| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC | ₹45.3 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹45.7 L+₹46,312 (1.02%)Rejected-AOC | ₹45.7 L+₹46,312 (1.02%) | L2 | Rejected-AOC Not awarded |
| 3 | L3₹46.2 L+₹91,575 (2.02%)Rejected-AOC C O HARU CH DEY KACHUGAON P O P S KACHUGAON DIST KOKRAJHAR BTC ASSAM PIN 783370 | KACHUGAON | KOKRAJHAR | ASSAM | 783370 | ₹46.2 L+₹91,575 (2.02%) | L3 | Rejected-AOC Not awarded |
| Sl No | Description | Qty | Unit | SRI BIBEKANANDA DEY L3 | Nabajit Kumar Brahma L1 | DHILAN BASUMATARY L2 |
|---|---|---|---|---|---|---|
| 1.00 | 1. SMART FENCING BOUNDARY WALL :
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.
2.8.1 All kinds of soil | 120.5 | Cum | 292.73 ₹35,272.5 | 285 ₹34,341.08 Lowest | 289.86 ₹34,926.68 |
| 2.00 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete:
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 150.8 | Sqm | 619.34 ₹93,396.47 | 605 ₹91,234 Lowest | 613.27 ₹92,481.12 |
| 3.00 | Providing and laying in position cement concrete of specified grade all works upto plinth.
A) In prop. 1:3:6 | 6.53 | Cum | 6,452.57 ₹42,103.02 | 6,326.05 ₹41,277.48 Lowest | 6,389.31 ₹41,690.25 |
| 4.00 | Steel reinforcement for R.C.C work including straightening, leaning, cutting, bending to proper shape placing in position and binding upto plinth level.
5.22.6 TMT bar Fe500D or more | 4,511.1 | Kg | 90.73 ₹4,09,291.65 | 88.95 ₹4,01,261.9 Lowest | 89.84 ₹4,05,276.77 |
| 5.00 | Centering and shuttering including strutting, propping etc. end removal of the same…..5.9.1. Foundation Footing, base of column etc. for mass concrete. | 120.78 | Sqm | 314.11 ₹37,939.78 | 307.95 ₹37,195.74 Lowest | 311.03 ₹37,567.76 |
| 6.00 | 5.9.5 Lintels, Plinth beams, girders, cantilevers etc. | 130.5 | Sqm | 620.52 ₹80,977.86 | 608.35 ₹79,389.68 Lowest | 614.43 ₹80,183.12 |
| 7.00 | 5.9.6 Column pillar post pire abutment, post and struts. | 138.04 | Sqm | 820.34 ₹1,13,239.73 | 804.25 ₹1,11,018.67 Lowest | 812.29 ₹1,12,128.51 |
| 8.00 | Providing and laying in position specified grade of R.C.C.
Excluding cost of centering, shuttering up to P.L.
5.1.3 Prop. 1:2:4 | 42.34 | Cum | 8,104.56 ₹3,43,147.07 | 7,945.65 ₹3,36,418.82 Lowest | 8,025.11 ₹3,39,783.16 |
| 9.00 | Reinforcement R.C.C. works column, pillar, pire, etc. upto floor v (five) level, excluding cost of centering, shuttering and reinforcement.
5.2.2 Prop. 1:1.5:3 | 6.96 | Cum | 10,388.75 ₹72,305.7 | 10,185.05 ₹70,887.95 Lowest | 10,286.9 ₹71,596.82 |
| 10.00 | Half brick masonry with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
6.13.2 Cement mortar 1:4. | 90.05 | Sqm | 1,038.41 ₹93,503.63 | 1,018.05 ₹91,670.31 Lowest | 1,028.23 ₹92,586.97 |
Tender Value
₹45.3 L
EMD Value
₹90,600
Closing Date
2 Aug 2025, 1:00 pmClosed
the S.E.PWD, Kjr Bldg Circle
O/o the S.E.PWD, Kjr Bldg Circle
Construction of Boundary Wall and Children Park at Hem Chandra Samadhi at Paikandara, Kazigaon.
2025_BoTC_45749_1
No. TECH- 05/SE(B)/E-Tender
Open Tender
Civil Works - Building
Item Rate
180 days
Kokrajhar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹90,600
Yes
12 Aug 2025
18 Jul 2025
6 Aug 2025
18 Jul 2025
2 Aug 2025
18 Jul 2025
18 Jul 2025 - 28 Jul 2025
Amount
1. SMART FENCING BOUNDARY WALL : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. 2.8.1 All kinds of soil
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete: 16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Providing and laying in position cement concrete of specified grade all works upto plinth. A) In prop. 1:3:6
Steel reinforcement for R.C.C work including straightening, leaning, cutting, bending to proper shape placing in position and binding upto plinth level. 5.22.6 TMT bar Fe500D or more
Centering and shuttering including strutting, propping etc. end removal of the same…..5.9.1. Foundation Footing, base of column etc. for mass concrete.
5.9.5 Lintels, Plinth beams, girders, cantilevers etc.
5.9.6 Column pillar post pire abutment, post and struts.
Providing and laying in position specified grade of R.C.C. Excluding cost of centering, shuttering up to P.L. 5.1.3 Prop. 1:2:4
Reinforcement R.C.C. works column, pillar, pire, etc. upto floor v (five) level, excluding cost of centering, shuttering and reinforcement. 5.2.2 Prop. 1:1.5:3
Half brick masonry with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. 6.13.2 Cement mortar 1:4.
15mm thick cement plaster in single coat on rough side of single or half brick wall 13.5.1 1:4. (1 Cement: 4 Coarse sand)
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25mm made of G.I. wire of dia 3mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. 13.43.1 Water thinnable cement primer.
Finishing wall with water proofing cement paint of approved brand and manufacture of required shade. 13.44.1 New work (Two or more coat @ 3.84 Kg/10m2
2. CONSTRUCTION OF IRON GATE : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. 2.8.1 All kinds of soil
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete: 16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Providing and laying in position cement concrete of specified grade all works upto plinth. A) In prop. 1:3:6
Steel reinforcement for R.C.C work including straightening, leaning, cutting, bending to proper shape placing in position and binding upto plinth level. 5.22.6 TMT bar Fe500D or more
Centering and shuttering including strutting, propping etc. end removal of the same…..5.9.1. Foundation Footing, base of column etc. for mass concrete.
5.9.6 Column pillar post pire abutment, post and struts.
Providing and laying in position specified grade of R.C.C. Excluding cost of centering, shuttering up to P.L.
Reinforcement R.C.C. works column, pillar, pire, etc. upto floor v (five) level, excluding cost of centering, shuttering and reinforcement. 5.2.2 Prop. 1:1.5:3
15mm thick cement plaster in single coat on rough side of single or half brick wall 13.5.1 1:4. (1 Cement: 4 Coarse sand)
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. 13.43.1 Water thinnable cement primer.
Finishing wall with water proofing cement paint of approved brand and manufacture of required shade. 13.44.1 New work (Two or more coat @ 3.84 Kg/10m2
13.50.3 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: 13.62.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 10.25.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
3. CONSTRUCTION OF SAMADHI SHED & UMBRELLA SHED : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. 2.8.1 All kinds of soil
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete: 16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 a) Brick flat soling.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level : 4.1.6 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.5 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : 5.9.1 Foundation, footings, bases of columns etc. for mass concrete.
5.9.5 Lintels, beams, Plinth beams, girders, bressumers and cantilevers etc.
5.9.6 Columns, pillars, Piers, abutments, posts and struts.
5.9.3 Suspended floors, roofs, landings, balconies and access platform.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level : 5.1.2 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) :3 graded stone aggregate 20mm).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm).
15mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 fine sand) b) In cement mortar 1:4.
Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).
Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacute, over the plastered wall surface to prepare the surface even and smooth complete.
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. 13.43.1 Water thinnable cement primer.
Finishing walls with textured exterior paint of required shade : 13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm
Crazy marble stone flooring, including filling the gaps with light shade pigment with white cement marble powder mixture (3 parts of white cement: 1 part of marble powder) by weight in proportion of 4:7 (4 cement marble powder mix: 7 white, black or white and black marble chips of sizes from 1mm to 4mm nominal size by volume) with under layer 25mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size), including rubbing, polishing and cement slurry etc. complete: 11.15.1 18mm thick crazy marble stone white, black or as specified.
4.CONSTRUCTION OF ICBP APPROACH ROAD & PLATFORM : Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. a) from Private land
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Construction of granular sub-base by providing close graded material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-charge. 16.78.1 with material conforming to Grade-I (size range 75mm to 0.075mm) having CBR Value-30
Supplying and stacking at site. 16.3.3 53mm to 22.4 mm size stone aggregate.
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, appplying and brooming requisite type of screening/binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level : 4.1.6 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20mm nominal size).
Centering shuttering including strutting etc. 5.9.1 Foundation footing, base of column.
Providing and laying factory made chamfered edge cement concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-charge. 16.91.2 80mm thick C.C. paver 30 grade with approved color design and pattern.
5. PARK EQUIPMENTS FOR KIDS & SITTING BENCHES : Roller Slide Supplying fitting and fixing of readymade Red PVC Roller Slide and ladder for outdoor Age Group 3 to 15 years including delivery charge etc.
Kids See-Saw Supplying fitting and fixing of readymade See-Saw including delivery charge etc.
Kids Swing Supplying fitting and fixing of readymade swing including delivery charge etc.
Sitting Concrete Bench Supplying fitting and fixing of readymade concrete colored 4 seater including delivery
6. BEAUTIFICATION & LANDSCAPING : Supplying and stacking of good earth at site including royalty and carriage upto 5km lead complete (Earth measured in stacks will be measured reduced 20% for payment).
Supplying and laying Neelgiri/maxican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level.
Providing circular cement concrete pots of specified size cast with C.C 1:2:4 2:30.1. Pot inside dia 30cm
Providing and displaying croton petra Banglore (Specimen) variety having 60cm to 70cm ht.
Providing and displaying of Areca Palm having ht 2.4m to 2.7m 12 to 14 sucker..
DHILAN BASUMATARY (BID ID -274255)
SRI BIBEKANANDA DEY (BID ID -274256)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .