Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
16 Mar 2026, 11:00 amClosed
Executive Engineer
EE PWD Daporijo Division
Academic Bldg, 50 Bedded Hostel with Dinning, Type II Qrtrs
2026_PWDAP_3046_1
DD/NIT/EDN/2025-26/12
Open Tender
Civil Works - Building
Item Rate
730 days
Mara, Upper Subansiri District
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
EE PWD Division Daporijo
₹2.1 L
Daporijo
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH: Academic block | |||||
| 1.01 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead
of 50m. | 71.93 | Cum | - | - |
| 1.02 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 112.96 | Cum | - | - |
| 1.03 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 46.67 | Cum | - | - |
| 2SH:Concrete Works | |||||
| 2.01 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 46.32 | Cum | - | - |
| 3Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : | |||||
| 3.01 | a) Walls including attached buttresses, pilasters and their caps and bases and string
courses etc. up to floor two level. | 44.46 | Cum | - | - |
| 4Centring and shuttering including strutting proping etc. and removal of form work for: | |||||
| 4.01 | a) Foundation and Plith | 197.98 | Cum | - | - |
stage.html
html • 0.02 MB
finance_3245.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
TD.pdf
Tender Documents • 1.27 MB
BOQ_3245.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .