Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Technical | Admitted-Technical Qualified |
| 2 | Admitted-Technical | Admitted-Technical Qualified |
| 3 | Admitted-Technical | Admitted-Technical Qualified |
| 4 | Admitted-Technical KENDRAPARA ODISHA 754219 | KENDRAPARA | ODISHA | 754219 | Admitted-Technical Qualified |
| 5 | Admitted-Technical | Admitted-Technical Qualified |
Tender Value
₹26.6 L
EMD Value
₹26,605
Closing Date
17 Jun 2026, 5:00 pmClosed
Superintending Engineer, Drainage Division, Bdk
Office of the Superintending Engineer, Drainage Division, Salandi Bye-pass, Bhadrak.
Improvement works to Drainage Channels
2026_CEDC_130742_1
DDBDK-01-01/2026-27
National Competitive Bid
Civil Works - Others
Percentage
180 days
Tihidi, Chandabali Bhadrak
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹26,605
Yes
30 Jul 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
3 Jun 2026 - 9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures by manual means in all kinds of soil including stony earth and gravel in both wet and dry condition including shoring, shuttering, propping, bullah, dewatering the foundation, diverting the water away from the structure, dressing, leveling and ramming the foundation bed and sides with pneumatic tampers/ fuel- operated compactors as per the drawing and specification and removing the excavated materials with all leads, lifts and delifts with extra one lift etc. & depositing the excavated materials in the embankment with watering and disposing the excess materials in spoil bank or any other specified areas by manual means with all leads, lifts and delifts complete with all taxes (excluding GST), Labour charges, T&P, Labour Cess etc. complete including mobilization and demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer-in-Charge. | 0.6 | Per Cum | 282.9 | ₹169.46 |
| 2 | Filling foundation and plinth with sand in layers not exceeding 22.50 cm. thick watering and ramming with full compaction etc. complete in all leads, lifts & de-lifts with cost of all materials, labour cess, royalities, EMF, DMF and additional charges of all materials, T & P, labour charges, labour cess, etc complete (excluding GST) as per the direction of the Engineer-in-charge | - | Per Cum | 1,228.2 | - |
| 3 | Providing and laying cement concrete M-15 grade using 40mm and downgraded hard granite well graded crusher broken stone aggregates free from weathered skin surface and any other deleterious materials, using sharp sand of approved grading and quality conforming to the specifications, using water of approved quality and using cement as per approved specification with all leads. lifts, de-lifts and transportation by mechanical / manual means including cost, carriage, royalties, Labour cess and taxes (excluding GST) of all other materials including dewatering by suitable means with all cost, all materials using mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, supplying T&P, watering, curing for specified days by suitable means including cost and carriage of water, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings & specifications & direction of the Engineer-in-charge. | 1 | Per Cum | 6,434.7 | ₹6,428.27 |
| 4 | Providing rigid and smooth form works with F1 finish for Cement Concrete or RCC work & dismantling thereafter casting for all heights in all types of structures including pier, abutment, trough slab, road slab etc. complete using steel shutters efficiently propped and braced using required number of pylons for vertical support, scaffolding, gangway etc. complete and applying the finish for surfaces prominently exposed to public view or flow areas subjected to high velocity as per IS 457 and dismantling after allowing required support time and stacking the same for reuse including greasing, oiling etc. including cost, carriage and taxes (excluding GST) of all materials, labour and T&P and supervision charges complete as per approved design and direction of the Engineer-in-Charge. | 0.8 | Per Sqm | 954.1 | ₹763.28 |
| 5 | Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete including cost of spun pipes and collars of 600mm dia NP3 R.C.C. pipe including all cost, conveyance, royality and all other taxes (excluding G.S.T.) of materials to the site of the work and supplying all labour, T&P required for the work, labour cess etc complete and as per drawing & specification in all respect as directed by the Engineer-in-Charge. | - | Per Rmt | 3,138.7 | - |
| 6 | Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete including cost of spun pipes and collars of 900mm dia NP3 R.C.C. pipe including all cost, conveyance, royality and all other taxes (excluding G.S.T.) of materials to the site of the work and supplying all labour, T&P required for the work, labour cess etc complete and as per drawing & specification in all respect as directed by the Engineer-in-Charge. | - | Per Rmt | 5,969.6 | - |
| 7 | Filling foundation and plinth with excavated materials in layers not exceeding 22.50 cm. thick watering and ramming with full compaction etc. complete in all leads, lifts & de-lifts with cost of all materials, labour cess, T & P, labour charges, etc complete (excluding GST) as per the direction of the Engineer-in-charge. | - | Per Cum | 157.2 | - |
| 8 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete including cost of labourers, hire charges of machineries, royalities of all materials, T & P materials, etc as per the direction of Engineer-in charge. (measurement of the fill to be taken on the finished compacted level section.) | 1 | Per Cum | 108 | ₹107.89 |
| 9 | Clearance of weeds, ipimia, water hyacinth (thicky grown) from the drainage channel and dumping the clerance materials away from the drainage area with all leads, lifts and delifts T&P etc. complete with all cost incidental to the work as per specification and direction of the Engineer-in-Charge. | 0.29 | Per Sqm | 3.25 | ₹0.94 |
| 10 | Excavation of canal / drain in both wet & dry condition by mechanical means in all kinds of soil including stoney earth, gravel, morrum etc. inter spread with boulders up to 1/2cum size with all lead, lifts and delifts including trimming the slopes and bed to design section and depositing the excavated materials away from worksite in banks, spoil bank and any other area beyond berm of the drain to be arranged by the Agency at his own cost & responsibility including levelling and rough dressing with all leads, lifts, delift, handling, rehandling etc. complete with all taxes (excluding GST), Labour Cess, T&P etc. including mobilization and 'demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer-in-Charge [Measurement will be made as per finished level section.]. | 1 | Per Cum | 35.6 | ₹35.56 |
stage.html
html • 0.10 MB
tech_eval.pdf
finance_594165.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.06 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
DTCN01.pdf
Tender Documents • 9.29 MB
BOQ_594165.xls
BOQ • 0.40 MB
1stCorrigendum.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .