Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Woodhill Infrastructure Ltd L1 |
|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | ||||
| 1.00Providing and applying tack coat using VG 10 grade Bitumen with tack coat distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | ||||
| 1.01 | Bageshwer-Girichina-Someshwer-Dwarahat-vimadeshwer-Eda -Ranikhet SH-58 Motor Road km 50 to 51 (Binta Someshwer Girichina (0.610 Km), | 3,690.5 | Sqm. | 11 ₹40,595.5 Lowest |
| 1.02 | Bagwalipokher Gagas Motor Road km 1, 5, and km 8 (ODR) Km 2.40 km | 11,825 | Sqm. | 11 ₹1,30,075 Lowest |
| 1.03 | Artola Jageshwer Naini Motor Road km 4, 12 and km 20 (L-3.00KM) | 12,375 | Sqm. | 11 ₹1,36,125 Lowest |
| 1.04 | Lohaghat Barakot Simlakhet kaflikhan Bhanoli Motor Road(SH-57) KM 43, 57,58,59,66,km 76 (L-5.20KM) | 21,450 | Sqm. | 11 ₹2,35,950 Lowest |
| 1.05 | N.T.D Kapadkhan Dhulchina Motor Road km 1,2,4,5,6,9,11 (3.70 Km) | 15,262.5 | Sqm. | 11 ₹1,67,887.5 Lowest |
| 2.00Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (Bitumen Binder @ 5.4% of mix) | ||||
| 2.01 | Bageshwer-Girichina-Someshwer-Dwarahat-vimadeshwer-Eda -Ranikhet SH-58 Motor Road km 50 to 51 (Binta Someshwer Girichina (0.610 Km), | 110.75 | cum | 10,495 ₹11,62,321.25 Lowest |
| 2.02 | Bagwalipokher Gagas Motor Road km 1, 5, and km 8 (ODR) Km 2.40 km | 354.75 | cum | 10,495 ₹37,23,101.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
19 Dec 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer 1st Circle PWD Almora
Improvement of riding quality by 30mm BC of Bageshwar Girechhina Someshwar Dwarahat Vimandeshwar Era Ranikhet Motor Road and other Motor Road
2020_pwd_27928_1
4639/Nivida-01/20 dated 02/12/2020
Open Tender
Civil Works
Item Rate
90 days
Almora
As per technical bid
2 documents required · 2 mandatory
₹5,900
EE CD PWD Almora
₹4.3 L
Almora
26 Dec 2020
5 Dec 2020
19 Dec 2020
5 Dec 2020
19 Dec 2020
12 Dec 2020
11 Dec 2020
60 days
Amount
Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment.
Providing and applying tack coat using VG 10 grade Bitumen with tack coat distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bageshwer-Girichina-Someshwer-Dwarahat-vimadeshwer-Eda -Ranikhet SH-58 Motor Road km 50 to 51 (Binta Someshwer Girichina (0.610 Km),
Bagwalipokher Gagas Motor Road km 1, 5, and km 8 (ODR) Km 2.40 km
Artola Jageshwer Naini Motor Road km 4, 12 and km 20 (L-3.00KM)
Lohaghat Barakot Simlakhet kaflikhan Bhanoli Motor Road(SH-57) KM 43, 57,58,59,66,km 76 (L-5.20KM)
N.T.D Kapadkhan Dhulchina Motor Road km 1,2,4,5,6,9,11 (3.70 Km)
Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (Bitumen Binder @ 5.4% of mix)
Bageshwer-Girichina-Someshwer-Dwarahat-vimadeshwer-Eda -Ranikhet SH-58 Motor Road km 50 to 51 (Binta Someshwer Girichina (0.610 Km),
Bagwalipokher Gagas Motor Road km 1, 5, and km 8 (ODR) Km 2.40 km
Artola Jageshwer Naini Motor Road km 4, 12 and km 20 (L-3.00KM)
Lohaghat Barakot Simlakhet kaflikhan Bhanoli Motor Road(SH-57) KM 43, 57,58,59,66,km 76 (L-5.20KM)
N.T.D Kapadkhan Dhulchina Motor Road km 1,2,4,5,6,9,11 (3.70 Km)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .