| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L Quoted ₹4.5 L | L1 | Accepted-AOC Award |
| 2 | L2₹4.7 LRejected-Finance VILLAGE PO BAROHAKRI TEHSIL NIHRI DISTT MAND HP | MANDI | HIMACHAL PRADESH | 175001 | ₹4.7 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹4.8 LRejected-Finance | ₹4.8 L | L3 | Rejected-Finance Other than Lowest |
| 4 | L4₹5.8 LRejected-Finance R O VILL P O SAROG TEHSIL THEOG DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹5.8 L | L4 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | Sudanshu Sood L2 | PARKASH CHAND L4 | Munish Dwivedi L1 | SHAILJA SOOD L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations trenches etc in all kinds of soil such as pick jumper work blasting and chiselling soft / hard rock where blasting is prohibited in all leads and lifts i/c trimming & dressing of side levelling of bed stacking the excavated soil in 15 Cm layers when required in to Plinth sides of foundations etc including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting timbering & dewatering where ever required complete in all respect as per the direction & to the entire satisfaction of Engineer in Charge in all leads and lifts. | 9.79 | cum | 390 ₹3,818.10 | 500 ₹4,895 | 360 ₹3,524.40 | 410 ₹4,013.90 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in foundation and plinth in all leads and lifts. | 2.17 | Cum | 6,700 ₹14,539 | 8,500 ₹18,445 | 6,400 ₹13,888 | 6,800 ₹14,756 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement 1:5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 0.89 | Cum | 7,050 ₹6,274.50 | 9,500 ₹8,455 | 7,000 ₹6,230 | 7,150 ₹6,363.50 |
| 4.00 | Centering and shuttering including struttring, propping etc. and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts. | 1.28 | Sqm | 615 ₹787.20 | 350 ₹448 | 550 ₹704 | 650 ₹832 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts. | 36 | Sqm. | 425 ₹15,300 | 400 ₹14,400 | 400 ₹14,400 | 450 ₹16,200 |
| 6.00 | Centering and shuttering including strutting. propping etc. and removal of form for all heights: Edges of slabs and breaks in floors and walls under 20 cm wide in all leads and lifts. | 12.8 | Rmt. | 180 ₹2,304 | 405 ₹5,184 | 130 ₹1,664 | 190 ₹2,432 |
| 7.00 | Coursed rubble masonry ( First or second sort) with hard stone in Super Structure above Plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) in all leads and lifts. | 31.36 | Cum | 8,850 ₹2.8 L | 11,000 ₹3.4 L | 8,800 ₹2.8 L | 9,000 ₹2.8 L |
| 8.00 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) in all leads and lifts. | 22.4 | Sqm | 400 ₹8,960 | 250 ₹5,600 | 300 ₹6,720 | 410 ₹9,184 |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering. huttering, fir ishing and reinforcement 1:1.5:3 (1) cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 7.02 | Cum | 8,200 ₹57,564 | 14,000 ₹98,280 | 8,200 ₹57,564 | 8,400 ₹58,968 |
| 10.00 | Reinforced cement concrete work in beams. suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of entering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand) :3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 0.95 | Cum | 9,000 ₹8,550 | 13,500 ₹12,825 | 8,500 ₹8,075 | 9,100 ₹8,645 |
Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
19 Jan 2026, 10:00 amClosed
Executive Engineer
EE JSV Mandi
C/O Stone Masonry Manhole Chamber 2 Nos and C/O RCC Pillar 4 Nos at Jail Road
2026_HPIPH_125423_1
16380-479
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹9,700
19 Mar 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
Excavation in foundations trenches etc in all kinds of soil such as pick jumper work blasting and chiselling soft / hard rock where blasting is prohibited in all leads and lifts i/c trimming & dressing of side levelling of bed stacking the excavated soil in 15 Cm layers when required in to Plinth sides of foundations etc including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting timbering & dewatering where ever required complete in all respect as per the direction & to the entire satisfaction of Engineer in Charge in all leads and lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in foundation and plinth in all leads and lifts.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement 1:5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Centering and shuttering including struttring, propping etc. and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts.
Centering and shuttering including strutting. propping etc. and removal of form for all heights: Edges of slabs and breaks in floors and walls under 20 cm wide in all leads and lifts.
Coursed rubble masonry ( First or second sort) with hard stone in Super Structure above Plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) in all leads and lifts.
15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering. huttering, fir ishing and reinforcement 1:1.5:3 (1) cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Reinforced cement concrete work in beams. suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of entering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand) :3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts.
Fixing of Precast SFRC Manhole Cover with Frame conforming to IS-12592 (Part -1)-1998 with latest ammendments 560 mm dia in all leads and lifts.i) Medium Duty
Please Enable Macros to View BoQ information
Terms and conditions
The work should be executed as per PWD/JSV specifications and to the entire satisfactions of the Engineer-in Charge.
The cement and steel shall be issued by the department from JSV Divisional Store Raghunath Ka Padhar Mandi cement @ 368/- per bag, Steel Rs. 7615/-only per qtl.
The Contractor will be fully responsible for watch and ward of material at site of work.
Nothing shall be paid for rejected/sub-standard material at site of works.
Concrete work shall be done by using vibrator and concrete mixing plant.
Crushed aggregate will be used in concrete work.
Material should be used of approved quarry.
Precast SFRC Manhole cover will be issued to the Contractor by the Department from Divisional Store Raghunath Ka Padhar.
The work should be completed within the stipulated period.
The rates Should be inclusive with GST and carriage
1% labour cess will be deducted from the bill of the contractor.
GST as applicable will be borne by the contractor.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form6.pdf
Tender Documents • 0.58 MB
Form8.pdf
Tender Documents • 1.23 MB
BOQ_184723.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid