Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC KERALA KL KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.0 L+₹43,099.07 (3.18%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.0 L+₹43,100.31 (3.18%)Rejected-AOC 1003 SUB TREASURY DEVIKULAM | L3 | Rejected-AOC L3 | |
| 4 | L4₹15.5 L+₹1.9 L (14.4%)Rejected-AOC 17 01 DISTRICT TREASURY THAMARASSERY | KOZHIKODE | KERALA | 612906 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | VK BALAN L1 | P.Sugunan L2 | RAJAN L3 | JIMMI DAVID L4 |
|---|---|---|---|---|---|---|---|
| 1.00Road Work | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 34.53 | cum | 192.14 ₹6,633.83 Lowest | 250 ₹8,631.5 | 198.25 ₹6,844.78 | 220 ₹7,595.72 |
| 1.00 | OD14086/2025-2026:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in
layers, leveling the top at site and consolidation by ramming, etc complete for improving the
CBR value of subgrade | 34.53 | cum | 736.02 ₹25,411.83 Lowest | 950 ₹32,799.7 | 759.54 ₹26,223.88 | 842 ₹29,070.89 |
| 2.00Road protection work | |||||||
| 2.00 | 4.1.A.2:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-II - Plant Mix Method | 1.65 | cum | 2,862.73 ₹4,723.5 Lowest | 2,900 ₹4,785 | 2,951.06 ₹4,869.25 | 3,273 ₹5,400.45 |
| 2.00 | 13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m | 2.48 | cum | 6,718.03 ₹16,627.12 Lowest | 7,800 ₹19,305 | 6,931.49 ₹17,155.44 | 7,682 ₹19,012.95 |
| 3.00canal lining | |||||||
| 3.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 432.6 | sqm | 6.91 ₹2,989.27 Lowest | 7 ₹3,028.2 | 7.14 ₹3,088.76 | 7.9 ₹3,417.54 |
| 3.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 21.14 | cum | 1,159.34 ₹24,508.45 | 1,000 ₹21,140 Lowest | 1,196.18 ₹25,287.25 | 1,326 ₹28,031.64 |
| 3.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 32.2 | cum | 1,877.21 ₹60,446.16 | 1,500 ₹48,300 Lowest | 1,936.86 ₹62,366.89 | 2,147 ₹69,133.4 |
Tender Value
₹16.7 L
EMD Value
₹41,754
Closing Date
22 Aug 2025, 6:55 pmClosed
O/ O Executive Engineer KyIP Division Perambra
O/ O Executive Engineer KyIP Division Perambra
Rectification of canal
2025_Irrig_786358_1
IRR/PI/TR/4128/2025_5_5_4/1
Open Tender
Civil Works - Canal
Item Rate
180 days
cheekkilode
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹41,754
Yes
28 Oct 2025
14 Aug 2025
25 Aug 2025
14 Aug 2025
22 Aug 2025
14 Aug 2025
14 Aug 2025 - 22 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1292860.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .