| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 Cr+₹21.9 L (5.98%)Rejected-Finance | ₹3.9 Cr+₹21.9 L (5.98%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.9 Cr+₹22.9 L (6.24%)Rejected-Finance | ₹3.9 Cr+₹22.9 L (6.24%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
28 Jul 2023, 5:00 pmClosed
SE
MGCCC MBD
Lot01
2023_UPIDC_816257_1
01/SE/2023-24
Open Tender
Civil Works - Bridges
Item Wise
180 days
Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹8.4 L
28 Jan 2024
28 Jun 2023
29 Jul 2023
28 Jun 2023
28 Jul 2023
28 Jun 2023
Amount
Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section
Dewatering Job by diesel Engine including cost of P.O.L. labour T&P etc for proper completion of work.
Laying Cement concrete in M-10 1:3:6 including all costs of T&P material required for proper completion of work.
Laying C.C. in M-15 1:2:4 in Toe wall Transitions sleepers lining etc. including all costs of T&P material required for proper completion of work.
Laying R.C.C. in M-25 1:1:2 in Raft wall bridge, wearing Coat etc. including all costs of T&P material required for proper completion of work.
Centering and shuttering for C.C. works including cost of all labour and T&P etc. complete.
Ordinary Centering and shuttering for R.C.C. works including cost of all labour and T&P etc. complete.
Centering and Shuttering for Special type of R.C.C. works including cost of all labour and T&P etc. complete.
Laying of reinforcement in R.C.C. including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete.
Providing & fixing 225 mm wide water stop seal in construction joints including cost of material , labour for laying ,T&P complete as per directed by Engineer in charge.
S/L Settlement Joint with G.P./ Copper/Stainless Steel water stop including cost of all labour and T&P etc. Complete.
S/L Expansion joint with MS. Angle thermocal sheet/ RM including material its fabrication and placing and fixing of bitumin soaked coir complete as per directed by Engineer in charge.
K K CONTRACTOR
MAA GAYATRI ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .