadgir District.
Providing Over Head Height Barrier at Various Locations at Kadechur Badiyal Industrial Area, Yadagiri District (4th Call)
Construction of RCC Side Drains from TAFE Factory upto Accute Bearing Factory at Doddaballapura General Industrial Area (1st Phase), Doddaballapura Taluk, Bengaluru Rural District.
Resurfacing of 30m wide Road No. 1, 18m wide road No. 5, 21-A, 23-A and 24A in Vasanthanarasapura Industrial Area 2nd Phase, Tumakuru Taluk, Tumakuru District
Formation of Roads, levelling of park area and Construction of drain, culverts, compound wall at the premises of M/s HAMUL in Subalyout-4 Of Hassan Growth centre industrial area, Hassan.
Formation of Industrial Layout Including Formation of 18M, 15M & 12M Wide Roads, Flexible Pavement, Construction of RCC Side Drains, Inspection Chambers, Over Head Tank, HDPE Water Supply Pipeline etc., at Manvi Industral Area, Manvi Taluk, Raichur District.
Providing Services for Drone Survey, Topographical Mapping and Cadastral Map Preparation for BMIC Phase-I Dharwad Industrial Node at Shinganahalli, Hosawal, Madikoppa, Kummanayakoppa, Koturu, Siddapur (Kallapur) and Venkatapur Villages in Dharwad Taluk & District.(Total Extent-6639 Acres)
Formation of Industrial Layout including construction of Roads, Construction of RCC Side Drains, RCC Cross Drainage Works, Retaining wall & HDPE Dual Water supply pipeline in Sector-1 for Sub Layout in KGF Industrial Area, Bangaradagani Village, KGF Taluk, Kolar District.
Formation of Roads including asphalting, construction of RCC Side Drains, Inspection Chambers, Spur Culverts, Valve Cistern, Rain Water Harvesting & Water Supply Works at Sector-1 of Gowribidnur 4th Phase in Jarabandanahalli Village, Gowribidnur Taluk, Chikkaballapura District.
Re-Surfacing of MDR Road from BM Road Junction to Bidadi Industrial Area, 2nd Phase, Sector-1 and 2 Junction (Shanumangala Village), Bidadi Hobli, Ramanagara Taluk, Bengaluru South District (Four Lane) (Ch. 0.00 to 1.90Km)
Formation of Industrial Layout, Including Construction of Flexible Pavement Roads, RCC Side Drains, RCC Chambers, RCC Storm Water Drains, RCC Cross Drainages, Laying of HDPE Pipes for Water Supply Works etc., at proposed Chintamani Industrial Area, Phase-I, Chikkaballapura District
Consultancy Services for the work of to carryout EIA, SIS Studies etc., to obtain Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA)/ Ministry of Environment, Forest and climate Change (MoEF&CC) and Consent for Establishment (CFE) from Karnataka State Pollution Control Board(KSPCB) and submission of Half Yearly compliance report for all the conditions of EC & CFE for 3 years for the Tidagundi Industrial Area, Vijayapura Taluk & District
Providing and Supplying of furnitures for KIADB Head Office new building, Gandhinagar, Bengaluru.
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) for scientific disposal of Industrial solid waste by Integrated material recovery facility (MRF) and alternate fuel raw material facility (ARF) including, survey analysis, qualitative and quantitative study, design of MRF and ARF facility etc., at plot no.311 to 314, Belur Industrial area, Dharwad, in an extent of 30.00 acres.(4th Call).
Improvements & Maintenance of Road & Drain at Rayapura Industrial Area, Dharwad District.
Re-construction & Strengthening of 24m, 18m, 12m, 9m wide Roads, construction of RCC Cross Drainage, HDPE Water Supply Line at Jigani Industrial Area 1st & 2nd Phase, Bengaluru South District