Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-AOC | 1 | Accepted-AOC LOWEST | |
| 2 | 2₹5.6 L+₹7,618.96 (1.37%)Rejected-AOC | 2 | Rejected-AOC 2ND LOWEST |
| Sl No | Description | Qty | Unit | PRASEED P.T L1 | V.M.MAJEED L2 |
|---|---|---|---|---|---|
| 1.00Renovation work of Bridges | |||||
| 1.00 | 12.3:Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 46.13 | sqm | 352.59 ₹16,264.98 Lowest | 357.42 ₹16,487.78 |
| 1.00 | 2.5.2.A:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(II) By Mechanical Means (A) Cement Concrete | 1.22 | cum | 766.5 ₹938.2 Lowest | 777 ₹951.05 |
| 1.00 | 2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(B) Rubble Stone Masonry in Cement Mortar | 2.47 | cum | 693.13 ₹1,713.42 Lowest | 702.63 ₹1,736.9 |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 11.46 | cum | 392.01 ₹4,492.43 Lowest | 397.38 ₹4,553.97 |
| 1.00 | OD32453/2024-2025:Dry rubble masonry _Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and cost and conveyance of all materials labour charges etc complete as per direction of departmental officers at site (Modified data 60.7.1) | 34.1 | cum | 3,982.51 ₹1,35,799.61 Lowest | 4,037.07 ₹1,37,660.05 |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 8.79 | cum | 9,403.86 ₹82,612.91 Lowest | 9,532.68 ₹83,744.59 |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 1.16 | tonne | 96,339.19 ₹1,12,042.48 Lowest | 97,658.91 ₹1,13,577.31 |
| 1.01 | OD33985/2024-2025:Structural steel work in single section, fixed with or without connecting plate, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,080 | kg | 112.78 ₹1,21,802.4 Lowest | 114.33 ₹1,23,476.4 |
| 1.01 | OD34282/2024-2025:Engaging man coolies for different types of works | 4 | Day | 1,001.92 ₹4,007.68 Lowest | 1,015.65 ₹4,062.6 |
Tender Value
₹5.1 L
EMD Value
₹12,707
Closing Date
27 Mar 2025, 4:00 pmClosed
SECRETARY
SECRETARY PANANCHERY GP
223/2024-25Renovation Of Bridges - Moolamkodu Poomarachuvad Ayod Cananlpuram Road
2025_LSGD_725296_12
1/2025/SDFMLA
Open Tender
Civil Works - Roads
Item Rate
180 days
PANANCHERY PT
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,125
Yes
₹12,707
Yes
8 Sept 2025
20 Mar 2025
29 Mar 2025
20 Mar 2025
27 Mar 2025
20 Mar 2025
20 Mar 2025 - 27 Mar 2025
Amount
Renovation work of Bridges
12.3:Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
2.5.2.A:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(II) By Mechanical Means (A) Cement Concrete
2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(B) Rubble Stone Masonry in Cement Mortar
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD32453/2024-2025:Dry rubble masonry _Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and cost and conveyance of all materials labour charges etc complete as per direction of departmental officers at site (Modified data 60.7.1)
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD33985/2024-2025:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
OD34282/2024-2025:Engaging man coolies for different types of works
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m IV. R.C.C. grade M 25
11.4.1.2:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (ii) Nominal mix 1:3.6 (Hand mixing)
V.M.MAJEED (BID ID -2177193)
Bidder Name
V.M.MAJEED
PRASEED P.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1218966.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .