| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.3 LAccepted-AOC | L1 | Accepted-AOC Agreement executed |
Tender Value
₹65.8 L
EMD Value
₹50,000
Closing Date
28 Feb 2026, 4:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Roads Centre Circle Aluva
Earth work excavation and concrete works for drain and culvert work, prime coat,tack coat, RCC 1 2 4 using 20mm broken stone ,20 mm Premixed chipping carpet
2026_PWD_832441_2
07/SECCA/2025-26
Open Tender
Civil Works - Roads
Percentage
120 days
Thodupuzha Kanjar Elaveezhapoonchira
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
10 Aug 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
28 Feb 2026
20 Feb 2026
19 Feb 2026 - 28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | RCC 1:2:4 using 20mm (Normal size) broken stone for top belt concrete of retaining wall including cost and conveyance of all materials ,form work,labour charges ,maxing placing ,watering curing and all incidential charges etc. | 32,724 | 10 dm3 | 81.35 | ₹26,62,097.4 |
| 2 | Supplying and fixing of RCC 1:2:4 guard stone of size 20x20x80 cm fixing in position including earth work excavation of 45x45x45 cm pit all cost of material and labour charges but excluding cost of reinforcement etc complete | 48 | each | 262.42 | ₹12,596.16 |
| 3 | Earth work in excavation in all classes of soil (except in hard rock and medium rock which requires blasting ) | 483.4 | 10 m3 | 2,605.54 | ₹12,59,518.04 |
| 4 | Cement concrete 1:4:8 using 40 mm (Normal size) hard granite broken stone for founadation of culverts and drain etc. | 70 | m3 | 5,413.46 | ₹3,78,942.2 |
| 5 | Cement concrete 1:3:6 using graded metal 60% 40mm and 40% 20mm metal for abutment wings and parapet of culvert (1mx1m) including all cost and conveyance | 28.47 | m3 | 6,878.33 | ₹1,95,826.06 |
| 6 | Cement concrete of 1:1.5:3 using 20mm B.S including cost, conveyance etc. complete as per specificatiion. | 11,295 | 10dm3 | 114.44 | ₹12,92,599.8 |
| 7 | Providing reinforcement (TMT Steel)for RCC work bent tied and placed in position (plain grill requiring bending cold)including cost,conveyance,labour charges | 1 | qtl | 6,974.21 | ₹6,967.24 |
| 8 | Cement concrete 1:3:6 using graded metal 60% 40mm and 40% 20mm metal for abutment wings and parapet of culvert (1.5mx1.5m) including all cost and conveyance | 0.4 | m3 | 6,737.71 | ₹2,688.35 |
| 9 | Supplying and stacking 36 mm hard granite broken stone in standard heaps for measurements along road side | 76.16 | m3 | 1,879.81 | ₹1,43,166.33 |
| 10 | Supplying and stacking 12 mm hard granite broken stone in standard heaps for measurements along road side | - | m3 | 2,222.6 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
sbd.pdf
Other Document • 2.76 MB
BOQ_1411813.xls
BOQ • 0.28 MB
nitelav.pdf
Tender Documents • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .