Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹54.4 L+₹1.1 L (2.06%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹55.6 L+₹2.3 L (4.40%)Rejected-Finance ELARAMPIDI HOUSE KIZHAKKUMURI P O KAKKODI VIA KOZHIKODE 673611 | KOZHIKODE | KOZHIKODE | KERALA | 673611 | L3 | Rejected-Finance L3 | |
| 4 | L4₹56.3 L+₹3.0 L (5.58%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹57.1 L+₹3.8 L (7.12%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹59.2 L
EMD Value
₹50,000
Closing Date
7 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of The Executive Engineer Harbour Engineering Division Kozhikode,Puthiyanirathu, Elathur PO, Kozhikode 673 303
Upgradation of Coastal roads in Kozhikode District - Improvements to the Chelannur - Kachira bund - Varampoyil road in Chelannur Panchayath.
2020_HED_374125_1
HED/EE/05/2020-21e-T/s
Open Tender
Civil Works - Roads
Item Rate
240 days
Chelannur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,975
Yes
online
₹50,000
Yes
20 Sept 2021
29 Jul 2020
13 Aug 2020
29 Jul 2020
7 Aug 2020
29 Jul 2020
29 Jul 2020 - 3 Aug 2020
60 days
Amount
Road work
2.2.1.A : Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(I)By Manual Means (A)In area of non-thorny jungle
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
10.5 : Painting Two Coats on New Concrete SurfacesPainting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701
6.7.1 : Interlocking Concrete Block Pavement <br> Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.
Dry rubble masonry
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.9 : RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
od5210/2019_2020 : Providing and laying 60mm dia reinforcement cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but exuding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause No. 1106
50.10.1 : Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
ANJANA CONSTRUCTIONS
SUNIL E
biju p v
BALAKRISHNAN P V
Bidder Name
ANJANA CONSTRUCTIONS
M GIRISH
SUNIL E
biju p v
BALAKRISHNAN P V
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_529899.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .