Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC SHOP NO 1 154 1 G F BLDG KINARA WARD NO 2 SANGUEM GOA | ₹20.8 L | L1 | Accepted-AOC L1 offer |
| 2 | L2₹22.4 L+₹1.5 L (7.29%)Rejected-Finance 11 NO 366 2 ST ANN COLONY TIVIM BRADEZ GOA | ₹22.4 L+₹1.5 L (7.29%) | L2 | Rejected-Finance Second lowest bidder |
| 3 | L3₹23.4 L+₹2.6 L (12.5%)Rejected-Finance | ₹23.4 L+₹2.6 L (12.5%) | L3 | Rejected-Finance Third lowest bidder |
| 4 | L4₹24.4 L+₹3.6 L (17.1%)Rejected-Finance | ₹24.4 L+₹3.6 L (17.1%) | L4 | Rejected-Finance Fourth lowest bidder |
| 5 | L5₹24.6 L+₹3.8 L (18.3%)Rejected-Finance | ₹24.6 L+₹3.8 L (18.3%) | L5 | Rejected-Finance Fifth lowest bidder |
Tender Value
₹23.7 L
EMD Value
₹47,390
Closing Date
5 Jan 2023, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of retaining wall near Zeferino Pereira Alto Fondavem in ward No.30 at ribandar in Panaji Constituency
2022_WRD_6225_1
No.6-9/WDI/WRD/ASW/2022-23/e -09/Sr3
Open Tender
Miscellaneous Works
Item Rate
90 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹47,390
9 Mar 2023
9 Dec 2022
6 Jan 2023
9 Dec 2022
5 Jan 2023
9 Dec 2022
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge a) 110 mm dia
Transportation and Carriage of materials by tipper truck including loading unloading and stacking for lead a upto10km. ii) earth
M/S. S.A. CONSTRUCTION
Rajson Engineering Services Private Limited
abdul khadar
SHABNAM CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .