| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 CrAccepted-AOC | ₹8.3 Cr | 1 | Accepted-AOC Being L1 bidder |
| 2 | 2₹8.5 Cr+₹23.3 L (2.80%)Rejected-Finance | ₹8.5 Cr+₹23.3 L (2.80%) | 2 | Rejected-Finance Not being L1 bidder |
| 3 | 3₹8.9 Cr+₹60.3 L (7.26%)Rejected-Finance | ₹8.9 Cr+₹60.3 L (7.26%) | 3 | Rejected-Finance Not being L1 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible due to non submission of GST status of JV |
Tender Value
₹8.7 Cr
EMD Value
₹10.9 L
Closing Date
28 Dec 2022, 5:00 pmClosed
GM(Civil) / Road and I/C
CCL HQ Ranchi
Construction of PQC coal transport road from coal stock of North Urimari to main road under North Urimari project, Barka-Sayal Area
2022_CCL_264180_1
GM(C)/Tender/2022-23/629 Dt. 05.12.2022
Open Tender
Civil Works - Roads
Item Rate
150 days
Barka-Sayal Area
Please refer tender documents
5 documents required · 5 mandatory
₹10.9 L
31 Mar 2023
6 Dec 2022
29 Dec 2022
7 Dec 2022
28 Dec 2022
7 Dec 2022
7 Dec 2022 - 21 Dec 2022
Amount
Part A (PQC Road, Length - 2400 Mtr.)
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) : for grading- II Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2). Rolling with vibratory roller
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
Part B (BOX Culvert)
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications: RCC Grade M25, With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications, RCC Grade M20, Using concrete mixer
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications
Part C ( RCC Drain, Length - 2400 Mtr.)
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications, RCC Grade M20, Using concrete mixer
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Total impact of GST for the purpose of CTC
M/S JMA-DIKSHIT CONSTRUCTION (JV)
M/S PCC AND SKS (JV)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .