Providing Consultancy Services for Preparation of Detailed Project Report (DPR) Preparation of Economic Analysis, Feasibility Report, Surveying, Layout Plan Design, Preparation of Cost Estimates, Cost Structure etc., for the Formation of PM-Mitra Textile Park at Kalaburgi. (Extent 1000.00 Acres).
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) for the formation of new industrial areas including Economic Analysis, Surveying, Layout Plan Design, Preparation of Cost Estimates, Cost Structure etc., for the proposed Industrial Area, at Dharwad Taluk & District. (Extent 1059.38 Acres).
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) Economic Analysis, Survey, Plan Design, Preparation of Estimates, Cost Structure etc., for Construction of Common Effluent Treatment Plant (CETP) at Sompura Industrial Area (Dobaspet 1st, 2nd, 3rd, 4th, 5th, 6th Phases and Machenahalli (7th Phase) in Bengaluru Rural District. (4th Call).
Consultancy services to carryout EIA studies, SIS etc., to obtain Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA)/Ministry of Environment, Forest & Climate Change (MoEF&CC) and Consent for Establishment (CFE) from Karnataka State Pollution Control Board (KSPCB) and submission of Half yearly compliance report for all the conditions of EC & CFE for-3 years for Balakunji Industrial Area, Udupi Taluk & District in an extent of 316.79 acres
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) Economic Analysis, Survey, Plan Design, Preparation of Estimates, Cost Structure etc., for Construction of Common Effluent Treatment Plant (CETP) at Kadokala, Thandya, Adakanahalli, Immavu Industrial Areas in Mysuru District. (4th Call)
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) Economic Analysis, Survey, Plan Design, Preparation of Estimates, Cost Structure etc., for Construction of Common Effluent Treatment Plant (CETP) at Badanaguppe-Kellamballi Industrial Areas 1st & 2nd Phases in Chamarajanagara District (4th Call).
Formation of asphalt road including construction of RCC side drains, Deck slab and water supply pipeline at Sub Layout-3, Badanaguppe Kellamballi Industrial Area, Chamarajanagar Taluk, Chamarajanagar District.
Formation of asphalt road including construction of RCC Side Drains, Deck Slab and Water Supply Pipeline at Road No. 1,2 & 11 at Sub Layout-8, Koorgalli Industrial Area, Mysuru Taluk, Mysuru District.
Formation of Roads including asphalting, construction of RCC Side Drains, Inspection Chambers, Spur Culverts, Valve Cistern, Rain Water Harvesting & Water Supply Works at Sector-2 of Gowribidnur 4th Phase in Jarabandanahalli Village, Gowribidnur Taluk, Chikkaballapura District.
Formation of Balance Industrial Layout including formation of 30m, 18m & 15m wide roads including asphalting, construction of RCC Side Drains, RCC Cross Drainage works at Mastenahalli Industrial Area, 2nd Phase, Chintamani Taluk, Chikkaballapur District.
Providing Consultancy Services for Preparation of Detailed project Report (DPR) for the Formation of Housing Layout at Narendra-Mummugatti Industrial Area, Dharwad Taluk & District. (Extent 111.00 Acres).
Establishment, Commissioning of 6.0MLD Regional Combined Sewage & Effluent Treatment Facility (RCSETF) Civil/Common Infrastructure Installed Treatment Machinery Zero Liquid Discharge (ZLD) on Turnkey Basis Including Operation & Maintenance of entire plant for a period of 5 years at Mundargi 4th Phase Industrial Area, Ballari District.