| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-AOC | ₹22.4 L | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹24.0 LRejected-Finance | ₹24.0 L | L2 | Rejected-Finance Second lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
Tender Value
₹22.9 L
EMD Value
₹50,000
Closing Date
7 Jan 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
PWD ROADS DIVISION IDUKKI PAINAVE
GENERAL-RM/ 2025-26 - RC 2 Phase 2 - Zone II - One year Running Contract for various PWD roads under Roads section Santhanpara Idukki District- 2 road stretches for alength of 12.04 km-RC Work-General Civil Work
2026_PWD_825044_1
71/EE/2025-26
Open Tender
Civil Works - Roads
365 days
SANTHANPARA
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
6 Feb 2026
1 Jan 2026
9 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
APPENDIX A: REACTIVE MAINTENANCE (INITIAL RECTIFICATION WORKS)
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD1565/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) or 13.2 mm to 0.09 mm (Type-B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD.Type-A :- By Manual Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
APPENDIX B: PRE MONSOON WORKS
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD1556/2025-2026:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge
OD1559/2025-2026:Engaging Small Tipper for Various works in roads as per the directions of Engineer in charge
OD1557/2025-2026:Engaging Backhoe loaders & excavators/Tracked Excavators for various works in roads as per the direction of Engineer in charge
OD1558/2025-2026:Supplying and stacking cold bituminous mix compound 25 kg cold mix bags an instant pothole filling mixture for repairs from authorized agencies as per indents, conveying and unloading carefully at stacking yard with out any damages and as per instruction of Engineer in charge including all incidental charges etc... complete
OD1561/2025-2026:Providing and fixing Vinyl sticker with 1 years warranty including lettering and Symbols for existing DLP board 0.90*0.61m size including painting all exposed surface with two coat of epoxy painting etc complete.
APPENDIX C:PROACTIVE/PREVENTIVE MAINTENANCE
OD1553/2025-2026:Supplying and stacking cold bituminous mix compound 25 kg cold mix bags an instant pothole filling mixture for repairs from authorized agencies as per indents, conveying and unloading carefully at stacking yard with out any damages and as per instruction of Engineer in charge including all incidental charges etc... complete
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD1555/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) or 13.2 mm to 0.09 mm (Type-B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD.Type-A :- By Manual Means
OD1552/2025-2026:Conducting and Reporting Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period for the Running Contract as directed by Engineer in charge
APPENDIX D:EMERGENCY WORKS
OD1563/2025-2026:Engaging coolie/labour for miscellaneous works
OD1562/2025-2026:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD1564/2025-2026:Engaging JCB for removal of Slipped earth , other obstructions in the PWD road including fuel charges, Bata of driver and other all expenditure including etc. complete
Please Enable Macros to View BoQ information
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1383479.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1383479.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid