Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | L1 | Accepted-AOC work completed as per contract agreement | |
| 2 | L2₹14.4 L+₹2.4 L (20.0%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹17.1 L+₹5.1 L (42.5%)Rejected-Finance CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | L3 | Rejected-Finance L3 | |
| 4 | L4₹17.3 L+₹5.3 L (44.5%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹20.1 L+₹8.1 L (68.0%)Rejected-Finance HP PWD KALPA HIMACHAL PRADESH HP | UNA | HIMACHAL PRADESH | 174301 | L5 | Rejected-Finance L5 |
Tender Value
₹9.1 L
EMD Value
₹18,200
Closing Date
20 Aug 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE GHU Dvin HPPWD GHU
EE GHU Dvin HPPWD GHU
Civilworks
2021_PWD_50874_1
GSSSAuhar
Open Tender
Civil Works
Item Rate
90 days
Ghumarwan
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
Yes
EE Ghumarwin
₹18,200
Yes
EE GHU Dvin HPPWD GHU
6 May 2023
6 Aug 2021
20 Aug 2021
6 Aug 2021
20 Aug 2021
6 Aug 2021
6 Aug 2021 - 20 Aug 2021
18 Aug 2021
120 days
Amount
Excavation in foundation, trenches etc., in all classification of soil such as pick work, jumper work, blasting work, soft rock and hard rock including chiselling wedging and any other mixed variety of soil in dry or saturated conditions up to any depth and lift including pumping and bailing out water where required including stacking the serviceable and unserviceable material separately as directed and then returing the stacked soil in fifteen centimeters layers when required into plinth and sides of foundation etcetra consolidating each deposited layer by ramming and watering and then disposing of all surplus un-serviceable excavated earth as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and Laying concrete 1:4:8 (one cement : four sand : eight crushed stone aggregate) (40mm forty millimetre) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Random rubble masonary/polygonal rubble masonary (uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including leveling up with cement concrete 1:6 :12 (One Cement : six sand : twelve graded crushed stone aggregate 20 mm ( Twenty millimeter) nominal size at plinth level in cement mortar 1:6 ( One cement : six sand ) as per HP.PWD Specification clause 11.1.1 & 4.4.1. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.As per HP.PWD specification 1990 vol-I clause 11.1.3
Cement concrete flooring 1:2:4 ( one cement : two sand: four graded crushed/stone aggregate 20 mm twenty millimetre). nominal size) lead in one layer finished with a floating coat neat cement 40 mm ( forty millimeter) thick including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other construction worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
15mm (fifteen millimetre) Cement plaster in single coat on the rough side of brick/ concrete/stone walls for interior plastering upto all floor level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm (eighty millimetre) in girth and finished even and smooth. Cement Mortar 1:5 (one cement : five sand) as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
ABHISHEK CHAUHAN
Ashok Kumar
Sangeeta Modgil
Ramesh Kumar Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .