| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC 195 SREENAGAR 01 NO MADHYAMGRAM KOLKATA 700129 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700129 | ₹4.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 LRejected-AOC | ₹4.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹4.3 LRejected-AOC VILL DIGHAPARA P O BARAJAGULI DIST NADIA W B PIN 741221 | BARAJAGULI | NADIA | WEST BENGAL | 741221 | ₹4.3 L | L3 | Rejected-AOC L3 |
Tender Value
₹4.2 L
EMD Value
₹8,369
Closing Date
29 Nov 2025, 5:30 pmClosed
Haringhata Chairman
Haringhata Municipality, Subarnapur, Nadia
Development of Land at Adhibashi Para near H/O. Durga Mondal and Guest House , at Booth No.-184, Under Ward no-14, Scheme Id -APAS/01/093/184/0001 under Haringhata Municipality.
2025_MAD_942256_11
WBMAD/ULB/HM/NIT-31e/2025-26
Open Tender
CIVIL WORKS
45 days
Haringhata
Refer in Tender Documents.
4 documents required · 4 mandatory
₹0
₹8,369
Yes
7 Apr 2026
8 Nov 2025
2 Dec 2025
8 Nov 2025
29 Nov 2025
8 Nov 2025
Page no- 1 & Item no- 2 (a) (P.W.D Builing) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Page no- 34 & Item no- 22(1)(a) (P.W.D Building) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] (a) 1:3:6 proportion
Page no- 1 & Item no- 3 (a) (P.W.D Building) Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Page no -2 & Item no - 4 (a) (A)Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturationwith water, rammingcompleteincludingthecostofsupply of sand. (payment to bemade onmeasurement of finished quantity)
Page no -104 & Item no - 13 (a) (a) M.S.or W.I. Ornamental grill of approved design joints continuouslyweldedwithM.S, W.I. Flats and bars of windows, railingetc. fitted and fixed with necessary screws and lugsin ground floor. (Addextra@1%foreachaddl. [email protected]% for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
Page no -15 & Item no - 08 (a) Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
Page no -15 & Item no - 08 (a) Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor
Page-47 It.No-1 25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [withgraded stoneaggregate 10mm nominal ize]andadmixtureofwaterproofingcompoundas per manufacturer's specification followed by two coat of polymerbasedpaint, (1st coat after4 to5daysof concrete laying and 2 nd coat just before brickmasonrywork) as directed (costofwater proofing compound &polymerbased paint tobepaidseparately).(Chequeringnot requiredover concrete or painted surface). [Note:-Water proofing asperitem9, polymerbasedpaintas per item 8 (a) of subhead C of Section (C).
Page no -42 & Item no - 36 a (P.W.D Building) Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Page no-47 & Item no -3 Supplying and laying PolytheneSheet (150gm/ sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Page no-48 & Item no -6 iii Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). (iii) 35 mm. thick
Page no -43 & Item no - 40 (P.W.D Building) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel (ii) JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL @ 1.00% of Volume of Concrete.
Page no-24 & Item no -4(a) Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20mm nominal size)excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Page no- 26 & Item no- 10 (i) (P.W.D Building) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Page-192, It.No-1 Labour for Chipping of concrete surface before taking up Plastering work.
Page-189/It.No-1 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (c) 10 mm thick plaster
Page-189/It.No-1 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 20 mm thick plaster
Page-189/It.No-1 PWD BLDG Schedule Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (b) 15 mm thick plaster
Page-192/It.No-15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
Page-196/It.No-10 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats Area is sum of item no.17 and item no.19
Page-200/It.No-2a (A)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (iv) Two coats (with any shade except white)
Page-200/It.No-1b (b)Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Page-200/It.No-1a a)Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Page-200/It.No-2(b)(iv) (A)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : (iv) Two coats (with any shade except white)
Page-196/It.No-08 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly,complete as per manufacturer's specification and as per direction of the EIC.In Ground Floor: (a) One Coat. Area same as outside plaster
Page-197/It.No-17 Protective and Decorative Acrylic exterior emulsion paint of approvedquality, as per manufacturer's specification and as per direction ofEngineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. Area same as outside plaster
Page-114/It.No-1(i) Wood work in door and window frame fitted and fixed in position completeincluding a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum shouldbe correted upto three decimals). (i) Other Local Wood
Page-117/It.No-1 Panel shutters of door and window, as per design (each panel consisting of singleplank without joint), including fitting and fixing the same in position butexcluding the cost of hinge and other fittings.In ground floor.(In case of non-supply of single plank, penal rate of reduction of 20% will bemade)i) 50mm thick shutters with 25mm thick panel of size 30 to 45 cm Other Local Wood
Page-140/It.No-5 Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with16mm dia rod with centre bolt and round fitting200mm long
Page-68, It.No-23(a) (S & P) Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 (A) (i) Single Socketed 3 Meter Length (a) 75 mm
Page no-2 & Item -5 PWD BUILDING Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (b) (i) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth.
ADD GST
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 17.72 MB
BOQ_2231917.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid