| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹51.0 L+₹95,750 (1.92%)Rejected-Finance GANAKPARA CITY TOWN UDALGURI P O BHOLABARI P S KALAIGAON DIST UDALGURI ASSAM PIN 784525 | DARRANG | ASSAM | 784525 | L2 | Rejected-Finance L2 | |
| 3 | L3₹51.1 L+₹1.1 L (2.18%)Rejected-Finance TANGLA UDALGURI ASSAM | UDALGURI | ASSAM | 784113 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Pabitra Boro L3 | TORALI KHAKLARI L1 | LANKESWAR RABHA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cicil work:
Earth work in exeavatiom by mechanieal means (Hydraulie excavator) / marual rmeans in loundation trenches or drains (not exceecding Is m in width or 10 sqm on plan), including dressing of sides and running of bottoms, lift upto 1.5 m, including gctting out the cxcavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. | 128.03 | Cum | 300 ₹38,409 | 286 ₹36,616.58 Lowest | 300 ₹38,409 |
| 2.00 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
With common burnt clay E.P.S.(non modular) bricks of class designation7.5 | 220.2 | Sqm | 610 ₹1,34,322 | 607 ₹1,33,661.4 Lowest | 607 ₹1,33,661.4 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level(I Cement; 3 coarse sand
(zone-Il):6 graded stone aggregate 20 mm nominal size) | 12.71 | Cum | 7,000 ₹88,970 | 6,833 ₹86,847.43 Lowest | 7,000 ₹88,970 |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all conplete upto plinth level. 5.22.6 Thermo Mechanically Treated bars of grace Fe-500D or more. | 2,805.38 | Kg | 95 ₹2,66,511.1 | 90 ₹2,52,484.2 Lowest | 95 ₹2,66,511.1 |
| 5.00 | Steel reinforcement for R.CC. work includiny straightening, cutting, bending, placing 5.22 A in position and binding all complete above plinth levei. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe 500D or more | 7,433.45 | Kg | 95 ₹7,06,177.75 | 90 ₹6,69,010.5 Lowest | 95 ₹7,06,177.75 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing 5 22A in position and binding all complete above plinth level. 5.22A.I Mild steel and Medium Tensile steel bars | 74.42 | Kg | 95 ₹7,069.9 | 90 ₹6,697.8 Lowest | 95 ₹7,069.9 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc for mass concrete | 77.28 | Sqm | 307 ₹23,724.96 Lowest | 307 ₹23,724.96 Lowest | 307 ₹23,724.96 Lowest |
| 8.00 | Columns, Pillars, Piers, Abutments. Posts and Struts | 88.92 | Sqm | 800 ₹71,136 Lowest | 800 ₹71,136 Lowest | 800 ₹71,136 Lowest |
| 9.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 148.97 | Cum | 600 ₹89,382 Lowest | 600 ₹89,382 Lowest | 600 ₹89,382 Lowest |
| 10.00 | Suspended floors, roofs, landings, balconies and access platlorm | 170.69 | Sqm | 750 ₹1,28,017.5 Lowest | 750 ₹1,28,017.5 Lowest | 750 ₹1,28,017.5 Lowest |
Tender Value
₹50.0 L
EMD Value
₹99,985
Closing Date
21 Feb 2026, 1:00 pmClosed
S.E. PWD, Kokrajhar Building Circle, Kokrajhar
O/o S.E. PWD, Kokrajhar Building Circle, Kokrajhar
Construction of Guest House at Bengbari Udalguri for the Financial Year 2025-2026. TN-36-1.
2026_BoTC_50737_1
TECH-36/SE(B)/IFB/2024-25/85
Open Tender
Civil Works - Building
Works
365 days
Udalguri
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,500
₹99,985
Yes
16 Oct 2026
3 Feb 2026
23 Feb 2026
3 Feb 2026
21 Feb 2026
3 Feb 2026
3 Feb 2026 - 21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cicil work:
Earth work in exeavatiom by mechanieal means (Hydraulie excavator) / marual rmeans in loundation trenches or drains (not exceecding Is m in width or 10 sqm on plan), including dressing of sides and running of bottoms, lift upto 1.5 m, including gctting out the cxcavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. | 128.03 | Cum | - | - |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
With common burnt clay E.P.S.(non modular) bricks of class designation7.5 | 220.2 | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level(I Cement; 3 coarse sand
(zone-Il):6 graded stone aggregate 20 mm nominal size) | 12.71 | Cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all conplete upto plinth level. 5.22.6 Thermo Mechanically Treated bars of grace Fe-500D or more. | 2,805.38 | Kg | - | - |
| 5 | Steel reinforcement for R.CC. work includiny straightening, cutting, bending, placing 5.22 A in position and binding all complete above plinth levei. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe 500D or more | 7,433.45 | Kg | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing 5 22A in position and binding all complete above plinth level. 5.22A.I Mild steel and Medium Tensile steel bars | 74.42 | Kg | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc for mass concrete | 77.28 | Sqm | - | - |
| 8 | Columns, Pillars, Piers, Abutments. Posts and Struts | 88.92 | Sqm | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 148.97 | Cum | - | - |
| 10 | Suspended floors, roofs, landings, balconies and access platlorm | 170.69 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
FOB361.pdf
Additional Documents • 0.53 MB
SBD361.pdf
Tender Documents • 1.78 MB
BOQ_80740.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .