WIRE FENCING WORK ON DIFFERENT AMC PLOTS ON DIFFERENT TP ROAD IN NARODA WARD NORTH ZONE(ARC)
330291
E-Tender Notice No.06_2026_27 Tender No.3
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
2 Aug 2026
2 Aug 2026
2 Aug 2026
17 Aug 2026
2 Aug 2026
Sr.No Department No.of work Total Amount
Manager (North Zone). The technical bid shall be opened online on Dt.- 19.08.2026 at
11.00 hrs. Any change / correction / corrigendum in respect of above work shall be placed
on line. Contractors arerequested to see the website before 24 hours of submission of their
Assistant Manager (North zone), Ahmedabad Municipal Corporation
NorthZone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for WIRE FENCING
WORK ON DIFFERENT AMC PLOTS ON DIFFERENT TP ROAD IN NARODA WARD
NORTH ZONE (ARC)
1 Name of work WIRE FENCING WORK ON DIFFERENT AMC PLOTS
ON DIFFERENT TP ROAD IN NARODA WARD NORTH
2 Tender Amount Rs.10,00,000/- (exclusive of GST). GST will be paid
(Estimate put to Tender) extra by AMC/Authority at prevailing rate to the
3 Tender fee Rs.900.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
4 Time Limit 12 MONTHS (INcludingMonsoon)
5 Download of Tender Complete bid documents can be downloaded with effect from
Documents Dt.17.08.2026 up to 17:00 Hrs. from the website www.nprocure.com.
6 Required registration Register “E2” classinAMC or PWD in Govt. R&B/CPWD/AMC or
equivalent register with any other state Govt. or institutions.
8 Solvency certificate Solvency certificate issued and valid in current year for an amount
equal to 20% of the Estimated amount put to tender.
9 Earnest Money Deposit Rs.10,000.00 (Demand Draft or pay order or Bank Guarantee in favor
(Bid security) of Municipal Commissioner, AHMEDABAD/) To be submitted as
(1 % of Estimate put to prescribed in 8.0 below. Demand Draft or Bank Guarantee shall be
tender) from Nationalized Bank / Scheduled Bank and valid for 120 days.(As
per AMC finance dept. circular No-5 Dt.5/5/07 & F.D. Circular No.
Dt. 7/08/2010) & attached ANNEXURE - 1 finance dept. circular No -
10 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager (NORTH zone) , Rajiv Gandhi Bhavan, Memco-
Naroda Road, Ahmedabad To be Submitted Physically As per N.I.T
11 Mode of sending the • Price bid should be submitted by online e-tender only and
TenderDocuments Technical bid should be submitted physically also in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Duplicate (One Original & One Duplicate) Each part
shall be separately duly sign & seal by contractor .
12 Last date of online Date.18.08.2026 up to 17.00 hrs.
submission of tender
13 Submission of Price Bid The Price bid shall be submitted online only. It shall not be submitted
14 Opening of Technical bid Technical Bid will be opened online as per N.I.T. in the office of
Addl. City Engineer (North Zone), Rajiv Gandhi Bhavan, Memco –
Naroda Road, Ahmedabad Municipal Corporation, Ahmedabad
15 Tender validity period 120 days from the last date of submission of Tender. it should be valid
for 120 days from the last date of online tender submission.
16 Security Deposit 5 % of Contract Value to be submitted in the form of Bank Guarantee
as per. Bank Guarantee shall be from approved list of AMC of banks
and the issuing branch of bank guarantee shall be of Amdavad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work. The Security Deposit shall
be payable in 15 days from date of receipt of LOI failing which interest
@4% per annum will be charged by AMC.
17 Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
a. Labour welfare cess 1% Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
18 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or
parts of work major part of any amount, the contractor shall be bound to start the
work within 48 hours so intimation of work. Communication done
telephonically via SMS, via whatsapp and through letter/ E-mail shall
be considered legal and binding for the same. Contractor shall bound
to execute more than 1 work at the same time as and when required by
the department.
19 During execution of works in any case if any fatal accident (major or minor) occurs due to poor work
and poor safety precautions, then it will be completely contractor’s responsibility and compensation
for the same has to be paid by contractor. During execution of works if any news is published in
print/Electronic/Social media regarding inferior quality of work and poor safety precautions, and
due to inferior quality work any fatal injuries occurs, all the losses due to such accidents and
expenses of legal matters shall be borne by contractor.
Note: Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject any or all the
tenders without assigning any reasons thereof.
The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized signatory
holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered non-responsive.
Seal and Signature of the Bidder Add.CityEngineer(North Zone)
Date: Amdavad Municipal Corporation
Finance dept. circular No-06 Dt.12.05.2025
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the Table
Sr. Name of Works Approximate Earnest Money Completion
No. value of works Deposit (Rs.) Period
1 WIRE FENCING Rs. 10,00,000/- Rs. 10,000/- 12-- MONTHS
WORK ON DIFFERENT (INcluding
AMC PLOTS ON Monsoon)
DIFFERENT TP ROAD
NORTH ZONE (ARC).
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.Tin the form of Demand Draft / Pay
Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad, payable at
Ahmedabad, which shall be non refundable. The Details of Tender fees shall be submit with scan copy
at the time of Quoting price bid of the tender and Physically to be submitted along with technical bid
Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of
Financial Condition.
5.Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi Bhavan,
Memco – Naroda Road, AhmedabadAs per N.I.T
6.The Bids will be opened on As per N.I.Tat the office of Addl.City Engineer (N/Z) ,1st Floor, Rajiv
Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road, Ahmedabad-25. in the
presence of bidders or their representatives who choose to attend. In the event of the specified date of bid
submission/opening being declared a holiday for the Employer, the bids shall be received /opened on the
next working day at the same place and the same time.
TERMS & CONDITIONS
( A) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FEATURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per N.I.T and
all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope
(marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand
Delivery in duplicate. This envelope shall be sealed in an outer envelope. The Bid envelopes shall be
marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Naroda Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for
the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY. Projects for
which incomplete information has been provided will not be considered for evaluation. The Bidder may
attach separate sheets if so required. However, the final bound document submitted, has to be submitted in
vertical A4 size (210 mm X 297 mm) except Form of Bids.
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the package (except
those received late) containing the sealed Tender volume and other enclosures then announce the names of
bidders in the presence of bidders or their representatives who choose to attend on the date and time
mentioned in the IFB. In the event of specified date of bid opening being declared as a holiday for the
Employer, the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the
opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of
EMD furnished with each bid, is valid registration and such other details, as the Employer may consider
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for
Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-responsive
and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid
EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be
rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed, meets
the eligibility and qualification criteria, has the required available bid capacity, is accompanied by the
requisite certificates, undertaking and other relevant information specified in the bid documents and is
substantially responsive to the requirement of the bidding documents and provides any clarification for
ascertaining the correctness of the information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening, Including the
information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2and qualified for award of Contract in accordance
with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time.
In the event of specified date of bid opening being declared bidders who qualify the criteria then bidder
bid will be considered for opening of price bid.(Following clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that
such bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General
Terms and Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter
shall name the sum which the Employer will pay the Contractor in consideration of the execution,
completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7.Asper City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder has to
deposit security deposit / Bank Guarantee with in 15 days after receiving letter of Indent. Time limit
of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion, ask
any bidder for authentication the correctness of the information/details furnished by him in his bid. Such
request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from the
time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on
its own responsibility all information that may be necessary for preparing the bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury, loss of
or damage to property and any other loss, damage, costs and expenses incurred as a result of the
vhevºt lk-28 <&t ltKktFt<t vhevºtlk 31,32 <t.7/7/2017 îtht<t.1/7/2017 vAecnthvtzJtbtytJuj
/ytJlthxuLzhbt (bxehegÕm + juchmÃjtgmt&u)
G.S.TltltuxeVefuNlbwscG.S.Tsgtjtdwvz<tuntugðgtmoehnwftbltcezhuG.S.TltuxeVefuNlbwscleyuÃjefucujexeægtl
bthtFexuLzhlwkcezekdfhJtlwhnuNu.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in
the table given in the IFB.
1.2 The Works consist of:
WIRE FENCING WORK ON DIFFERENT AMC PLOTS ON DIFFERENT TP ROAD IN NARODA
WARD NORTH ZONE (ARC)
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for Required class and or
equivalent with specialization in road works. If contractor is not registered with AMC in the relevant
class, on award of contract he shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to
provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown, produced
or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be provided for
all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regardinglitigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non-performance of the contractor, consistent history of litigation awarded against the
applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or
false representations in the forms statements etc. for the period to be decided by the Employer
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply
with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which are
not substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished by
the bidder may be in another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of interpretation of the bid, the English
translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as described
in bidding documents, based on the percentage rate amount in the Bill of Quantities submitted online by
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures
and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and the
responses thereto shall be made in writing or by fax. A bidder may refuse the request without forfeiting
his bid security. A bidder agreeing to the request will not be required or permitted to modify his bid but
will be required to extend the validity of his Bid Security for the period of the extension, and in
compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the person
or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the Employer
will direct him to submit the Performance Security and attend the Employer's office on a date determined by
the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer
will declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract
by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has engaged
in corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or induce
others to do so, by misusing the position in which they are placed, and it includes the offering,
giving, receiving, or soliciting of anything of value to influence the action of any such official in
the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e.
public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic
signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to
be provided so that it should be visible at night. During night working hours safety in charge personnel
shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site Including traffic signages, safety cones, traffic blinkers,
barricading tapes, red and green flags etc for making easy smooth and safe conditions for the
traffic. The Contractor shall and must provide above at his own cost.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company,
follow up and getting the supply, filling the necessary test reports to the power supply company. All
official fees Including security deposits and other expenses shall be of initially paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Addl. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINANCIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer
will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments Including advances, if any, shall be made in Indian Rupees.
2.Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for
28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly as
possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the
bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3.(A) SecurityDeposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful bidder shall
deliver to the Employer, a Initial Security Deposit in the form of a Bank Guarantee for an amount
equivalent to 5% (five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued from any Nationalized or RBI approved foreign bank having net worth of more
than Rs.500 Crore of Indian Operation and acceptable to Employer.
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along
with release of payment of Final Bill.
4. Approved Bank: - As per AMC finance Department Circular
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - Compensation for (0.10%) zero point one percentage of Delay contract price for uncompleted
work per day subject to a maximum up to ten percentage of contract price or as decided by Municipal
9.Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in the
rates and prices and the total bid price submitted by the bidder and the evaluation and comparison of bids
by the Employer shall be made accordingly.
10. Qualification of the Bidder
10.1 Experience of bidder
Experience of having successfully completed similar works during last 7 years ending last day of
month previous to the one in which applications are invited should be either of the following.
10.2 Bid Capacity
Assessed Available Bid Capacity = (2 AN –B), where
A= Maximum value of sum of all the contracts executed in any one year during last five years (updated to
the current price level) which shall take into account the completed as well as work in progress :
B= Value of the existing commitments and on-going works to be completed during the next two years
N= Number of years prescribed for completion of the works for which the bids are
Note - 1 : The statements showing the value of existing commitments and on going works as well as the
stipulated period of completion remaining for each of the works listed should be countersigned by the
Engineer-in-charge, of the firm or the relevant division/department of the firm, not below the rank of
Manager / Chief Engineer / ExecutiveEngineer.
2.:- An affidavit duly notorized on Stamp paper of Rs.100/- showing all on going works shall have to
be enclosed while bidding the tender.
Even though the bidders meet the above criteria, they are subject to be rejected, if they have:
(a) made misleading or false representation in the form, statements and attachments submitted, and/
(b) Record of poor performance such as abandoning the work, not properly completing the contract,
inordinate delays in completion, litigation history, or financial failures etc.
• Sub-Contractors' experience and resources shall not be taken into account in determining the
bidder's compliance with the qualifying criteria.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of Gujarat State
Road and Building Department / Water Resources Department shall be applicable. Binding on the
contractors unless specifically mentioned about it hereunder in clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of Gujarat
“wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State Public
Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer wherever
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad Municipal
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading “NOTICE
INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work ofWIRE
FENCING WORK ON DIFFERENT AMC PLOTS ON DIFFERENT TP ROAD IN NARODA WARD
NORTH ZONE(ARC)
OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per Memorandum
of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as under-
Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in Tender
Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSEunder the heading
“TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately elsewhere in the
tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given separately
elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to that letter,
contractor shall have to arrange for Security Deposit within 15 days. If S.D is given within 10days of
issuance of Letter of Intent, time limit shall be counted from that date. If S.D is given after 15 days of
issuance of letter of intent, contractor shall be finned Rs. 200/- per day of delay and shall be deducted
from contractor’s bill. In this case time limit shall start latest by the 10th day of letter of intent,
Security Deposit of 5% of tender amount shall be deposited by pay order, demand draft, . of
nationalized bank /scheduled bank by pay order, demand draft, . of nationalized bank/scheduled bank
only. Contractor shall have to sign contract paper with AMC.
3. In case of earnest money . bounce back, contractor’s tender shall treated as cancelled and the
contractor shall not be given any tender, offer, quotation work in AMC for one year.
4. Conditional tender shall not be accepted
5. Tender validity period is 180 days from the date of opening of tender
6. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which tender to
be accepted and awarded.
7. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1 form
conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be final.
8. Contractor shall have to deposit Earnest Money deposit with tender.
9. Work shall be allotted as per contractors registration class.
10. Contractor shall have to work in such a system that there shall be nodamage to any service line of
electric, telephone, gas, any type of service cable ,drainage or water lines etc. In case of damage to
service line, the whole responsibility of accident shall be on contractor’s shoulder. It will be
responsibility of contractor to safe guard the labours against any accident or damage of lives. In case
of police complain, Contractor shall be held responsible for negligence. In case of soil /land collapse,
contractor shall be held responsible for not supporting the soil suffering with strutting, shuttering
Contractor shall safeguard the labour before allowing the labour to enter in excavated or other site. In
case of accident to labours, contractor shall be held responsible for police complain against him.
AMC’s staff shall be responsible for any accident at the site of the work.
11. Contractor shall take insurance of his all labour. and supervisory staff
12. Only registered contractor shall quote the tender , If the contractor is registered with government then
they shall have to apply to registration in AMC within 90 days from the date of work order.
13. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put up on
AMC’s web site.
14. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
15. Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
16. As per site conditions/requirement of site, there shall be increase or decrease in tender item quantities.
In such case contractor shall not have right to any price rise. In case of decrease in any tender item
quantity, contractor shall not ask for compensation.
17. If any construction material brought to site by contractor , is not as per specification, or any inferior
quality material brought to site, then such rejected material shall be removed from the site within
hours, otherwise AMC can throw away such material at any place and recover the amount for such
removal work from contractor bill. In this case contractor shall not be entitled for compensation.
18. Cost of testing of material shall be done by the contractor. He shall provide vehicle for taking
material/staff from site to testing laboratory/ manufacturing site and contractor shall be bear the cost of
transportation of staff and material.
19. Contractor shall work as per labour Act. Contractor shall not be given any payment if labour act
rules are not followed or insurance of labour is not taken for work
20. Contractor shall deposit the material on site in such a way that it should not become obstruction to any
21. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
22. If asked by AMC Engineering staff, contractor shall take photograph of site of work/before start of
work, during work and after the completion of work, with digital camera and deposit to AMC office or
transfer photograph from camera to AMC computer. No additional cost shall be paid.
23. In case of cancellation/rejection of tender, contractor shall not be entitled forany compensationOr
24. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If item is not
available in SOR, then market rate shall be derived by the Eng. dept by rate analysis. Contractor shall
not ask for the rates as per his rate analysis. This should be clearly understood and taken in to
consideration while quoting the tender by the contractor.
25. During execution of work, contractor shall take safety measures like protection by ropes, drums,
danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement & instruction of
Engg.- in- charge. In case of accident due to lack of protection, contractor shall responsible for police
complains, compensation etc AMC staff shall not be held responsible for contractors negligency.
26. If instructed by AMC officials, contractor shall have to keep daily progress register and get is signed
by Ass. city Engineer. Contractor shall maintain record of daily No. of labours, employed, work done,
rectification work carried out by contractor after Eng.-in-charge inspection & the compliance of the
same. If such rectification work is not done by contractor within 24 days the contractor shall be finned
Rs. 250/- day of delay & shall be recovered from the contractors bill
27. Contractor is not entitled for any type of compensation or right for the cancellation of tender or tender
items by any means.
28. If work is not completed within specified time limit penalty shall be recovered from bills as per tender
29. Deduction from bills shall be done as per rules prevailing or the rules which shall come in to force, by
State or Central Govt.
30. 1% amount shall be deducted for labour welfare fund as per state Govt order.
31. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site requirement
during execution of work.
32. All above conditions shall over rule the conditions given in Form B-1
33. Contractor shall have to register the work as per labour act & as per building safety act, 1906 with
,Dy.Director building safety act,Shram bhavan, 5th floor labour commissioner office, Khanpur,
34. Befor quoting tender, contractor shall have to take complete information of the work after seeing site
and from the concerned Asst. Engineer or Asst. city engineer.
35. In case of the bank detail are not given then EMD return procedure shall be delayed.
36. Before quoting the tender contractor should know that, he has seen the site & understood the item of
works, site conditions. He should be in a position to provide labours at the time of festivals like
Holi,Diwali, Navratri,Marriageseason,rainy season or any other time of the year Contractor can not
say that he has no labours due to festivals.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
ltu^ :- vhevºt lk-28 <&t ltKktFt<t vhevºtlk 31 <t.7/7/2017 îtht<t.1/7/2017 vAecnthvtzJtbtytJuj
/ytJlthxuLzhbt (bxehegÕm + juchmÃjtgmt&u)
G.S.TltltuxeVefuNlbwscG.S.Tsgtjtdwvz<tuntugðgtmœhnwftbltcezhuG.S.TltuxeVefuNlbwscleyuÃjefucujexeægtl
bthtFexuLzhlwkcezekdfhJtlwhnuNu.
cezhuxuLzhbtk<ubltChujCtJytkfz<&t NçœtubtkcLlubtChJtlthnuNu. NçœtubtkCtJChuj l
ntug<uJtxuLzhtuytvtuytvhœdKJtbtkytJNu. <&t
ytJujyLgcezhtuvifemit&eytuAtytJujCtJltxuLzhlebkswhebtkdJtbtkytJNu.
ybœtJtœBgwrlrmvjftuvtuohuNl
ftbbtxulwkxftJtheœhJt¤wkxuLzhyluftuLx[tfx
xuLzhhbtxule Nh<tuu
1 xuLzhhlejtgft<
1 y: ytxuLzhsu<u Jdolty.Bgw.ftuy&JtfuL÷ y&JthtsgmhfthlebtLggtœeltftuLx[fxhtu Che NfNu.
dJobuLxltbtLgftuLx[[tfxhuy.Bgw.ftuvtuo.btkbtLgftuLx[[tfxhtulegtœebtkkhSMxu[NlfhtJJtlwkhnuNu.
1 c: btLg ©uKeltftuLx[tfxh<hefultuk^Keltkk «btKvºtleMJ«btKe<fhujlfjxuLzhmt&ustuzJtlehnuNu.
1 f: ftbsJtcœthxuLzhh<ubssuxuLzhhmwaJujftuLx[tfxhle ©uKeytJ<t ntug<ubsftbfhJtmûtbntug<ublus ytvJtbtkkytJNu.
ftbyvt<t vnujtftuLx[tfxhuftbmkk<tu»tfthf<ubsxtRbjebexbtkkvwÁkfhJtsYhemJj<, ylwCJ, ûtb<t
yluVtgltLmegjhemtumohswfhJtlthnuNu.
1 z: ybœtJtœBgwrlrmvjctuzoXhtJlk - 3836,<t.25/11/2011 &e b¤ujbkswheylwmth<&t mexe.Rsluh mh¾gwjh,lk -17,
<t.09/12/2012 bwscybœtJtœBgwrlrmvjftuvtuohuNlbtkftuLx[t¾xh hSMx[uNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve
ylubtvœkztuægtlbtkhtFe<u bwscybjfhJtltuhnuNu.
1 R: xuLzh Ch<t vnujtxuLzhhumtRxrlheûtKfhejuJwk. xuLzhhftblt «fth, ngt<hM<t, vtKebtdo,
mkkathyluJvhtNltceòhM<tytu&emkk<wÐntuJtlwkbtlejuJtbtkkytJNu. xuLzhhuftblumtRxylurcÕzekkd(fu suftbfhJt,
ftbvwhwkfhJt<&t ftbltbuRxulLmbtxucltJujntug).<ubsxuLzhhuytmtRxltftbbtxu, rcÕzekkdbtxu, gtzo, zevtubtxulesøgtvtu<tle
he<u bu¤JejuJtlehnuNu. (xuLzhlwkftbfhJt, ftbvwhwkfhJt<&t ftbltbuRxulLmbtxulesøgt)
2: ytftblembgbgtoœtbubtuhuLzbbtsKtJuj «btKu le hnuNu.
3: xuLzhJujezexervhegz( 120 ) rœJmmw^elehnuNu.
4: xuLzh Ve yluR.yub.ze.
4 y: xuLzh Ve zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzh Ve ChJtlehnuNu. xuLzh Ch<e JF<u
yluoMxbleChJtlehnuNu. ytuAehfblexuLzhVe,R.yub.ze fu xuLzh Ve, rJltltxuLzhtuhœct<j (fuLmj) dKtNu.
4 c: xuLzhmt&ubwfJtbtytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhkxe/zebtLzz[tVxMJefthJtbtkytJNu.
œhufxuLzhœeXyjdR.yub.zeChJtlehnuNu. R.yub.zehfb Yt.1 fhtuzmw^eleykœtS<hfbltftbbtxu htu¾zt, zebtLzz[tVx,
cukfduhkxeltMJYvbt<&t Yt. 1 fhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze le hfbbtºtzebtLzz[tVx, vu ytuzoh fu
cukfduxheltMJYvbtkytvJtlehnuNu. yLgftuR he<u ChujR.yub.ze. btLghtFJtbtklnekytJuyluxuLzhhœct<j XhNu.
4 f: xuLzh Ve <&t R.yub.zelehfbltze.zevtA¤ ftuLx[tfxh©eyuvtu<tlemkM&tlwltb<&t
btuctRjlkchyluvtxeoftuzyJ~gjFJtltuhnuNu.
4 z: cukfduhkxebtºtybœtJtœNnuhle s MJefthJtbtytJNu.
4 R: ytuAehfblexuLzh Ve, R.yub.ze fu xuLzh Ve, rJltltxuLzhtuhœct<j (fuLmj) dKtNu.
5 y: xuLzhVtuboyluylwmwrabtkkleœhufuœhufFtjesøgtxuLzhChlthu Che xuLzh ztu¾gwbuLxm vh<fhJtlthnuNu.
5 c: fJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu hnuNu.su ftuLx[tfxh©eytuyuhSMx[uNlheLgwfhJuj l ntug<u
ftuLx[txh©eyuxuLzhChJtlne.
5 f: ftuLx[ftxhtuyuxuLzhbtcukflwltb,Ft<t lkch ,btRfhlkch, mhltbw ,btu.lkch,vtxeoftuz ,RbuRjytRzeMvÐyûthtubtjFJw.
5 z: ytxuLzhtuzwÃjefuxftuveytumt&uCheluWvhtuf<mhltbuYcY/hSMxhyuze./MvezvtuMx/ fwheyh&e
rlg<mbgbgtoœtbtbtufjJtlthnuNu.mekdjxuLzhftuve/mnefgtoJdhleftuvehœfhJtbtytJNu.
6: ftuLx[tfxhtuyuleaulectc<tuft¤SvwJofJtkkaJtrJlkk<e Au.
1) J^w fu ytuAtlexftJtheltœhNçœtu<ubsytkkfztbtkkytvJt. xuLzhChlthuyt he<u cl<e
hfbvKFtltbtkl tuk^JeyluhfbltufwjmhJt¤tubwfJtu.
2) ftuRfkkvlelultbuxuLzhjuJtbkktytÔgwkntug<tufkvle J<e
xuLzhvhmnefhlthÔgrf<luyr^f]<fh<wkbwFðgthltbwkxuLzhmt&uhswfhJtlwkhnuNu.
3) ftuLx[tfxhuRLfbxuûtmkkckr^<vtllkch<&t cukfzexuRjytvJtlehnuNu.
4) ftuLx[tfxhvtmuydtWltylwCJtykdult «btKvºttulelfjxuLzhmt&uhswfheNfNu.
5) xuLzh Nh<tuyluMvuNeVefuNl<&t CtJvºtfltœhufvtltylurJd<tuvhftuLx[tfxhumnefhJe.
6) <btbmw^tht, AufAtfyluDwkxujtjFtKvhftuLx[tfxhuxwkfemnefhJe.
7) xuLzhbtstuftuRmw^thtJ^thtntug<tu<u ykduxuLzh Ch<t vnujtAuÕjuœeJmurlg<JucmtRxy&JtJtuzofauheyusYhe<vtmfhelu s
xuLzhChlthlusKtJJtbtkkytJu Au fu xuLzhœM<tJustultjFtKbtkftuRAufAtf fu VhuVthfhJtœuJtNulrnyluytJeftuRAufAtf fu
VuhVthjuJtNulrn, <ultkkjFtKbtkkftuRCwwjntug<tu<ul t vh l Dwkx<t FtuxtjFtK fu ytkkfztvhAuftubthelu<ult mtawkjFtK fu
ytkkfztMvÐWfju<u he<u jFJt. «ðgufmw^thtvhxwkfemnefhJe.
8 y: xuLzhhswfh<tkkvnujtFtmfheluxuLzhbtkœNtoJujmwaltytulwkvtjlfhJtbtkkytÔgwlrnntug<tuxuLzhybtLgdKJtbkktytJNu<ule ltuk^
juJtrJlk<e Au. J¤eytVtubolwkbwFv]ƒyluftuLx[tfxhtultbtdoœNolbtxumtbtLgrlgbtu
ylumwaltytuvKft¤SvwJofJtkkaJtrJlkk<e Au.
ftuRvKfthKœNtoÔgtrmJtgftuRvK fu c^txuLzhtuyMJefthfhJtltunfyctr^<hnu Au.
xuLxhhuctujvtuWLxvulltcœjuNtneJt¤evul&eChujtxuLzh<whk < s ybtLgdKJtbktytJNu.
8 c: Wvhlectc<tuWvhtkk<xuLzhleaultmkkstudtubtkk<h<ybtLgXhJtluvtºt&Nu.
xuLzhChlth, rlg<ftby&Jtftbbtxubkswhfhujy&JtCtJvºtfltftuRftuzy&Jtvîr<y&JtrJd<tubtkkbwfuj
Nh<y&Jtmw^thtbtkkftuRVuhVthmwaJ<t ntug.
xuLzhlwkftuRvtlwk fu vtltftZeltkkÏgwk/ltkkÏgtntug fu cœÕgwk/cœÕgtntug.
c^tmw^thtJ^thty&JtatukxtzujeftvjeytuWvhxuLzhChlthuxwkfemne l fhentug.
xuLzhbtk<ubKuftuRAufAtffhentug, ylu
xuLzhChlthy&JtvuZelectc<btkkœhufCtdeœthy&Jt<u ykkdulwkbwFðgthltbwk ^htJlthÔgrf<mne l fhuy&JtxuLzhbt<u
btxuhtFJtbtkkytJujesøgtbtkkmne/mneytuWvhftuRmtûteyumtFfhe l ntug.
8 f: Nh<e xuLzhMJefthJtbtkytJNulne.
8 z: xuLzhMJefthJw ,hœfhJw, ftuluytvJwylufgtCtJ&eytvJw<u ykduBgwrl. frb§h©elturlKogytFhehnuNu.
ftuRfthKmhstuftuLx[tfxhluftb l ytveNftg<tu<u ykkduftuLx[tfxhftuRvK «fthltulwfNtle fu J¤<hltunffœtJtufheNfNulrnfu
ftgœtfegftgoJtneytykkdu&RNfNulrn. xuLzhbkswh>ltuy&oftbytve s œuJtlwk Au <uJtu&RNfNulrn.
8 R: xuLzhbtkftuLx[t¾xh îthtChujtCtJ<btb «fthltsu<u «J<o<t mhfthexuûtmrn<ltCtJdKJtbtkytJNu.
ylu<ubtkatjwftbœhBgtlsuftuRVuhVth&Nu<ultuJ^thtuawfJJtbtkytJNulrnk.
9: rJmkkdr<ylurnmtc stud:
nt& ^hJtltftbtulectc<œNtoJ<t CtJvºtfbtkltsÚ&tyluhfbleftuRvKCwjawfleaultrlgbtuylwmthmhChfhJtbtkkytJNu.
xuLzhChlthuœhltFtltbtkksKtJujNçœtuyluytkkfztJåauftuRymkkdr<ltfumbtkkNçœtubtkksKtJujhfbbtLghtFJtbtkkytJNu.
10 y: ftbltu «tud{um mbgbgtoœtbwscfhJtltuhnuNu. ytmbgbgtoœt 10 jtFmw^eltftbbtxuyuj.ytu.ytR. ytÃgt<theF&e
rœJm<&t 10 jtF&eWvhltkftbbtxuyuj.ytu.ytR. ytÃgt<theF&e 15 rœJm&e NY &gujdKJtbtytJNu. <&t <u
mbgœhrbgtlftble 5% juFuzevtuÍex Che fhthvºtfhJtltuhnuNu.
10 c: mûtbm•ttîtht Yt.10,00,000.00 (œmjtF) mw^eltxuLzhlebkswheltuXhtJvtzgtctœ( LOI) ytvJtbtkytJNuðgthctœrœl -
btk rm¾gtuhexe zevtuÍexsbtfhtJJtlehnuNu. rm¾gtuhexe zevtuÍexbtuzeChJtltrfMmtbtkBgwrl.ftuvtuohuNlbtk
«JoðbtlrlgbylwmthftgoJtnefhJtbtkytJNu.
10 f: bkswh&gujxuLzhlembgbgtoœtbtkftbdehevqKo l &tg<tusuxjtrœJmftbdehebtuzevqhefhujntug<uxjtrœJmlevulÕxexuLzhhfb
(fhthrfkb<) lt 0.1 % bwsc «r<rœJmbwscxuLzhbtkbkswh&gujmbgbgtoœtctœltFhuFhctfeftblehfbltbn•tb 10% juFu
(jefJezexezubuSm) vulÕxeJmwjfhJtbtkytJNu.
11 y: awfJKexuLzhChujœhvwhtk&gujtftbbtxult Au ylu<ubtkbswhe, vtjF, ÃjtLx, œuFhuF, mrJom-ftbdehe, Jes¤e,
htugÕxeJduhu<btbFaoltu<&t sYhsKtgðgthuht<vt¤eltftblujd<t J^thtltFaoltumbtJuN&NuyluxtkkfujtCtJ fu œhfh<t
J^thtleftuRawfJKeykkdult<ubltftuRœtJtægtlbtkkjuJtNulnekk. xuLzhChlthFtuxehswyt<lufthKuy&JtftuRÔgrf<yu (vAe<u
ctkk^ftbrJCtdltufboathentug fu l ntug) <ubluytvujebtne<eluyt^thuvtA¤&e ftuRœtJthswfhJtnfœthhnuNulnekk.
<ublwxuLzhChJt<&t <ubtkkswœtswœtCtJyluœhChJtbtxusYheyuJe<btbbtne<e vtu<tltvûtu l bu¤JeNfJtlufthKuvtu<u
xuLzhhswfhJtluje^uy&Jt<ubtkk&eWCt&<t ftuRstuFb fu sJtcœthebtkk&eAxfeNfNulnekk. mœhftbbtkftuRvK
ò<ltctk^ftbltbxehegjWvhCtJJ^thtuytvJtbtkytJNulrnk.
11 c: ftuLx[tfxhtuluvubuLx / hlekdcejBgwrl. frb§h©eltsu<u «JoðbtlrlgbbwscfhJtbtytJNu. <&t Bgwrl.
frb§h©e/mexeRsluh©eltsu<u JF<ltk mh¾gwjh «btKuftbdehe/ybjfhJtckDlf<othnuNu.
11 f: ftuLx[t¾xhlt œhufhlekdcejbtk&eftuLx[t¾xhlu awfJJtle&<e fwjhfb (xuLzhbwsclwkvubuLx+ yu¾Mx[t ytRxb) Wvh 2 %
juFuhexulNlbleftvJtbtkytJNusuVtRljcejbtkvh<ytvJtbtkytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<ltftgœtbwscsuftuRhfblefvt<fhJtle&Nu<u
bwscftuLx[[tfxhltcejbtkk&efvt<fhJtbtytJNu.
12: yu)fhthmkkc^eœM<tJustufhthltydðgltCtddKtNuylu<u mD¤tmne<ltfhthmbd{ ftblujtdwvzNu.
ce)xuLzhbtkœNtoJujftbmkkck^eœM<tJusbtkkœNtoJujrJd<btkkrJmkkd<<tltrfMmtbtkleauœNtoJuj
¢btlwmthœM<tJusbtkkœNtoJujrJd<d{tnghtFJtbkktytJNu.
(2) xuLzhVtubolwkCtJvºtf
(3) MvuNeVefuNl
z[tuRkdbtkfœ, ytfth, ytkkfztfœtaFtuxtntug<tubtvujtkkfœ, ytfthluylwmhJwk.
(2) xuLzhVtuboleylwmwra-ce
(3) MvuNeVefuNl
CwjChujt fu FtuxtJKolltrfMmtbtkkytmkkck^eWvhefûttyurJmkkd<<t ykduleltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.lebkswhebu¤JJtbtkytJNuylu<u bwscfhJtbktytJujrlKogykkr<b dKJtbkktytJNu.
13 :xuLzhhuz[tuRkd fu MvuNeVefuNlbtkkhnujeftuRûtr< fu FtbeltuduhjtCjuJtlefturNN l fhJeyluRsluhRl-atsoÃjtl<&t
MvuNeVefuNlleûtr<ytumw^thJe<&t <ulwkmtawky&oDxlfhtJJwk.
14 :ytWvhtk<y.Bgw. ftuvtuo. ltslhjftuLx[tfxfLzeNlvKbtLghtFJtlehnuNu.
15 :yufe JF<u yuffh<t J^wsøgtytuyuftb NY fhJtltuJfoytuzohb¤u<tuftbyufmt&u s c^u NY fhJwvzNu.
16 :atjwftbumrJomjtRllulwfNtl l &tg<u he<u ftbfhJtlwhnuNu. stuftuRmrJomjtRllulwfNtl&Nu<tu<ule mkvwKosJtcœthe (òlbtj)
ftuLx[tfxhlevtu<tlehnuNu. mtRxWvhftbœhBgtlbswhtu fu sl<tltftuRbtKmltòlbtjlulwfNtl&tg<ule
sJtcœtheftuLx[tfxhlehnuNu. vtujemVhegtœ&tg<tu<ule sJtcœthevKftuLxtfxhlehnuNu. CuFz ^me l vzu<ule
sJtcœthevKvtujemVhegtœbtftuLx[tfxhlehnuNu. CuFzDme l vzu<u btxumjtb<eltvdjt (suJt fu œtuhzwk kctk^ebswhFtztbtkk
W<thJt, mtuhekkdylu Mx[[xekkdfhJtrJduhu) je^tJdhbsqhluFtztbtkk k k W<thNu<tuftuLx[[tfxh s vtujemVhegtœbtsJtcœthhnuNu.
Bgwrl.ftuvtuohuNlltuftuRvKMxtVytltbtxusJtcœthhnuNulrn. Btswhtul turJbtuvK W<thJtu.
17 :bxehegÕm fu ceòxuMxedhevtuxoftuLx[tfxhuvtu<tltFauoftuvtuohuNlsKtJu<u søgtyufhtJJtlthnuNu. bxehegÕmjtJJtfu
jRsJtltumkvwKoFaoftuLx[tfxhuCtudJJtltuhnuNu.
18 : M&¤ vrhrM&r< / sYhegt<bwscftbfhtJ<t xuLzhltytRxbltsÚ&tbtk J^ ^x &tg<turlgbylwmth<u
ykduftbfhJtftuLx[tfxhck^tgujt Au.
19: mtRxvhjtJJtbtkytJujbtjmtbtlhesufxfhJtbtytJu<tu<whk<rœl 1btk vh<jRsJtltuhnuNu. yLg&t<ule
lwfNtllesJtcœtheftuLx[tfxhlehnuNu.
20 :ftuLx[tfxhlusuftuLx[tfxytvJtbtkytJuAu.<ubtmhfth©elt
«Joðbtlrlgbbwscve.yuV/juchyufx/vtujemltftgœtlwvtjlfhJtlwkhnuNu<&t ytykduBgwrl.ftuvtuohuNlîthtsubtne<e
btkdJtbtkytJu<u ytvJtlehnuNu.
21: ftuRvKftgœtfegjexeduNlybœtJtœNnuhleftuxobthnuNu.
22: btjsu<u MxtumoWvhy&JtmtRxWvhjtuftululz<h l &tg<u he<u mwaltbwsc W<thJtltu<ubsdtuXJJtltuhnuNu.
23: ftuRvKmhfthefhJuhtChJtle<btbsJtcœtheftuLx[tfxhlehnuNu.
24: ftuLx[tfxhîthtxuLzhbtœNtoJujMveNeVefuNlbwscMxtLzzobxehegÕmMvuNeVefuNlbwscjtJJtlthnuNu.<&t
xuMxekdfhtJJtlwkhnuNu.<&t y ykdu «JoðbtlBgwrl.ftuvtuohuNltrlgbtulwvtjlfhJtlwhnuNu
25: ytxuLzhbtkkstuftuRytRxbhnedRntug<tu<u y&Jt M&¤ rM&<e bwscxuLzhbtkmbtJuN l
ntug<uJeJ^thtleftbdehefhJtle&tg<uJtrfMmbtkBgwrl.ftuvtuohuNlt
«JoðbtlrlgbylwmthJ^thtleytRxbltCtJlffefhJtbtkytJNuylu<u bwscawfJKefhJtbtkytJNu.
26: atjwftbœhBgtl «tuxufNllemkvwKosJtcœtheftuLx[[tfxhlehnuNu. subtkkvevzt,œtuhzt, Cgmwafctuzo,ÃjtMxefvxe,rJ.
ftuLx[tfxhujtJJtlwkylumtaJJtlwwk hnuNu. yluftuRvKyfMbt<&Nu <tu<ule mkkvwKosJtcœtheftuLx[tfxhlehnuNu.
27: M&¤ WvhatjwftbdeheœhBgtlftbfhlthftuLx[tfxhltbswh /
fboathey&JtyLgÔgrf<ltyfMbt<ltrfMmbtkjuchyufxbwscfhJtle&<e ftgoJtne<&t
vtujemftgoJtnelesJtcœtheftuLx[tfxhlehnuNu.
28: stuMxtVmqaltytvu<u bwscmwaltvtu&eftuLx[tfxhuhtFJtlehnuNu. <ubtœhhtusfhujftbdehe<&t yr^ftheytuyuftbmw^thJt fu vtu{d{um
J^thJtltltuk^ fhujntug<tu<ulwkftuBÃjtgLmytvJtlwkhnuNuytJeltu^ltsJtc l &gufu <u «btKu M&¤ Wvhybj l
&guftuLx[tfxhluvulÕxefhJtlemððttyuze.mexeyuLSlehgh©eluhnuNu.
29: œhufytRxbltMvuNeVefuNlybœtJtœBgwrlrmvjftuvtuohuNlltkbkswh&guj<&t btLghtFujMvuNeVefuNl
Nh<tubwschnuNusuytRxbbtkMvuNeVefuNl l
ntug<uJtmkstudtubtkyuze.mexe.yuLSlegh©elturlKogytFhehnuNu.JtuxhekdfhJtbtklrnytJu fu
œhhtusJ^thtltuzucheÍWvtzJtbtklrnytJu<tuftuLx[tfxhltFauoylusutFbuJdhltuxemuJtuxhekdfhtJJtbtk<&t
zucheÍWvtzJtbtkytJNuylucejbtkk&ehfbftvejuJtbtkytJNu.
30: juchJuÕVuhVkkzbtxuntjbtkkhtsgmhfth©eyufhujnwfbbwsc 1%(yufxft) hfbcejbtk&eftvejuJtbtytJNu.
31: vhevºt lk-28 <&t ltKktFt<t vhevºtlk 31 <t.7/7/2017 îtht<t.1/7/2017 vAecnthvtzJtbtytJuj/ytJlthxuLzhbt
(bxehegÕm + juchmÃjtgmt&u) G.S.T ltltuxeVefuNlbwsc G.S.T sgtjtdwvz<tuntugðgtmœhnwftbltcezhu G.S.T
ltuxeVefuNlbwscleyuÃjefucujexeægtlbthtFexuLzhlwkcezekdfhJtlwhnuNu.
32. mefgwhexezevtuÍex/ vVtuobLmduhxelehfb Yt.1 fhtuzmw^eleykœtS<hfbltftb,ze.ze ,cukfduhkxeltMJYvbt<&t Yt.1
fhtuz&eWvhleykœtS<hfbltftbbtxumefgwhexezevtuÍex / vVtuobLmduhkxelehfbbtºt ze.ze.,vuytuzoh,
cukfduhkxeltMJYvbtytvJtlehnuNu. zebtLzz[tVx / cukfduhkxe ‘‘ Bgwrl.frb§h©eybœtJtœ ’’ltltbltuytvJtltuhnuNu.
33.ybœtJtœ BgwrlrmvjftuvoutuhuNlBgwrlrmvjfrbNlh©elemuLx[j yturVm mh¾gwjh lk 41 bwscxuLzhhyultufheœt<t
<hefuhSMxu[NlVhrsgt<fhtJJtlwhnuNu.
34.ybœtJtœ BgwrlrmvjfrbNlh©ele<t.16.02.23 le bkswhebwsc“ «J<obtlS.yum.xe. J^thtltuawfJJtbtkytJNu”
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtkJfoytuzhytÃgtctœftb NY fhJtlembgbgtoœtbtkftuLx[tfxhîthtftb NY fhJtleòKfgtoctœ
fjtfltftb NY lrnfhJtbtkytJu<tuyLgftuLx[tfxhvtmubtfuoxhux&eftuLx[tfxhltFaouylustuFbuftbdehefhtJJtbtkytJNu.
2. ftuLx[tfxhluJfoytuzohytÃgtctœ yu.yth.me. «fthlkwxuLzhntuRftblesYhegt<bwscxujeVtulefòKfhesu<u ftb NY
fhJtfnuJtbtkytJNuylusuftbleòKfgtolt 24 fjtfbtk NY
fhJtbtklrnytJuylurlg<mbgbgtoœtbtkvwKofhJtbtklrnytJu<tusu<u ytRxblt SOR CtJ&e
dKevulÕxeJmwjjuJtbtkytJNu.
3. ºtK fu J^wJthWvhbwscleyLgftuLx[tfxhvtmu&eftbdehefhtJJtleVhsvzNuylu/y&Jt ºtK fu
J^wJthvulÕxefhJtleVhsvzNu<tu<u mkstudtubtkftuLx[tfxhluçjufjeMxfhJtbtkytJNusuleykr<b m•tt Bgw.frb¹lh©e luhnuNu .
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( North Zone)
1) nwk /ybuyt&eyufhthfhwkAwk/fheyuAeyu fu ytxuLzhhswfh<tkkvnujtkkbuk/ybu M&¤le bwjtft<je^e Au
yluftblujd<t btjmtbtl, bswheyluceSctc<tulujd<e M&trlfvrhrM&r<le ò<-btne<e bu¤Je Au.
2) nwk /ybuyt&eyufhthfhwkAwk/fheyuAeyu fu ytftuLx[tfxhtule Nh<turJd<tuyluxuLzhlujd<t
œM<tJustuft¤SvwJofyÇgtmfgtuo Au ylu<u bwsc<ultuybjfhJtmkkb<Awk/Aeyu.
ftuLx[tfxhlemneylurmfft
I.S.Sieve Percentage by I.S.Sieve Percentage by
TECHNICAL SPECIFICATIONS
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free objectionable
quantities of silt and traces of oil and injurious alkalis, salts, organic matter and other deleterious
material which will either weaken the mortar or concrete or cause efflorescence or attack the steel in
R.C.C Container for transport, storage and handling of water shall be clean. Water shall conform to the
standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled water. Comparison
shall be made by means of standard cement tests for soundness, time of setting and mortar strength as
specified in I.S.269-1976. Any indication of unsoundness, change in time of setting by 30 minutes or
more or decrease of more than 10 per cent in strength of mortar prepared with water sample when
compared with the results obtained with mortar prepared with distilled water shall be sufficient cause
for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be free
of elements which significantly affect the hydration reaction or otherwise interfere with the hardening
of concrete during curing or those which produce objectionable stains or other unsightly deposits on
concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per I.S.
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of the work.
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of
cement used in the Mix. The mixture of pigment shall be properly grounded to have a uniform colour
and shade. The pigments shall have such properties to provide for durability under exposure to
sunlight and weather.
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental to it.
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from
injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic
matter, loam, mica or another deleterious substance and shall be got approved from the Engineer-in-
charge. The sand shall not contain more than 8 percent of silt as determined by field test. If necessary
the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
The sieve analysis of coarse shall be as under:
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand:The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of proper
gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally
comply with the provisions of I.S. 383-1970. Unless special stone of particular quarries is mentioned,
grit shall be obtained from the best black trap or equivalent hard stone as approved by the Engineer-in-
charge. The grit shall have no deleterious reaction with cement.
8.2. The grit shall conform to the following gradation as per sieve analysis:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to used to built up
the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to VII) 1963, as
per instructions of the Engineer-in-charge. The necessity of test will be decided by the Engineer-in-
charge. The necessity of test will be decided by the Engineer-in-charge.
Sand: Sand Shall conform to specification M-6.
10.1. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and sand as may
be specified in the item. The slaked lime and sand be measured by volume.
10.2. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill shall be used
for preparation of lime mortar. The slaked lime shall be placed in the mill in an even layer and ground
for the 180 revolutions with a sufficient water. Water shall be added as required during grinding (care
being taken not to add more water) that will bring the mixed material to a consistency of stiff paste.
Thoroughly wetted sand shall then be added evenly and the mixture ground for another
10.3. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used up , covering
it by tarpaulin or open sheds.
10.4. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used on the day on
which it is prepared. But in no case mortar made earlier than 36 hours shall be permitted for use.
MATERIAL TESTING Frequency AND Acceptance Criteria AS BELOW
Sr Test Frequency of tests Code for Acceptance Samplling
No testing Criteria Point
a Initial Setting Time 50-100 T – 2 sample Not less than
Final Setting Time 100-200 T – 3 sample IS 4031 part 5 Not more than
IS:12269 600 minutes Site/Plant
200-300 T – 4 sample
300-500 T – 5 sample
500-800 T – 6 sample
810-1300 T – 2 sample
b Fineness by sieve One Sample (Each IS 4031 part 1 90% passed
sample as above) & 2 IS:12269 from 90 micron Site/Plant
c Consistancy One Sample (Each IS 4031 part 4 Above 30%
sample as above) IS:12269
Compressive One Sample (Each IS 4031 part 6 for OPC&PPC Site/Plant
d strength sample as above) IS:12269 on seven day
on twenty eight
a Silt Content by 2 Test / Season IS:383,IS:2386 Up to 3% Site/Plant
b Silt Content by 2 Test / Season As per CPWD Max 8% Site/Plant
c Fineness modulus 2 Test / Season IS:2386,Morth Specification as Site/Plant
d Seive Analysis 2 Test / Season IS:383,IS:2386 As IS-383 Site/Plant
e Water absorption 2 Test / Season IS:383,IS:2386 Less than 3% Site/Plant
f Moisture content 2 Test / Season IS:383,IS:2386 Site/Plant
g Specific gravity 2 Test / Season IS:383,IS:2386 Site/Plant
h Bulk density 2 Test / Season IS:383,IS:2386 Site/Plant
3 Coarse Aggregate
for Building work
a Sieve Analysis 2 Test / Season Is:2386,IS:383 As per relebant Site/Plant
b Impact value 2 Test / Season Is:2386,IS:383 45% Max by Site/Plant
c Flakiness Index Rendom Is:2386,IS:383 35% Max value Site/Plant
as per morth cl
d Elongation Index Rendom Is:2386,IS:383 35% Max value Site/Plant
as per morth cl
e Crushing value 2 Test / Season Is:2386,IS:383 45% Max by Site/Plant
f Moisture content 2 Test / Season Is:2386,IS:383 As per required Site/Plant
g Water absorption 2 Test / Season Is:2386,IS:383 Less than 3% Site/Plant
h Specific gravity 2 Test / Season Is:2386,IS:383 As per standard Site/Plant
a Efflorescene 1 Test / 50000 nos IS 1077/3495 Moderate Site
b Water absorption 1 Test / 50000 nos IS 1077/3495 Less than 20% Site
c Compressive 1 Test / 50000 nos IS 1077/3495 Min. Avg Site
strength 35kg/cm2 &
d Dimension 1 Test / 50000 nos IS 1077/3495 As per standard Site
5 Cement Concrete As Per IS 456-2000 IS 456 Grade Design -
Cubes Ordinary Cube
and Controlled Compressive
Concrete Strength at
Work M3 - no of M10 =
51m3 &above = M35 =
Add sample for each
m3 part there of
TMT bars 1 test / 40 MT IS 1786 Fe-500
bars of different
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( North Zone)
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
TECHNICALSPECIFICATIONSFORCIVILITEMS
Item No. 2 Wire Fancing
Providing and fixing 1.82 meter high fencing with 2.43 meter long M.S. angle posts
40mmx40mmx6mm and oil painting three coats,fixed at 2.50meter C/C with Seven horizontal
lines and two diagonals of galvanised steel barbed wire weighing 9.38Kg/100Rmt, strained
and fixed to posts with G.I. staples, including fixing the posts in ground with 0.30meter x
meter x 0.60meter block in C.C. 1:5:10 etc complete.
The rate shall be for a unit of one RUNNING metre.
Item No. 2 Excavation
Excavation for foundationupto 1.5M. depthincluding sorting out andstacking of
usefulmaterialsanddisposing of theexcavated stuff upto 50Meterlead. Rates are
incl.shoring&strutting.Allkindofsoil
Excavation for foundation for depthfrom 1.5 M. to 3.0 M. including sorting out
andstackingofuseful materials anddisposing of theexcavatedstuffup to 50M. lead.Rates are incl.
shoring &strutting.Allkindofsoil
Excavation for foundation for depthfrom 3.0 M. to 5.0 M. including sorting out
andstackingofuseful materials anddisposing of the excavated stuff upto 50 M. lead.Rates are incl.
shoring &strutting.Allkindofsoil
1 Excavationforfoundation/pits/raft/ trenchesetc.forfollowingdepth,bymechanicalormanual
includingsorting outand stacking of useful materials, dressingof thesides, rammingof bottom,
disposing of theexcavated stuff upto 50m. leadincluding lifts, for all kindof soil, allcompleteas
perdrawing, specifications, instruction & directions of the Engineer-in-charge.
Forallcivil,plumbing, electrical&infrastructureworks. Noextrapaymentwillbe
madeforshoring,struttinganddewatering.
b) from1.5to3.0mtrs
c) from3.0to5.0mtrsG
Anysoilwhichgenerallyyieldstotheapplicationofpickaxesandshovels,spades,rakesor any
suchordinaryexcavatingimplement or organic soil, gravel, silt, sand turf loam,
clay,peatetc. fallsunderthis category. For materials and workmanship for
earthworkandexcavation,relevantspecificationsofIS1200(PartI)andIS:3764shallbefollowe
Thedepthoftheexcavationshallbeaspertheitemdescription.
Clearing theSite:
Thesiteonwhichthe structure is to bebuiltshallbeclearedandall obstructions, loosestones,
materials andrubbish of allkind,bush, woodshall be removed, as directed. Thematerials so
obtainedshallbethepropertyofthe Government and shall be conveyedandstacked as directed,
within 50-m. lead. The roots of the trees comingin thesides
ofthetrenchesshallbecutandcoatedwithhotasphalt.
Alltypesoftrees,woodsetc.whichrequirespriorpermissionofGovt./ForestAuthority, before
cuttingshallbecutafterobtaining suchpermission from them. It shallbe
theContractor'sresponsibilitytoobtainsuchpermissionfromtherespectiveauthorities.
Therateofsiteclearanceisdeemedtobeincludedintherateofearthwork,forwhichnoextrawillbep
Aftercleaningthesite,thecenterlineswillbegivenbytheArchitectandEngineer-in-
The Contractorshall assume full responsibility for alignment, elevation and dimension of
eachand all parts of the work. Contractor shall supplylabours, materials, etc. required
forsettingout the reference marks andbenchmarksmade of MS angle ironand embedded in 1:2:4
CC.Theyshallmaintainthesameaslongasrequiredanddirected.
Theexcavationinthefoundationshallbecarried out eithermanually or
bymechanicalmeans,intruelineandlevel and shall have
thewidthanddepth,asshowninthedrawingsorasdirected. The Contractor shalldothe
necessary shoring and strutting or shall providenecessaryslopesto a safe angle or
steps, as required or directed, at his own cost. No extrapayment shall be made
forsuch precautionarymeasures, taken. The bottom
oftheexcavatedareashallbeleveledbothlongitudinallyandtransversely,asdirected,by
removingexcesssoilandwatering,asrequired.Noearthfillingwillbeallowedforbringingittolevel,if
bymistakeoranyotherreason,excavationismadedeeperorwiderthanshownon the drawings or
as directed. The extra depth or width shall bemade up with concrete
ofthesameproportion,asspecifiedforthefoundationconcrete,atthecostoftheContractor.
The Contractor shall at his own expense andwithout extracharge
makeprovisionofsupportingallutilityservices,lightingthetrenches,separatingandsta
ckingserviceablematerialsneatly,shoring,timbering,strutting,bailingoutwatereithersub
-soilorrainwater,includingpumpingatanystageofthework.
Trenchesshall bekept free of water while masonry or concrete works are in progress and
tillthe Architect and Engineer-in-charge considers it necessary, i.e. till the concrete is
sufficientlyset.
DisposaloftheExcavatedStuff:
Theexcavatedstuffoftheselectedtypeshallbeusedin fillingthe
trenchesandplinthorlevelingthegroundinlayers,includingrammingandwateringetc.complete.
TheContractorshallremovethebalanceoftheexcavatedquantityfromthesiteofwork, toa
place,asdirected, within a leadupto 50m. measuredfromtheouterface of
thebuilding/workunderconsiderationandforalllift.
Theleadistheshortestpracticalroute and not necessarilythe route
actuallytaken.Thedecisionof Engineer-Inchargeshallbefinalinthisregard.
6.0 ModeofMeasurementandPayment:
Themeasurement of excavation intrenches forfoundation shallbe
madeaccordingtothe sectionsoftrenches shown on the drawingor asper sections given by
theArchitectandEngineer-in-charge. Nopaymentshallbemade for surplus excavation made
inexcessof above requirements or due to stepping and slopingback asfound necessary,
onaccountofconditionsofsoilandrequirementsofsafety.
The rate shallincludefor clearing the site, surface dressing, makinglayout of the
building,fixingpermanentgridpointswithMSironposts, embedded in C.C. 1:2:4,
placedsufficientlyawayfromthebuildingandestablishingbenchmarks etc.
Theratesshallincludefornecessaryshoring,timberingandstruttingforprotectionofsidesof the
excavated trenchesandpits, pumping out rainor surface wateratanystage
ofconstructionsoastokeepthetrenches/pitsdry,tothesatisfactionoftheArchitect/Engineer- in-
The rate shall includelevelingand ramming the bottoms of excavations to
receiveconcrete,etc.includingtrimmingtoslopewherevernecessaryetc.complete.
Therateshallbeforaunitofonem3.
ReinforcedCementConcrete
WatershallconformtoM-1CementshallconformtoM-3,SandshallconformtoM-6,Gritshall conformtoM-
8,Gradedstoneaggregate20mm.nominalsizeshallconformtoM-12.
Theconcretemixisnot required tobedesignedbypreliminarytests.Theproportion of
theconcretemixshallbe1:2:4(1cement:2coarsesand:gradedstoneaggregate20.Mm.Nominalsize)byv
olume.Concreteworkshallhaveexposedsurfaceorasspecifiedintheitem.
Thedesignation ordinaryM-100,M.150,M-200,M-250specifiedasperI.S.
Correspondapproximateto
1:3:6,1:2:4,1:1/2:3and1:1:2nominalmixof ordinaryconcretebyvolumerespectively.
Theingredientsrequiredforordinaryconcretecontainingonebegofcementof50kg.Byweight(0.-
342Cu.M.)fordifferentproportionsomixshallbeasmaintained:
Thewatercement ratios shallnotbe morethan specifiedin theabove table. The cementcontentof
the mixspecifiedin the table of water in mixhas tobe increased to overcome
thedifficultiesofplacements and compaction so thatthe eater-cement-ratio specifiedin the table
is notexceeded.
Workabilityof the concrete shallbe controlledbe maintaininga water-cement-ratio that
isfoundto give a concrete mix which is just sufficient wet to be placedand comp laced
withoutdifficultywiththemeansavailable.
The maximumsize ofcourse aggregateshall beas possiblewithin the limits specified but
innocasegreaterthanonefourthminimumthicknessofthemember,providedthattheconcretecanbeplace
dwithoutdifficulty soastosurround all reinforcement thoroughly and to fill thecornersoftheform.
Forreinforcedconcretework,coarseaggregatehavinganominal size of 20 mm.
aregenerallyconsideredsatisfactory.
For heavilyreinforcedconcretemembersin the caseof ribs of
mainbeems,thenominalMaximumsize of coarse aggregate should usuallybe restricted to
5mm.lessthan theminimumcleardistance
betweenthemainbarsor5mm.lessthantheminimumcovertothereinforcementwhicheverissmaller.
Where thereinforcementiswidelyspacedasinsolid slabs, limitationsof Engineer-in-
chargebasedupontheareotherminimumcover.
Proportioning : proportioning shall bedone byvolume, exceptcement whichshall
bemeasuredinterms of bagsof 50kgweight, the volumeofonesuchbeing takenas 0.0342 cu.Meter.
cmsand40cms.deepwhilemeasuringofaggregate.Thesizeofboxes(internal)shallbeshaking
ramming orhammering. The proportioning of sand shall beon
thebasisofitsdryvolumeandincaseofdampsand,allowancesforbulkageshallbemade.
Forallwork,concreteshallbemixedinamechanicalmixerwhichalongwith other
accessories.Shallbekeptinfirstclassworkingconditionandsomaintainedthroughouttheconstruction.
Measuredquantity ofaggregate, sand and cement and so maintainedthroughoutthe
construction. Drum of the mixer while it is continuously running mixshall
beaddedgraduallyandmixingcontinuedforanotheroneahalfminute.Mixingshallbecontinuedtill
materialsareuniformlydistributedanduniformcolourfitheentiremassisobtainedandeachindividual
particle of the coarse aggregate shows complete of mother containingitsproportionate amount
of cement. In no caseshallthe mixing be donefor than 2 minutes
allingredientshavebeenputintothemixer.
When handmixing is permitted by the Engineer-in-charge for small or for certain
otherreasons,itshall bedone on the smooth water tiger platform large enough to allow
efficientturning overthe ingredients of concrete beforeand after adding eater. Mixing
besoarrangedthatonforeigngetsmixedwithneitherconcretenordoesthemixingwaterflowout.Cementin
required number of bags shall be placed in auniform layeron themeasuredquantity of fine
andcoarse aggregate, which shallalso bespread ina layerof uniformthicknesson themixing
platform. Dry coarse andfine aggregate and cement shallthan
bemixedthoroughlybyturningovertogata miniatureto uniformcolour. Specified
quantityofwatershallthanbeadded gradually through arose canandthemassturnedovertilla
mixofrequiredconsistencyisobtained.Inhandmixingquantityofcementshallbeincreasedby
10percentabove thatspecified.
Mixers whichhavebeenout of use formore 30 minutes shall be thoroughly cleaned
beforeputtinginanowbatch.UnlessotherwiseagreedtobyEngineer-in-charge the firstbatch
ofconcrete form the mixture shallcontain onlytwo thirdsif normalquantity
coarseaggregate.Mixing plant shall
bethoroughlycleanedbeforechangingformonetypeofcementtoanother
Thedegree ofconsistency whichshall uponthe natureof the work and methods
ofvibrationofconcreteshallbedeterminedbyregularslumptestsinaccordancewithI.S.1199-
1959.The slumpof 10 mm.to 25mm.shallbe adopted when vibrators are used and80
mm.whenvibratorsarenotused.
ContractorshallgivetheEngineer-in-chargeduenoticebeforeplacinganyconcreteintheformsto
premithimtoinspectandacceptthefalse workand formsto
theirstrength,alignment,andgeneralfitnessbutsuchinspectionshallnot relieve
thecontractoroftheresponsibilityforthesafetyofmen machinery, concreteshall materialsand
forresultsobtained.Immediatelybeforeconcretingallformsshallhavethoroughlycleaned.
Centeringdesignanditserectionshallbegotapprovedfromtheengineer-in-charge.
Onecarpenterwithhelpershallinvariblybekeptpresentthroughtheperiodofconcreting.
Movement of labour and
otherpersonsshallbetotallyprohibitedforreinforcementlaidinposition. For
accesstodifferentspartssuitablemobileplatformsshallbe providedso
thatsteelreinforcementinpositionisnotdisturbed.Forensuringpropercover,mortarblocksofsuitab
le size shall be cast and tied to the reinforcement. Timer, kapachi or metal
piecesshallnotbeusedforthispurpose.
Transportingandlaying:
Themethod of transporting andplacingconcertshallbeasapproved. Concrete
shallbesotransportedandplacedthatnocontamination, segregation orloss of its constituent
materialtakesplace.
Placingofconcrete:
NoconcreteshallbeplacedinanypartofthestructureuntiltheapprovaloftheEngineer-incharge
hasbeenobtained.
Concreting shallproceed continuouslyover thearea betweenconstruction joints. Freshconcrete
contraction joint is formed. Concrete shallbe compactedin itsfinal position within30minutes
ofitsdischargefromthemixer. Except whereotherwiseagreedtobythe Engineer-in-
charge,concreteshallbedepositedinhorizontal layersto acompacted depthof notmorethan
0.5meter when internal vibrators areused andnot exceeding0.30 meterin allothercases.
UselessotherwiseagreedtobytheEngineer-in-
charge,concreteshallnotbedroppedintoplacefromwayastoavoidsegregation.
Whenconcretinghastoberesumedonasurfacewhichhashardened,itshallberoughened,sweptclean,thoro
ughlywettedandcoveredwitha13mm.
Thicklayer of mortar shallbe freshly mixedandplaced immediately before placing
ofnewconcrete.Whereconcretehasnotfullyhardened,alllatenciesshallberemovedbyscrubbingthewet
surface with wire or bristlebrushes, care bringtaken to avoid dislogement ofany
particlesofcoarseaggregate. Thesurfaceshall then be thoroughly wetted, allfree waterremoved
andthen coated with neat cement grout. The firstlayer of concrete to be placed on
thissurfaceshallnot exceed150mm.in thickness andshallbewellrammed against old work,
particularattentionbeinggiventocornersandclosespots.
Allconcreteshallbecompactedtoproduceadensehomogenousmasswiththeassistanceofvibrators,
unless otherwisepermittedbytheEngineer-in-charge forexceptionalcases,suchasconcretingunder
water, where vibrators cannot be used. Sufficient vibrators in serviceableconditionshallbekept at
site sothatspareequipment is always availablein the event ofbreakdowns. Concrete shall be
judged to be compacted when the motarfills thespacesbetween the coarse aggregate and
beginsto creamup toform an even surface. Compactionshallbe completedbefore theinitial
setting stars i.e. within 30minutes ofaddition ofwatertodry mixture. During compaction, it
shall be observed that needle vibrators arenot
appliedonreinforcementwhichislikelytodestroythebondbetweenconcreteandreinforcement.
Immediately after compaction,concreteshallbeprotectedfromweather, includingrain, runningwater,
shocks, vibration, traffic, rapid temperaturechanges, frost and drying out process.
Itshallbecoveredwithwet sackinghassian orother similarabsorbent materialapproved,
soonaftertheinitial set, andshall bekept continuously wet for a period of not less than14
daysfromthedateof placement. Masonry workover foundationconcrete maybe started after
hours ofitslayingbutcuringofconcreteshallbecontinuedforaminimumperiodof14days.
Samplingandtestingofconcrete
Samplesfrom fresh concrete shall be taken as per I.S. 1199-1959 and cubesshall
bemade,curedandtestedat7daysof28daysasperrequirementsinaccordancewithI.S.516-
1959.Arandomsamplingtestedi.e.thesamplingshouldbespreadovertheentireperiodofconcretingthec
overallmixingunits.
Theminimumfrequencyofsamplingofconcreteofeachgradeshallbeinaccordancewithfollowing:
Quantityofconcreteint Quantity of No.
hework No. concreteintheworks. of
ofSample samples.
1-5cmt. 1 16-30cmt.
6-15cmt. 2 31-50cmt.
51andabove 4□oneadditionalforeachadditional50m.orpart
NOTE: Atleastone sampleshall be taken from each shift. Ten test specimens shall
bemadefromeachoneachdayoftheconcretingasperabovefrequency.Thenumberofspecimensmaybes
uitablyincreased asseemed necessaryby the engineer-in charge when procedure
oftestsgivenaboverevealsapoorqualityofconcreteandinotherspecialcases.
The averagestrength ofthe group of cubes cast foreach dayshall notbe lessthan
thespecifiedcubestrengthof150kg/Cm2at28days.20%ofthecubescastforeachdaymayhavevalurlesst
hanthe specified strengthprovidedthelowestvaluris notless 85% ofthespecified strength. If the
concrete made in accordancewith theproportions givenfor aparticulargradedoesnotyield the
specified strength, such concreteshall be classified asbelongingtothe appropriatelower grade.
Concrete made in accordance with the
proportionsgivenforaparticulargradeshallnot,however,beplacedinahighergradeonthegroundthatthet
eststrengtharehigherthentheminimumspecified.
TheEngineer-in-charge shallbe informedin advancedby the contractor of his intentiontostrike
the formwork. Whilefixing thetime for removal of form work, due
considerationshallbegivento local
conditions,characterofthestructure,theweatherandotherconditionsthatinfluence thesettingof
concrete andof the materials usedinthemix.Innormalcircumstances(generally
wheretemperaturesareabove 20.C.) and where ordinaryconcrete is used,
formsmaybestunkafterexpiryofperiodsspecifiedinitemNo.9.1.(A)Forrespectiveitemofformwork.
Allformworkshallberemovedwithoutcausinganyshockorvibrationaswoulddamagetheconcrete.
Beforethesoftandstrutsareremoved,theconcretesurface shall be
graduallyexposed,wherenecessaryinordertoascertainthatconcretehassufficientlyhardened.
Centeringshall begradually and uniformly lowered insuch a manner as to permit the concreteto
take stresses dueto its
ownweightuniformlyandgradually.Whereinternalmetaltiesarepermitted,theyortheirremovablepartss
hallbeextractedwithoutcausinganydamagetotheconcreteandremaining, holes filled with mortar.
No permanently embedded metal part
shallhavelessthan25mm.Covertothefinishedconcretesurface.Whereitisintendedtore-use
theformwork,itshallbecleanedandmadegoodtothesatisfactionEngineer-incharge.Afterremovalof
formwork andshuttering, the Executive Engineer shallinspect the work
andsatisfybyrandomchecksthatconcreteproducedisofgoodquality.
Immediatelyaftertheremovalofforms,allexposed boltsetc, passingthrough
thecementconcretememberandusedforshutteringoranyother purpose shallbe cutinside the
cementconcretemembertoadepthofatleast25m.belowthesurfaceoftheconcrete
andtheresultingholesare filed by cementmortar. All finscausedbyformjoints, allcavities produced
by theremoval of form ties and all other holes and depressions, honeycomb spots,
broken edgesor corners and other defects, shall be thoroughly cleaned, saturated with
water andcarefullypointedandrendered true with mortar of cement and fine aggregate mixed
inproportionsusedin the grade of concrete that is beingfinishedandofasdryconsistencyasispossible
to use.Considerable pressure shallbeappliedinfillingandpointingtoensurethroughfilling in all
voids. Surfaces which are pointed shall bekept moist for a period of 24 hours.
Ifrockpockets/honey combsintheopinion of theEngineer-in-charge areofsuchan
extentorcharacterastoaffect the strength of the structure materially orto endangerthe lifeof
thesteelreinforcement, hemaydeclaretheconcretedefective.
Mode ofmeasurements&payment
Theconsolidatedcubicalcontents of concrete work asspecifiedinitemshallbemeasured.
Theconcretelaidinexcessofsectionsshownondrawingorasdirectedshallnotbemeasured.Nodeductionsh
(a) Endsof dis-simmilarmaterialssuchasjoints, beams,posts,girdes,rafters,
purlinetrusses,corbelsandstepsetc.upto500Sq.M.cminsection.
(b) Openingupto0.1Sq.M.
Therateincludes cost
ofallmaterialslabour,toolsandplantrequiredformixing,placinginpositionvibrationandcompacting,fi
nishing,asdirected,curingandallotherincidental
expensesforproducingconcreteofspecifiedstrength.Therateexcludesthecostofformwork.Therateshall
beforaunitofonecubicmeter.
FORCONCRETEWORKS:M-200ANDM-250GRADECONCRETE
Providingandlayinginpositionmachinebatchedandmachinemixedcontrolledcementconcre
te M- 200andcuringetc.complete,excludingthecostofform
workandreinforcementforreinforcedconcreteworkin
Except where they are variedby therequirements ofthisspecificationdue
provisionofIndianStandardSpecificationIS-456-
1964forplainandreinforcedconcreteandanyotherrelevant ISSapplicabletogetherwith the latest
amendments shall be held to
beincorporatedinthisspecification.Itsh
allbeintentofthespecificationstoensurethatallconcreteplacedatvariouslocationofthejobshouldbedur
able, strongenough tocarry thedesignloads,itshouldmixedwell andpractically be impervious
to water. It should befreefromsuchdefectsasshrinkage,crackingandhoneycombing.
ProportioningoftheMix
In ordinary concrete, excluding controlledconcrete, proportions of cement to
fineandcoarseaggregate shallbe asspecified inthe respective items and shallbe
accuratelymeasured asinTable 'A' below. These proportions arebased onassumption
thatthe aggregatesaredry.
IfaggregatesaremoistallowanceshallbemadeforbulkinginaccordancewithIS:2386.Allowanceshalla
lsobemadeforsurfacewaterpresentinaggregatewhen computing watercontent.
Surfacewaterpresentshallbedetermined by one of the field
fieldmethodsdescribedinIS:2386(PartIII).Intheabsenceofexactdata,theamountofsurfacewatermay
beestimatedfromthevaluesgiveninTable'B'below.
(a) Concreteof1:2:4orrichermixshallbemixedinanapprovedmechanicalmixer.Themixer and
mixing platform shall be suitably protected from windand rain. Aggregates
shallbeaccuratelymeasured outin boxesand mixed dry along with cement, water shall
thenbeaddedinmeasuredquantityandmixing shallbe continueduntil thereis auniform in
colourandconsistencybutinnocaseshallthemixingbedoneforlessthan2minutes.
(b) When hand mixingispermittedwiththeapprovaloftheEngineer-in-chargeit
shallbecarriedoutonawatertightmixingplatformandcareshallbetakentoensurethatmixingiscontinue
duntilthemassisuniformincolourandconsistency.
Quantity of water for making reinforced concrete shall be sufficient so as
toensure that concreteshall surround and properly grip all the
reinforcement.The bestconsistencyshallbethat,whichwillflowsluggishlywithout
flattening outandwithoutseparationofcoarseaggregatesfromthe
mortar.Thedegreeofplasticityshalldependonthenatureofworkandatmospheric
temperatureandwhether the concrete is vibratedorhandcompacted.
Theslumpsshownintable'C'obtainedbythestandardslumptestcarriedoutinaccordancewith
theprocedurelaiddowninIS: 119-1959 shallbeadoptedfordifferenttypesofwork.
Theuseofadmixturesmay be allowed only ifapproved by the
structuralconsultantandhisdecisioninthisregardshallbefinal.
Concrete shallbe conveyedfrom theplace ofmixing to the place of final deposit as rapidlyas
practicable by methods whichwill prevent segregation or lossofanyof the
ingredients.Ifsegregation does occur during transport, the concrete shall be remixed before
being place.In no case, more than 30 minutesshall elapse between mixing and consolidation
Placing&Compacting
(a) Concreteshallbeplacedin layersof suitablethickness orin stripsand
compactedbeforeinitialsettingcommencesandshouldnotbesubsequentlydisturbed.Methodofplacing
shall besuchastopreclude segregationand asfar as practicable the placingshall becontinuous.
Special care shallbe takenin accordancewith IS : 456 whilelaying
concreteunderextremeweather.
(b) Concreteshallbethoroughlycompactedduringtheoperationof
placingandthoroughlyworked aroundthe reinforcement, embeddedfixtures and spaded
againstcorners of the form work and bypunning, rodding, mechanically vibrating orby
anyotherapproved means. In additionform workshall betapped lightlyby
usingwoodenmalletatthepouringhead. Thenumberand typeof vibratorto be used shall
besubjectto theapproval of Engineer-in- charge and in general immersion type vibrators
shallbeused.Externalvibratorsshallalsobeusedwheneverdirected.
(c) Theintensityandduration of vibration shall be sufficient to causecompletesettlement
and compactionwithoutanystratificationofsuccessivelayersorseparationofingredientsor
formationof laitance. Vibrator shallbe inserted vertically in the concrete
atpointsnotmorethan45cm.Apartandwithdrawnveryslowlywhenairbubblesnolongercomeon
the surface. Over vibration or vibrationof verywet mixesis harmfuland
shouldbeavoided.Careshallbetakentoutilizethevibratoronlytocompacttheconcreteandnotto
spread it. Sufficient number of reservevibrators in good working condition shall be
keptonhandatalltimes,soasto ensurethat thereis no slackening or interruption incompacting.
(d) Dimensionofcolumn,beams,slab,footingshallexactlyasperdrawing,however,inspecialcircu
mstancestoleranceindimensionshallbeallowableasunder:
(1) Variationfromlevelorspecifiedgradesforslab
(2) Variationincrosssectionaldiameterofcolumns/beams/slabs.wallsinsimilar.Minus6m
(3) Variationinsizesandlocationfromthosespecifiedforslabandwallopening12mm.(4)
(i)VariationofDimensioninPlanminus12mmplus50mm.(ii)Misplacement:2%butnotmorethan50m
(iii)Reductioninthickness:5%ofspecifiedthickness.
Constructionjoints
(a) Concreting shall be carried out end to end continuously as far as possible andwhen
constructionjoints aretotally unavoidable, it shall be located in a predeterminedposition
approvedby the Engineer in charge. The jointsshall bekept at places where theshear forceis
theminimum andthese shallbe straight and at right angles to thedirectionof main
reinforcement. When thework hasto beresumed, ona surface which
hashardened,suchsurfaceshallbe roughened. It shall be swept clean, thoroughlywetted
andcoveredwitha13mm.Thicklayerofmortarcomposedofcementand sand
inthesameratioasthecementandsand intheconcretemix. This13mm.Layerofmortar
shallbefreshlymixedandplacedimmediatelybeforetheplacingofconcrete.
(b) Where theconcrete hasnot fullyhardened, alllaitance shallbe removedbyscrubbing the
wet surface withwire orbristle brushes, care being taken toavoiddislodgment of particles of
aggregate. The surfaceshall thenbe coatedwith neatcementgrout.Inhorizontaljoints the first
layer of concrete to be placed on this surface shall notexceed15cm.Thicknessand shall be well
rammed against old work, particular attention beingpaidtocorners.
Expansionjointshallbeprovidedwhererequiredasshownon
thedrawingsorasdirectedbytheEngineerincharge/Consultant.Thejointsshallbefilledwithapprov
edqualityfiller.
Concrete shall be carefully protected during first stage of hardening from harmful
effectsofexcessiveheat, dryingwinds,rainorrunningwater.Itshallbe coveredwith alayer
ofsacking,sand,canvas,hesian,or similar absorbentmaterials andkept constantlywet
fortendaysfromthedateof placing of concrete. Alternatively, the concrete being
thoroughlywettedandcoveredbylayerofapprovedwaterproofmaterialwhichshouldbekeptincontactw
ithitforsevendays.
a) The formwork shall conform to theshape, lines and dimensions as shownon
theplansand beso constructed as to remain sufficiently rigid during the placing
andcompactingoftheconcreteandshallbesufficientlywatertightto prevent loss of cementslurry from
the concrete. Form workor centering shall be constructedof steelor
timberandadequatelydesignedtosupportthefullweightofwetconcretewithoutdeflectionand
retainitsfromduringlaying,rammingandsettingofconcrete.Timber used shall
beproperlyseasonedsoastopreventdeformationwhenwetted.
b) All propsshallbe straightand offull heightand nojoints shallbe allowed.Propsshallbe braced
with thin bamboos or wooden battens andwhere additional staging
isnecessary,extracareshallbetakentousebiggerdiameterpropswithbracingat4or5levels.Allprops
shallbe supportedon soleplates and double wedges. At thetime
ofremovingpropsthesewedgesshallbegentlyeasedandnotknockedout.
c) Allrubbish,chipping,shavingsandsawdustshall be removed fromtheinteriorof the forms
before theconcreteisplacedand the form work in contactwith
theconcreteshallbemineraloiloranyotherapprovedmaterial.Careshallbe taken that oil or
suchapprovedmaterialiskeptputofcontactwiththereinforcement.
d) All formwork shallberemovedwithout shockor vibrationand shallbe easedoffcarefully in
ordertoallow thestructure to take up itsload gradually. Forms shallnot bedisturbeduntilconcrete
has adequatelyhardened to take up super-imposed load comingonitaninno circumstancesshall
formsbe struckuntil the concrete reached astrength
ofatleasttwicethestresstowhichtheconcretemaybesubjectedatthetimeofstriking.
e) In the normal circumstances (generally where temperatures are above 21degrees
centigrade) andwhere ordinary cement is used,formsmaybestruck after expiry
offollowingperiods:-
(a) Walls,columnsandverticalsidesofbeam :48HoursasmaybedirectedbytheEngineerin
(b) BottomofSlabUpto4.50Mtspan:7Days.
(c) BottomofSlababove4.50Mt.Span:14Days.
(d) BottomofBeamsandarchribover6.00MeterSpan:21Days.
However this period may be increased or decreased at the discretion of Engineer-in-
charge.Specialcareshallbetakenwhilestrikingthecenteringofcantileveredslabcanopies,portalframes
,foldedplateconstruction and period of striking centering shall be asdeterminatebytheEngineer-
Ifdirected,formsshall begiven anupwardcambertoensurethatthebeamsdonothave any
Surfacethatbecomesexposedonremovalofformsshall be
carefullyexaminedanyfins,burrs,projections etc.That aredetected shallbe removed. Any
honeycombing of minornatureshallbefinishedneatlywithcementmortar1:2.
Anyworkshowingsignsofdamagethroughprematureorcarelessremovalofcenteringorshutteringorshutte
ring,shallbereconstructedbytheContractorathisowncost.
Concrete mixedintheproportiondesiredshallhavecompressivestrength afterlacing,
notlessthanthefollowing:-
Sr. ConcreteMix MinimumComp MinimumCompressi
Strength 7 Strength28days
sq.cm(2250lbs sq.cm(3500lbs./sq
20) sq.cm(1875lbs 0lbs./sqcm
sq.cm(1500lbs sq.cm(2100lbs./sq
(b) TestsonconcreteshallbecarriedoutinaccordancewithIS-
456andanyotherISapplicable.
The frequency of works test shall be at such intervals as ordered by the Engineer-in-
charge and subject to that every 150cu.m of concrete placedor partthereof andfor
aday'sconcreteexceeding 20cu.ma batchof6 cubesshall bemade for every sample and 3ofthem
testedafter 7 daysandtheremaining 3cubesshallbeshallbe testedafter 28 days.
Thecriteriaforacceptance ofconcrete asconforming to the specified proportion/grade
ofconcrete shall be in accordance with IS:456 and the contractor shall entirely re-do
therejected work at hisowncost. Strength or 28daysshallalonebeconsideredfor acceptance.
TheContractor shallarrange tocarry outthe tests in accordance withthe
relevantIndianstandards specifications in any approved Laboratory and the testreports in
OriginalsubmittedtoEngineer-in-charge.TheentirecostoftestingshallbebornebytheContractor.
DetailsofaggregatesandwaterrequiredindifferentconcreteMixes,surfacewaterinsand,and
slumprequiredisgiveninTableA,TableBandTableCasunder:
S. NominalMix Qty. Qty.
N ofag ofwaterrequiredper
o. gregates 50Kgs.ofcement
FINE Coarse Vibrat Unvibr
cu.m cum (fordryaggregate0
S. Aggregates ApproximateQty
1 VeryWetsand 120lits.
2 ModeralyWetsand 80Lits.
3 Moistsand 40Lits.
4 MoistGravelsorcrushedsock 20-40Lits.
Coarsertheaggregate,lesserthewateritwillcarry.
S. Typeofwork SlumpRequired
Forconcretew Forunvibrate
1 MassconcreteonRCC 2.5Cms.(1”) 5Cms.(2”)
foundation,footings
2 Beams,Slabs,columnswithsi 2.5 5Cms–10
mplereinforcement to5Cms.(1”- Cms
3 ThinSections with 5Cms–10 10-15Cms.(
congested Cms 4” –6”)
Reinforcement (2”–4”)
Note:Should conditions governing slumps and workability
changedpointingtoadvisabilityofanincreasedslump,this
shallonlybedonebydecreasingtheamountofaggregateandnotonlybyincreasingthe
SpecificationsforControlledConcrete:
The following specificationsshallformpartofthecontractandtheseshallbe deemed tobe
supplemental to the specifications in the printed tender and not
inderogationthereofexcepttotheextentspecificallyprovidedherein.
AllconcreteshallcomplywiththerequirementsofIS:456.Whereverareferenceismadetoany
IndianStandard Codeof practiceit shall mean the latest versionof therelevantstandardinuse.
Concretework shall be supervised by a competent concrete
technologistapprovedbytheEngineer-In-
chargestructuralconsultantwhosedutywillbetosuperviseall
stages of designing the mix, preparation and placing of concrete. All cubes shallbe
madeandsitetestscarriedoutunderhisdirect.
SupervisioninthepresenceofEngineer-In-Charge/StructuralConsultantorhisauthorised
representatives.Inordertoexercisethe required degree of constant control over
theconcretematerialsand their preparations, the Contractor shall set up and maintain at
hisownexpense a testing laboratory at site.Heshallprovideallapparatusrequired for
sensitivetestingofconcreteandconcretematerialsandinparticularhemusthavethefollowingequip
ment intheSite Laboratory, if the adequatetestinglaboratoriesarenot available in
thenearbyareaofworksite.
Beforethecommencementofconstructionwork,theContractorshallsupplytotheEngineer
-In-Charge/StructuralConsultantarrangementforconcretingplant.
Allmaterialswhichhavebeendamaged,contaminatedorhavedeterioratedordonotcomplyina
nywaywiththerequirementsofthisspecifications berejected andshall
beremovedfromthesiteattheContractor'sownexpense
Materialsviz.,cement,fine aggregate, coarseaggregates, water etc. Shall
betested,ifdirected,inanapprovedtestinglaboratoryandtestreportsinoriginal,shallbeforwarde
dtoEngineer-in-chargeandallcoststestsshallbebornebytheContractor.
Ifdirected,testsshallberepeatedandcostsofsuchtestsshallbebornebytheContractor.
Theconcretemixshallbedesigned by any of therecognised methods.
Theproportionschosenshouldbesuchthattheconcreteisof adequateworkability for
theconditionsprevailingontheworkinquestionandcanbeproperlycompacted.
The maximum total quantity of aggregate by weight shall notexceed what is
shownin thetable given below in paragraph3.3 exceptwhere otherwisespecifically
permittedbytheEngineer-in-charge/Consultant.
Exceptwhereitcan be shown to thesatisfaction of the Engineer-in-
charge/Consultantthatsupplyofproperlygradedaggregateofuniformqualitycanbe maintained
over the periodof work, the grading of aggregateshould becontrolled byobtaining the coarse
aggregate in different sizes and blending themin
therightproportionsfor various mix designs, the different sizes being stocked inseparate
stockpiles. The materials should be stock piled preferably a daybefore use. The
gradingofcoarse, andfineaggregateshould be checked as frequently aspossible, thefrequency for
agivenjobbeingdeterminedbytheEngineer-in-charge/Consultanttoensurethatthe
suppliesaremaintainingtheuniformgrading withthat of the samples used in thepreliminarytests
Inproportioningconcrete,thequantityofbothcement and aggregate
shouldbedeterminedbyweight.Watershouldbeeithermeasuredbyvolumeincalibratedtanksorweigh
ed. All measuringequipmentshallbe maintainedin aclean serviceablecondition
andtheiraccuracyperiodicallychecked
Cement shall comply in every respect with the requirements of the IS.269 for Portland
cementandshallbeobtainedfromapprovedsources.
Cement shallbe storedin suitable weather-proof structureson raised wooden platform andin
stacks which are not higher than 10 bags. Sufficient space shall be provided for circulationand
rotation of bags inorder to minimize the length of storage of any of the bags.
Provisionsforstorageshallbeample andthe consignmentof cementas received shall be
separatelystored in sucha manner as to provide easyaccessfor the identification andinspection of
eachconsignment.Costofprovidingthesestructuresshallbebornebythecontractor.
Storedcementshallmeetthetestrequirementsatanytimeafterstoragewhenaretest
isorderedbytheEngineer-in-
charge/Consultant,Cementconcerningwhichthereisdoubtshallnotbeusedpendingtestingandsati
sfactoryresults.Allcementnotconformingtospecificationsand rejectedbytheEngineer-In-
Charge/Consultantshallberemovedimmediatelyfromthesiteof work.
Cementshallbeusedinthesequenceinwhichitarrivesinorderthatno cement
shallbeunnecessarilystoredforalongperiod.Ifcementbecomeshumpyduetopartialhydrationitshallbe
removedfromthesiteimmediately.
Admixturesshallbeallowedtoimproveworkabilityonlyifthereisprovedevidencethatneitherthe
strengthnor the other requisite qualitiesof concrete and/or steel, accessories,groutareimpaired
by their use. The use of admixtures containingCalcium Chloride,Fluorides,Nitrates and
Sulphates is prohibited. The Engineer-In-Charge decision on
allmattersrelatingtotheuseofadmixturesshallbefinal
Admixturesshallbestoredinasuitableweatherproofshed/building.Anymaterialwhich has
deteriorated or which hasbeen contaminated or damaged whether during transistor
atsiteshallbeimmediatelyremovedfromthesiteandreplacedatContractor'sownexpense.
FineAggregates:
ShallconformwiththerequirementsofIs:383andrelevant portion of IS: 515.It shall bechemically
inert, strong, hard, durable of Limited porosity, freefromadherent coatings, claylumps, coal and
coal residues, and shall not contain any organic matter of other admixturesthat may cause
corrosion of reinforcement or impair the strength or durability of the concrete.Themaximum
quantity of the deleterious materials shallnotexceedthelimits specified in
therelevantIndianStandardsSpecification.
The natural sand shall havegrading conformingto oneof thefour grading limits given
inthefollowingtable:-
GradingLimitforfineaggregates
Percentagepassing
sieveDesignat GradingZo Gradin Grading GradingZ
ion. ne1 g Zone31 one4
(whengradingfallsoutsidethelimitsofanyparticulargradingzoneofSieves,
other than 600Micron Sieve, by a total amount not exceeding 5%, it shallbe regarded
other than 600Micron Sieve, by a total amount not exceeding 5%, it shallbe regarded
asfallingwithinthegradingzone.)
CoarseAggregates
Coarse Aggregates shallconformwiththerequirementsofIS:383 and relevantportions
ofIS:515.Itshallconsistofhard,dense, durable, uncoated crushed rock. Use of
gravelAggregatesshallbefree from soft, friable, thin of
flakypieces.Itshallbefreefrominjuriousamountsofalkali or organic matter otherthan deleterious
materials. The maximumquantityof deleterious
materialsshallnotexceedthelimitsspecifiedintherelevantIndianStandardSpecifications.
Coarseaggregatesshallbeobtainedinsinglesizesconformingtothegradinggiveninthefollowingta
ble inrespect of eachnominalsize.Singlesizedaggregatesshallbe blended insuitable
proportions to obtain a desiredgrading of coarseaggregates.Atthediscretion of theEngineer-
In-Charge/Consultantuseofgradedaggregatesshallbeallowedprovidedthe
gradingconformstothelimitsspecifiedinthefollowingtableunderColumnB.
Sieve APercentagePassing,forsin BPercentagepassing
Designa glesized ,ofgraded
tion Aggregateofnominalsize Aggregateof
(a) For heavilyreinforcedconcretemembersasin the caseof ribs of mainbeams,henominal
maximum sizeof the aggregate shallusuallyberestricted to
mm.Lessthantheminimumcleardistance between the main bars or 5 mm less
thantheminimumcovertothereinforcementwhicheverissmaller.
(b) Where reinforcementid widelyspaced asin solid slabs, nominal maximum
sizeoftheaggregateshallbe20mm.
Forreinforcedconcretework,aggregateshavingamaximumsizeof20mm.Shallbeu
Inselectingcoarseaswellasfineaggregates,theContractorshallsatisfyhimselfthatthesourcesuitable
andadequateforregularsupplyandawatchshallbemaintainedthattheparticleshapeandgradingremai
nreasonably uniform throughouttheprogressof work. IfdirectionbyEngineer-in-charge/
Consultant,theaggregatesshallbewashed at Contractor'sexpense.
For bothfineandcoarseaggregates,
preliinarytestsshallbecarriedoutforphysicalcharacteristics,limits of deleterious
substances,soundness, etc. Prior to commencement
ofworkandalsowhenthesourceofsupplyischanged.
Water usedfor both mixingandcuringshallbefree from injurious amountsofdeleteriousmaterials.
Potablecontractor. Water containing any sugar or an excess of acid, alkali or
salt,shallnotbepermittedforuse.Waterwhichfailstosatisfythe
followingrequirementsshallnot beused.
(a) Toneutralise200ml.Sampleitshould notrequiremore than2 ml. Of
Toneutralize200ml.Sampleitshouldnotrequiremorethan10ml.Of1.0normalHCL
.(c) Percentageofsolidsshouldnotexceedthefollowing:
Organic Percent
Alkalieschloride
In case of doubt, the Engineer-In-Charge may requirethat concretemixed withwater
proposedtobeusedshould not have a compressive strength, lower than 9% of the strength of
concretemixedwithdistilledwater.
2.15.5 Reinforcement
All reinforcement shall conform with the requirements of relevant IS specifications for
mildsteel, deformed steel etc. All reinforcement when placedin positionshall beclean
andfreefromloosemild scales, dust, loose rustand coats of paints, oil or other coating while
maydestroyorreducebond.
Weldedjointsmaybeallowedonlywhentestsshall bemade to prove that the joints are of thefull
strength of the bars connected. Weldingof reinforcement shallbe donein
accordancewiththerecommendationsof relevantIndian Standards for welding of mild steel
bars usedinreinforcedcementconcrete.
2.15.7 ConcreteMixdesign
Concrete mix forvariousspecifieddesignstrengthsshallbeworkedoutby
theContractorbyanyoftherecognizedmethodofmix design. There
shall be one or twoor moremixdesigns for same
gradeofconcretefordifferentworkability as required for
differentstructuralmemberssuchasslabs,beams,columnsetc.
The selectedmixproportionshallensurethatworkabilityofthefreshconcreteis suitable for
conditions of handling andplacing,so that after compaction it surroundsallreinforcementducts
etc. And completelyfills theform work. When the concrete is hardened its quality shallbe such
as to comply with the strength, durability and other requirements taking into
accounttheconditionstowhichitwillbeexposed.
The preliminary mix design shall assumeonly faircontrol, unless the contractor
canprovefromhislastexperiencethatheiscapableofachievingahighdegreeofcontrol.Givedue regard
tothe criteria of acceptance for preliminary testas stipulatedin IS:456 (pleaseseetable I).
companion cubesshallconstituteatestandtheaveragestrengthof5 companioncubestested. shallnotbe
lessthan thestipulated strengthfor preliminary tests. The designmixandcontrolshallbeaccepted
if onlyoneout of five cubesmaygive a valuelessthanthespecifiedstrength(Ref. Cl. 5.2.2.1 and5.4.2
of IS 456- 1964). The contractor shall preparewell inadvance allcalculations,tabulations, graphs
pertaining to concrete mixdesign and preliminary
test results and submit the copies to Engineer-in-
charge/Consultant for theirinstructions.(PleaseseetableII).Onlythatmixwhichisapproved
in writing by the Engineer-in-charge clearly understood that such approval
shallnotabsolvethecontractorofhisresponsibilityforcomplianceofworkstestresults.
Theminimumcementcontentforvariousmixesaswellas the maximum aggregate
tocementratioshallbeasunder:-
Max. Mix CementContentConcrete
M150 280Kgs.perCmt.(800kgs./100
7.0 M200 320Kgs.perCmt.(900kgs./
M250 350Kgs.per Cmt. (1000
5.0 M300 390Kgs.perCmt.(1100kgs./
M350 425Kgs.perCmt.(1200kgs./100C
4.0 M400 460Kgs.perCmt.(1300kgs./
M450 495Kgs.per Cmt. (1400
Mixing&placingofConcreteMea
surementofMaterials:
Cement :Inproportioning concrete, the quantity ofboth cement and
all be determined by weight. Where the weight of cement is determined by accepting themaker’s
weight per bag, a number of bagsasdirected by the Engineer-In- Charge shallbe weighed separately
to checkte net weight. Where cement is weighed onthe site andnot in bagsitshallbeweighed
separately from the aggregate. Aggregate : Aggregates shall be batched
byweightinmechanicalweighbatcherorbatchingplantunlessotherwisespecified
intheScheduleofquantities.WhereVolumetricproportionsareallowed,withtheconsentoftheEngin
eer-in-charge ,theconversionfromweighttothatof volumeshall beon thebasis
ofdrybulkdensitiesoftheaggregates.
Water:Watershallbemeasuredeitherbyvolume(I)calibratedtanksorweighed,watershallnot
bemeasuredusingordinarybuckets,Measurementsofwatertocontrolandmaintainwatercementr
atioisofutmostimportanceandadequateattention shall be given by
thecontractortothesatisfactionoftheEngineer-in-charge/Consultant.
Allmeasuringequipmentshallbe of approved type and maintained
inserviceableconditionandtheiraccuracyperiodicallychecked.
Mixing:Concreteshallbemixedina mechanical mixer. Through mixing of concrete isessential
and mixer shall always be operated at the speed recommended by
themakers.ThewithIS:1791,butinnocasemixingshallbedoneforlessthan two minutes to ensurethat
the materials are uniformlydistribute and the mass is uniformin colourandconsistency.
Whenthemixingis over the entire contentsof thedrum shallbe
dischargedinoneoperationintoahopperora container to avoid segregation of mortarfrom
coarseaggregates.Iftheconcreteisallowedtobeunloadedonaplatform,itshallbewatertight.
Afterday'sworkthemixershallbethoroughlywashedandbladescleanedotherwisemixingdrumwillsoo
nbecomecallous with harden concrete which willimpair theefficiency
ofthemixer.Insideofthedrumshall be inspected regularly; any
bladeswhicharewornoutorbr
okenshouldbereplaced.
Transporting: Concrete shallbe handledfrom theplace ofmixing tothe placeof finaldepositas
rapidly as practicable by methods which will prevent the segregation or lossof any
of the ingredients. If segregationoccurs duringtransport the concrete shall beremixed before
beingplaced. Placing : Concrete shall be placed in position and
compactedbeforeinitialsettingcommencesandwhen once compacted it shall not
besubsequentlydisturbed.Methodofplacingshallbesuchastoprecludesegregation.
During hot or cold weather, concrete shall be transported in deep containers to reduce loss
ofwater by evaporation during hot weather and loss of heat during cold weather. Deep
containersarespecifiedonaccountoftheirlowerratioofsurfaceareatomass.
Concrete shall notbe dropped into position fromaheightgraterthan 2.0meters.
Before the concreteis actually placed in position, theinsides ofthe forms should
beinspectedtoensurethattheshutteringiswater-
tightandthesurfacetreatedwithapprovedcomposition.Alldebris,sand,dustetc.,shallberemovedfroms
hutteringbeforeconcreteisplacedinposition.
Concreteshallbeplacedinsuitablelayersdependinguponthenatureofworkandinnocaseshallbemoreth
an30cm.Thick,placingshallbeconfineryasfaraspracticable.
Whenconcreteisrequired tobe placedunder adverse conditions viz. Extreme weatherconditions,
under water, in alkali soils and in alkaline water, the requirements as
stipulatedinIS:456shallbecompleted.
Concreteshallbethoroughly compacted
duringtheoperationofplacingandthoroughlyworkedaroundthereinforcement, around
embedded fixtures and intocorners ofand bylighttappingthe form work
ontheexternalfaceattheactual pouring
headandthisshallbefollowedbymechanicalvibrationbyusingapprovedtypeofvibrator.
Beamsand columnsshall bevibrated usingimmersion vibratorsas per IS:
andIS:3558;thin sections likewater tanks wallsshallbe vibrated usingclampon
vibratedandshallvibratedusing surface vibrators. Thecontractorshallatalltimeshavein
reservesufficientvibratorsofeachtypetoguardagainstshutdownoftheworkoccasionedbythefailu
reoftheequipment.Noconcretingshallbepermittedintheeventofpowerfailure.
The intensity andduration ofvibration shall be sufficient to ensure
completesettlementandcompactionwithoutanystratificationofsuccessive
layersorseparationofingredientsor formationof lenience. Immersion vibratorsshall beinserted
vertically and notatany angleat regular intervals not morethan 45 cm. Apart andwithdrawn
veryslowlywhenairbubblesnolongercomeonthesurface.Itisbettertovibrateatsmallerintervalsfor
shooterperiodsof time. To avoidtrapping of airthe thickness
oflayerofconcretetobevibratedshallnotbelessthan 15cm. Andmaximum advisable shall be
cm. The vibratorusedtopushconcrete laterally in theforms of and itshall neverbe used nearer
than 10 cm.Totheformsurfaceinordertoobtainauniformappearance.
Concrete shall becarefullyprotected duringfirststageof hardening from
harmfuleffects of excessive heat, dryingwinds, runningdown of surface water
andshocks.Concrete shall be prevented fromdrying outat leastfor aperiod of14 Daysand
thereafterthe surface kept moist for another 7 day. The methodof curing shall be
thathorizontalsurfacesshallbekept covered with ponded water for a continuousperiod of14
daysandverticalsurfaceslikecolumns,finsetc.Shallbecoveredwithstraw,hessianetc.Andkeptconstantl
y wetby water spray. More sprinkling ofwater onvertical surfacesshall notbeallowed.
Testing andacceptanceofconcrete
MethodofsamplingandtestingshallbecarriedoutasperIS : 1199andIS :
516andevaluationoftestresultsshallbeasperIS:456ingeneralandclause5.4hereafterionparticular
Testsshallbeconducted oncompanioncubesor specimen.
Companionspecimensshallbecastfromasinglebatchofconcreteandshallbeofthesameageat
the time of testing..The averagestrength ofthree companionspecimens shallconstitute theresult
of that test. From each sample of concrete 6 companion cubes shall be taken.
Threeoftheseshallbetestedat7daysandtheremaining3at28days.
A minimumoftwosuchsamples giving12 cubesshall be obtained per mixper dayor forevery
cu.m. or fractionthereof for each grade whichever gives more number of
cubes.Allthesecubesshallbetestedinthesitelaboratoryoranyrecognizedlaboratory.TheEngineer-in-
charge/Consultantmayathisabsolutediscretionincreaseordecreasethe
frequencyoftests.
Thecriteria foracceptance ofa concreteshall bein accordancewith the latest version of IS
:456andtheconsequenceofrejectionshallbeat the expenseofcontractors.
Strengthof28daysshallbeconsideredforacceptance.
Strengthrequirementofconcrete(AllvaluesareinKgs./Cm2)
CompressiveStrengthof15.c.m.Cubesatdaysaftermixing,conductedinaccordan
GradeofConcrete PreliminaryTest WorkTestMin.
Mode ofmeasurementandpayment:
Therateshallbeforaunitofonecubicmeter.
Providing and fixing M.S.grill, gate,stair / balcony railing , elevation element of required
patterninframesofwindows
etc.withM.S.flats,squareorroundbarsetc.includingprimingcoatwithapprovedsteelprimerallcompl
Applyingprimingcoatovernewsteelandothermetelsurfaceafterandincludingpreparingthesurfaceb
ythroughlycleaning,oil,grease,dirtandotherforeignmatterandscouredwithbrushesfinesteelwood,s
crapersandsand paperwithreadymixedprimingpaintbrushingredlead.
Paintingtwocoats(excluding
primingcoat)onnewsteelandothermetalsurfacewithenamelpaint,brushing,interiortogiveanevensh
adeincludingcleaningthesurfaceanevenshadeincludingcleaningthesurfaceofalldirt,dustandotherf
AllstructuralsteelworkshallconformtocodeofpracticeforuseofstructuralsteelinGeneralBuildingc
onstructionI.S.800–1962
Materials: Thestructuralsteelworkshallconform toM-22.Redleadpaint
primershallconformtoI.S.:102-1962.
Thesteel sections asspecifiedorrequiredshallbecut, square andto correctlengths,
asperdrawingsanddesign.The cut ends exposedto viewshall befinished smooth. No two
piecesshallbeweldedorotherwisejointed to makeup therequired lengthof member,
exceptasindicatedinthedrawingsorasdirected.Allstraighteningandshapingtoformshallbedonebyappli
cationofpressureandnotby hammering. Any bendingor cuttingshall becarried outinsucha
meaner asnot to impair the strength ofthe metal. All operations shall be donein
coldstateunlessotherwisedirected/permitted.Steelrivetedorboltedinbuiltupsections,frame
Thesteelstructure as shown in the drawings or as per direction of the Engineer-in-charge
shallbe laid out onelevel platformto full scale and to fullsize orin parts. A steel
tapeshallbeusedformeasurementstoensuremaximumaccuracy.
Wooden templates12 mm to 19 mm thick or metal sheet template shall bemade
tocorrespondtoeach
connecting gussets plate andrivetholesshallbeaccuratelymarkedonthem and drilled.
Thetemplateshallbelaidon the steel members, andholes of the steel members shall alsobe
markedforcutting.ThebaseofsteelcolumnsandthepositionofAnchorboltsshallbecarefullysetout.
Allstiffenersshallbeformedbypressureandwherepracticable,themetalshallnotbecutandwelded
in making these. In majorworks orwhere sospecified shopdrawings
givingcompletedetailsandinformationforthefabricationofthecomponentpartsof thestructure,
includinglocationtypesize,lengthanddetailsofrivets,bolts,orweldshallbepreparedinadvanceoftheactu
al fabrication andasapproved. The drawingsshall indicatethe shopand fieldrivets
andbolts.Thesteelmembershallbedistinctlymarkedorstenciledwithpaintwiththe
identification mark asgivenin the shop drawings. The barsshall be thickened at the ends,
soastoprovideforscrewedthreadsandgraduallytaperedofftomeettheirnormalsection.
Greataccuracyshallbeobservedinfabricationofvarious member, so thatthese canbeassembled
withoutbeing undulypacked, strainedor forced into position and when built
up,shallbetrueandfreeformtwist,bniks,buckles,oropenjoints.Beforemakingholesindividualmember
sfor fabrication, the steel work intended to be riveted or bolted together shall
beassembledorclampedproperlyandtightlysoastoensurecloseabuttingorlappingofthe
different members. All stiffeners shallbear tightlyboth at top and bottom without being
drawnorcaulked.Theabuttingjointsshallbecut or dressed trueandstraight and fitted close
together.Webspliceplatesandfilters under stiffeners shallbe cut to fit within 3 mm or
flangeangles,webplatesofgirdersshallhavenotcoverplates,shallhavetheirendsflush
withthetopofanglesformingtheflangesunlessotherwiserequired.Thewebplateswhenspicedshallhave
clearanceofmorethan6mm.
Theerection, clearancefor cleared ends of members connectingsteel to steel shall
preferablybenotgreater than 1.5 mm.The erection clearance at theends of beams without web
cleatsshalltobemore that 3 mm at eachendbut where for a practical
reasongreaterclearanceisnecessary,suitablydesignedseatingshallbeprovided.
Pinsandrollersshallbeaccuratelyturnedtogauge.Theseshallbestraightand smoothand
free from flows.Theroller bearing shallbeprovidedwithadequatearrangementforholdingthegirders
or trussrestingonit. Incolumnscapsand bases, the ends of shafts together
withtheattachedgussetsangles,channelsetc.,afterrivetingtogethershallbeaccuratelymechanized
so thatthe parts connected butt againsteach other over the entire surfaces of
contractconnectinganglesorchannelsshallbefabricatedand placed in
positionwithgreateraccuracysothattheyarenotundulyreducedinthicknessbymachining.
Theendsof bearing stiffeners shallbemachanisedorground to fit tightly bothatthetopandbottom.
All holesshallgenerallybedrilled to the required sizeandat the required sizeandatrequired
position. Sub punchingshall be permitted, provided it is done 3 mm orless
indiameterandremadethereaftertotherequiredsize. The holesfor rivets and bolts shall
belargerby0.4to6mmthanthenominaldiameterofrivetsorblackboltsdependinguponthediameterofri
Holesshall have their axis perpendicular to the surface bored through. The
drillingorreameringshallbefreeform butts, andtheholes shouldbe cleanand accurate. Holes
forcountershunkboltsshallbemadeinsuchamannerthat theirheads fitflush with the
surfaceafterfixing.
Thefabrication work shallbecompleted in workshop as faras it is practicable to do so.
Sitejointsshallbedonewithrivetsandfitted bolts orblackbolts, asshowninthe drawings
orasdirected. Generally the following principles shall govern the use of rivets turned
andfittedbolts,andblackbolts.
(i) Rivetsandturnedandfittedboltsshallbeusedwheretheconnectionissuchthatslipunderloadhas
(ii) Blackboltsmaybeusedverysparinglywhereaforceiscarriedthroughaconnectionwithout
impact,vibrationorreversalofstresses.
Riveting:Thepartsassembledforrivetingshallbeinclosecontact with each other
andthebearingstiffenersshallbeartightlybothattopandbottomwithoutbeingdrawn
orcaulked.Memberstoberivetedshall beproperly pinnedor boltedand rigidlyheld
togetherwhileriveting.Driftingofholesshallnotbepermitted exceptto drawthe partstogether
andthedriftingtoolssousedshall have maximum diameternot exceedingthe nominal diameter
ofrivets or bolts. Drifting doneduring assemblingshall notdistort the metal or
enlargetheholes.
Theshanks of rivets shallprojectbeyondtheplatesurface sufficiently soasto fill
theHolethoroughlyandfromtherequiredheadafterriveting.
The rivetingshall be done by hydraulicor pneumatic process. Howeverwhere
suchfacilitiesarenotavailable, handrivetingmaybe permitted. The rivet shall be heated red -hot,
care beingtaken to controlthetemperature ofheating soas notto burnthe steel. Riveting
ofdiameterlessthan 10mm maybe fitted cold. Rivets shall be of heat finish with heads full and of
equalsize.Allloose,burnt or
badlyformedrivetswithconcentricordeficientheadsshallbecutoutandreplaced.Theheadsofrivetsshal
lbecentral to shanks and shall grip the assembled membersfirmly. In cutting out rivets, care
shallbetakensoas notbe injure the assembled,
members,caulkingorrecoupingshallnotbepermitted.
For testingrivets, hammerweighing approximately 0.25kg. shallbeusedof the rivets
shallbetapped,slackrivetswillgiveahollowsoundandajar.
Allrivetheadsshallbepaintedwithredleadpaintwithinaweekoftheirfixing.
Boltingallboltheadsand nutsshall behexagonal andof equalsize unless
specifiedotherwise.ThescrewedheadsshallconformtoI.S.:1363:1960andthethreadedsurfaceshallno
Theboltsshallbeofsuchlengthsoastoprojecttwoclearthreadsthenuts,whenfixedinpositionand
these shallfit in the holeswithoutanyshakes.The nut shallbe fit in the threaded
endsofboltsproperly.Whereturnedandfittedboltsarerequiredtobeusedinplaceofrivetstheyshall
beprovidedwith washers not less that6 mm thick so that the nut when tightened shall
notbearontheunthreadedbodyof the bolt. Taperedwashersshallbeprovidedforall headsand
nutsbearingon leveled surfaces. The threaded portion of the boltsshall notbe withinthe
thicknessofthepartsbolted together. The facesof the bolt and nutsabutting against steel members
shallbemachinefinished.Wherethereisariskofthenutbeingremovedorbecominglooseduetovibrations
orreversalofstresses, theseshallbesecuredfrom slackening bytheuse
oflocknuts,springwashers,crosscuttingorhammeringdownofthreadsasdirected.
Bolts, nuts and washersshall bethoroughly cleanedand dipped in double boiled
linseedoilbeforeuse.Thewhole steelwork shall be painted with a coat of priming coat of red
lead,asperrelevantspecificationsofpainting.
Mode ofmeasurementandpayment:
Thesteelworkshallbemeasuredingeneralasunder.
(a) Allworkshallbemeasuredonthebasisoffinisheddimensionsasfixedatsiteandmeasurednet
unlessspecifiedotherwise.
(b) Theweightofsteel sections, steel stripsinfinished workshall becalculated
fromstandardweighton the same basis on which steel is suppliedto the contractor by
departmentorthosegiveninrelevantI.S.ifsteelisarrangedbythecontractor.
(c) TheweightofsteelplatesandstripsshallbetakenfromrelevantI.S.basedon7.85kg/sq.
meterforeverymillimetersheetthicknessifsteelissupplied by the contractor, otherwisetheweight
shallbe calculatedon thebasis onwhich steelis supplied to the contractor bydepartment.
(d) Unlessotherwisespecifiedweightofclearest,brackets,packingpieces,bolts,nuts,washerS
distancepieces,separators,diaphragm gusset (taking overall squaredimensions)
fishplatesetc.shallbeaddedtotheweightofrespectiveitems.
(e) In rivetedwork allowance to bemadeof weight of rivet hands.No deductions
shallbemadeforrivetorboltholesexcludingholesforanchororholdingdownbolts.
(f) Forforgedsteelandsteelcastingweightshallbecalculatedonthebasisof850kg/cum.
(g) Unlessotherwisespecifiedanadditionalof2.5percentoftheweightofstructureshallbemadefors
hopandsiterivetheadsinrivetedsteelstructure.
(h) Unlessotherwisespecifiednoallowanceshallbemadefortheweldmetalincaseofweldedsteels
(i) Dimensions otherthancross sections andthicknessofplatesshallbemeasuredtonearest
(j) Milltoleranceshallbeignoredwhenweightisdeterminedbycalculation.
Therateincludescostofallmaterial,labour,erection,hoisting, scaffoldingprotectivemeasure,
requiredforpropercompletionoftheitemofwork.
Thisshallalsoincludedconveyanceanddeliveryhandling,loading,unloadingandstoringetc.requir
edforcompletingtheitemdescribedaboveincludingnecessarywastageinvolved.
ModeofMeasurement&Payment:TheitemshallbepaidinKilograms
Theactual piece(unpainted) shallbetakenfor weighing andthesamepiece
theoreticalweightshallbedone.Whicheverislesser,shallbepaid.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD
P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME)
AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE,
SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME
I AGREE TO ABIDE BY THEM.
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( North Zone)
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the term and
conditions of tender for the work of WIRE FENCING WORK ON DIFFERENT AMC PLOTS ON
DIFFERENT TP ROAD IN NARODA WARD NORTH ZONE (ARC)
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to pay to
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad. Specified tip to his first written
demand, without demur without delay and without the necessary of a previous of judicial or administrative
procedures and without the necessity of a previous of judicial or administrative procedures and without the
necessity to prove to the Bank the defects or short comings or debits of the contractor any sum within the limit
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the period
that would be taken for the acceptance of tender. However unless a demand of claim under this guarantee is
made on its in writing on or before the (Date to be specified will not be less than 180 days from the stipulated
date of receiving the tender) we shall be discharge from all liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, Ahmedabad Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .Asper ANNEXURE –
Seal and Signature of the Bidder Addl. City Engineer (N.Z)
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for FIXING GATES AT DIFFERENT PLOTS IN
WARD IN NORTH ZONE.(ARC)
.as specified in the tender by the Ahmedabad Municipal Corporation.
Whereas the said M/s __________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE GUARANTES
BOND to the AMC for the work undertakes by M/s.
________________________ and Whereas. We, the _____________________________Bank have agreed to
provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by way of these Bond
1. The contract value of the contract provided to M/s. _____________________by the AMC in Rs. _
__________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as to ensure
and indemnify the AMC for full and proper performance of the contract by M/s.______________________
the _______________________________Bank hereby indemnify the AMC for all losses and / or damages to
the road surface which would be laid or resurface by M/s.________________________ and such
PERFORMACE GUARANTEE would include any damage to hot mixes, dense bituminous macadam asphalt,
concrete, seal coat, concrete blocks, road markings, signage, steel structures which may be suffered by the
AMC as a result of defective production of mixes, because of poor workmanship, or at all, by way of this
bond, we the _________________________________Bank agree and promises that in the eventuality of the
contractors M/s. __________________________________________not repairing or remeding the Problem,
loss or damage to the road surface we shall indemnify and pay the AMC such expenses, losses and damages
that may be incurred by the AMC, as a result of the AMC getting the work done itself or from the other
2. We _______________________________ Bank agree and understand that the decision as to whether any
losses or damages to the project have taken place or not and / or whether the work suffers from poor
workmanship or not will be taken by the Commissioner of AMC and on the Commissioner's decision
regarding such losses or damages or defect whatsoever being so notified by the AMC to us, We shall
immediately take steps and ensure that M/s.__________________________________ faithfully and
diligently carry out the necessary remedial steps to the full satisfaction of the Commissioner of the AMC. The
opinion of the Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of arriving at
such decision as aforesaid it will be open to the Commissioner of the AMC in case he so desires, to delegate
this power to subordinate like the city Engineer to take appreciate decision and the decisions referred to above
will be deemed to be properly take and as if taken by the Commissioner of the AMC. In the eventually of
M/s.______________ not taking remedial action to the almost satisfaction of the Commissioner of
AMC. The AMC will be entitled to get the work done itself or from sources. On the Commissioner of the
AMC notifying to us the total expenses incurred for this purpose. We hereby expressly have under taken to
pay the AMC the said amount forth with and in any case not less than 7 days from taken to pay the AMC the
said binding the amount indicted by the Commissioner of the AMC and our obligation to pay such amount
will be continuing of the AMC and our obligation irrespective of any dispute of differences that may arise
between us and M/s. _____________________________ of between the AMC and M/s.
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE is limited
to 5% of the said contract value and accordingly it comes to Rs. _______________________ our liability
will be in all cases be limited to Rs._________________.
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of five years
and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such completion
that to us. In case, no such completion it is notified, this performance guarantee will be a valid from five years
from the date of execution of this agreement. The Performance Guarantee will come into effect from such
completion date. In case however, the contract of several parts it will be opened to the Commissioner to
indicate separate completion dates for separate part and to simultaneously indicate a break up of the contract
value equivalent to the separate part. In which case the PERFORMANCE GUARNATEE to extent of the
different completion dates. It is expressly understood that the considering this period of five years and one
month, the date by which the Corporation, intimate the Bank about the losses, damages or problems as the
case may be, shall be considered as long as such intimation is within a period of five years and one month
from the completion date. We the ___________________ Bank will be liable, irrespective of whether the
remedial actions or lack thereof has taken place after the period of the five years and one month.
5. We _________________________________ Bank agree that the PERFORMANCE GUARANTEE which
is continuing guarantee will be binding, and enforceable against us irrespective of any difference / disputes
between the AMC and M/s. __________________________of between us and
and irrespective of any change or variation or execution time or any forbearance or waiver made or grant by
6. In case any disputes arise as to the interpretation or implementation or implementation of this
PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he Commissioner of
AMC whose decision in the matter will be final. In case any resource to any court of law is necessitated, the
appropriate Civil Court in the Ahmedabad along will have Jurisdiction.
Date: Signature of Contractor
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between Ahmedabad Municipal Corporation
………………..(here in after called “the Employer”) of the one part and
in after called “the Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor for the
execution and completion of such works and the remedying of any defects therein at a contract price of
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively assigned to
them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after mentioned,
the Contractor hereby covenants with the Employer to execute and complete the Works and remedy any
defects therein in conformity in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and completion of
the Works and the remedying of defects therein the Contract Price or such other sum as may become payable
under the provisions of the Contract at the times and in the manner prescribed by the Contract. IN WITNESS
whereof the parties hereto have caused this Agreement to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
On behalf of Ahmedabad Municipal
On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Sample Form for updating - qualification information
STATEMENT NO.-1
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Year Name of Employer Value of the Reasons/Details for Remarks showing
Project Project (`) litigation/arbitration Present Status
(1) The bidder shall furnish separate table for individual project.
(2) The above information shall be supported with necessary documents otherwise the same shall be treat as null
(3) A consistent history of arbitration awards? Judgments against the applicants or any partner of a joint venture
may result in disqualification for proposed work.
(1) If the details of litigation History is hidden by the applicant and later on it comes to knowledge of the
employer the bidder shall be disqualified for the proposed work and other appropriate actions shall be taken
against the bidder.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
W•thÍtulltkJtr»tofhuRxxuLzhbtkbhtb<-rlCtJltkz[ulus, vtKe, htuz, rcÕz´dltsw>t sw>t ftbtu<&t
Mxu.f.X.lk. 939 <t.27.07.2012 &e JtÕbefembtslebkz¤eytuluytvJtbtkytJ<t z[ulus
zemeÕx´dltftbtubtxultdrhfyr^fthvºtfbtksKtJujmbgbgtoœtbtkVrhgtœlturlftjfhJt<ubsmuJtfegftbdeh
embgbgtoœtbtkvwKo&tg<u btxu R-dJolLmme.me.yth.yum. «tusufxyk<od<<t.21.08.2021lt mh¾gwjh
<&t mexeRsluh Ft<w vrhvºt lk.2 <t. 07.10.2023 ltvrhvºt,Bgw.frb.©ele<theF 23.04.2026 le
belexmytuVbexekdltkbwœTt lk.21 ylwkm^tluz[tVxbtkmtbujvulÕxe Nh<tuxuLzhbtkhtFJtleylu<u bwsc le
vulÕxeJmwjJtlexuLzh Nh<tuleaubwsc Au.
1. me.me.yth.yum.btkltuk^t<e
VrhgtœJtuzoltkRsluhMxtVîthtftuLx[tfxh/yusLmeluJtuxmyuv/xujeVtulefbtægb&ey&JtYcYjuFe
<btkVrhgtœytvJtbtkytJNu.mœhVrhgtœleftbdehe yum.yuj.yu. le
mbgbgtoœtbtkfhJtlehnuNu.
2. ftbdehevwKo>ctœ<ult Vtuxtud{tV,mxeoVefuxyluftbdehevwKo> le òK yum.yuj.yu.
mbgbgtoœtbtkJtuzoltMxtVlufhJtlehnuNu.
3. stuytvluytvujVrhgtœ yum.yuj.yu.
mbgbgtoœtbtkvwKolne&tg<tuytmtbujftuÐfbwsclevulÕxe le
hfbytvltkcejbtk&eJmwjfhJtbtkytJNu.
4. ytvlumtukvJtbtkytJujme.me.yth.yum. VrhgtœtultuhevtuxoyXJtzef ^tuhKurlg<Vtubuoxbtk
«btKe<fheJtuzoyturVmuhswfhJtltuhnuNu.
5. ftuLx[tfxhîthtyhsœthluVtulfgtoctœmœhVrhgtœyLgJtuzo fu yLgrzvtxobuLx fu
y.Bgw.ftuvtuohuNlltftgoûtuºtbtk l ytJ<e ntuR<ule òKJtuzoMxtVolu<tðftrjffhJtlehnuNu.
me.me.yth.yumVrhgtœmbgbgtoœtbtkrlftj l &JtltmkstudtubtkfhJtle&<e 5uluÕxe le
rJd<leauBþsc Au.
Sr. Department Category Problem SLA Penalty
1 Engineering Water>>Engineering Inadequate water or low inflow 240
pressure - Eng Hours
2 Engineering Water>>Engineering Leakage In Pipe Line - Eng 48
3 Engineering Water>>Engineering Water quality-Polluted water - 24
4 Engineering Water>>Engineering No Water - Eng 240
5 Engineering Drainage>>Engineering Drain Blockage or Choking on 48
TP road - Eng Hours
6 Engineering Drainage>>Engineering Overflowing of main line and 48
distribution line on road - Eng Hours
7 Engineering Drainage>>Engineering No Drainage Manhole cover - 24
8 Engineering Drainage>>Engineering Frequent Breakdown & Blockage 96
of Drain - Eng Hours
9 Engineering Road Pot holes on the Road 24
10 Engineering Road Patch work Relaying of a portion 72
11 Engineering Road Deep Pit - Large settlement of 48
12 Engineering Road Removal of waste-Dust Lying on 72
both side of the road after re Hours
13 Engineering Footpath Footpath Repairing Required 168
14 Engineering Public Building No Water Supply InA Public 24
15 Engineering Public Building Public Toilets and Urinals - 360
Repairing of Doors, Windows, Hours
Tiles or Sheets
16 Engineering Public Building Other Maintenance 168
17 Engineering Drainage>>Engineering Contractor Had not disposed off 48
the Manhole Silt Properly - Eng Hours
18 Engineering Drainage>>Engineering Raising the Manhole Cover & 168
Catch Pit Up To the Road Level - Hours
19 Engineering Drainage>>Engineering Lowering the Manhole cover & 168
Catch pit - Eng Hours
20 Engineering Drainage>>Engineering Public Toilets and Urinals - 72
Drainage Line Blockage or Hours
21 Engineering Drainage>>Engineering Public Toilets and Urinals - 168
Drainage Line Breakage Hours
22 Engineering Water>>Engineering Public Toilets and Urinals - Non- 168
Availability of Water/Cleaning of Hours
Water Tank/Broken Tank Cover
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No 3 Volume 1.pdf
Tender No 3 Volume 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .