Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC V P O KOTLA KALAN TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹2.3 L Quoted ₹2.5 L | 1 | Accepted-AOC Accept |
| 2 | 2₹2.6 L+₹7,765 (3.10%)Rejected-AOC AT GROUND FLOOR MAIN BAZAAR MEHRE TEHSIL BARSAR DISTT HAMIRPUR H P PIN CODE 174305 | HAMIRPUR | HIMACHAL PRADESH | 174305 | ₹2.6 L+₹7,765 (3.10%) | 2 | Rejected-AOC Reject |
| 3 | 3₹2.7 L+₹22,027 (8.79%)Rejected-AOC | ₹2.7 L+₹22,027 (8.79%) | 3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | RAVI KUMAR L2 | Balwant Kumar L1 | VIKASH RANA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick work as per direction and to the entire satisfaction of Engineer-in-Charge. | 26.88 | Cum | 400 ₹10,752 | 380 ₹10,214.4 Lowest | 450 ₹12,096 |
| 2.00 | Excavation in earth work and disposal of excavated earth upto a lead 20 mtrs and lift upto 1.50 mtrs, disposal earth to be levelled and neatly dressed in pick/jumper work complete with in all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 10.05 | Cum | 450 ₹4,522.5 | 425 ₹4,271.25 Lowest | 500 ₹5,025 |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish Including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:- | ||||||
| 3.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge | 32.13 | Sqmt | 475 ₹15,261.75 | 450 ₹14,458.5 Lowest | 500 ₹16,065 |
| 4.00Providing and laying in retaining wall and breast wall 10.0 kgf/cm working pressure unplasticized P.V.C Pipes (Conforming to IS: 4985-1968) to make weep holes complete including making good the walls | ||||||
| 4.01 | 100 mm nominal bore | 32 | Each | 375 ₹12,000 | 350 ₹11,200 Lowest | 400 ₹12,800 |
| 5.00 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand: 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge. | 32.37 | Cum | 6,666 ₹2,15,778.42 | 6,500 ₹2,10,405 Lowest | 7,000 ₹2,26,590 |
Tender Value
₹2.7 L
EMD Value
₹5,330
Closing Date
20 Dec 2025, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Restoration of rain damages to various Flood protection work under JSV sub Division Dharampur Distt. Mandi HP
2025_HPIPH_123268_1
10710-10759 Dated 11-12-2025
Open Tender
Civil Works
Item Rate
90 days
Dharampur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer
₹5,330
8 May 2026
11 Dec 2025
22 Dec 2025
11 Dec 2025
20 Dec 2025
11 Dec 2025
Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick work as per direction and to the entire satisfaction of Engineer-in-Charge.
Excavation in earth work and disposal of excavated earth upto a lead 20 mtrs and lift upto 1.50 mtrs, disposal earth to be levelled and neatly dressed in pick/jumper work complete with in all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge.
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge
100 mm nominal bore
Providing and laying cement concrete 1:5:10 (1 cement :5 sand: 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Form6.pdf
Tender Documents • 0.81 MB
Form8.pdf
Tender Documents • 1.28 MB
TC.pdf
Tender Documents • 0.13 MB
BOQ_181083.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .