| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹6.2 LRejected-AOC | ₹6.2 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | ABDUL RAHIMAN MASHOOD B I L1 | SUMAIS L2 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | OD196607/2024-2025:Chipping and removing old spalling/defective concrete and exposing the defective /corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded.Removel of the defective concrete across yhe bar should be at least 2 mm beyond the defective bar so that the reinforcing bar can be cleaned with emery ribbon,wire brush etc.After cleaning the bar wash the bar with clean water and collect all the spalled/fallen concrete.measurement is calculated for whole exposed area .Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 159.51 | sqm | 518.98 ₹82,782.50 | 596.4 ₹95,131.76 |
| 1.00 | OD196606/2024-2025:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat of nitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire
charges of tools etc complete. | 159.51 | sqm | 936.3 ₹1.5 L | 1,075.98 ₹1.7 L |
| 1.00 | OD196608/2024-2025:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc
complete. | 159.51 | sqm | 1,173.4 ₹1.9 L | 1,348.44 ₹2.2 L |
| 1.00 | OD196605/2024-2025:The Ceiling surface is to be smoothened with modified mortar to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges, conveyance of meterials to site hire charges of tools etc complete | 159.51 | sqm | 540.3 ₹86,183.25 | 620.9 ₹99,039.76 |
| 1.00 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | 198 | sqm | 167.27 ₹33,119.46 | 192.22 ₹38,059.56 |
| 1.01 | OD59928/2025-2026:Removing white or colour wash by scrapping and sand papering and praparing the surface smooth including necessary repairs to scratches etc.complete | 198 | sqm | 17.19 ₹3,403.62 | 19.75 ₹3,910.50 |
Tender Value
₹5.9 L
EMD Value
₹14,830
Closing Date
19 Mar 2026, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Building Subdivision, Koyilandy
Providing chemical treatment to spalling portion of concrete frame
2026_PWD_847509_1
PWD/2025-26/D1/BSDKYL/43
Open Tender
Civil Works - Buildings
180 days
Vatakara
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,310
Yes
₹14,830
Yes
6 Jun 2026
13 Mar 2026
21 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
Detailed Estimate
OD196607/2024-2025:Chipping and removing old spalling/defective concrete and exposing the defective /corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded.Removel of the defective concrete across yhe bar should be at least 2 mm beyond the defective bar so that the reinforcing bar can be cleaned with emery ribbon,wire brush etc.After cleaning the bar wash the bar with clean water and collect all the spalled/fallen concrete.measurement is calculated for whole exposed area .Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete.
OD196606/2024-2025:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat of nitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete.
OD196608/2024-2025:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete.
OD196605/2024-2025:The Ceiling surface is to be smoothened with modified mortar to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges, conveyance of meterials to site hire charges of tools etc complete
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
OD59928/2025-2026:Removing white or colour wash by scrapping and sand papering and praparing the surface smooth including necessary repairs to scratches etc.complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1432285.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1432285.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid