| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹399.3 CrAccepted-AOC 2 9 SUNITY CHATTERJEE PATH CITY CENTRE DURGAPUR 713216 | DURGAPUR | BURDWAN | WEST BENGAL | 713216 | ₹399.3 Cr | L1 | Accepted-AOC Lowest Rate offered |
| 2 | L2₹414.9 CrRejected-Finance | ₹414.9 Cr | L2 | Rejected-Finance Higher Rate offered |
| 3 | L3₹429.1 CrRejected-Finance D 1 1 GILLANDER HOUSE 8 N S ROAD KOLKATA 700 001 | KOLKATA | WEST BENGAL | 700001 | ₹429.1 Cr | L3 | Rejected-Finance Higher Rate offered |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical A 177 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110020 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹344.3 Cr
EMD Value
₹50 L
Closing Date
21 Feb 2026, 5:00 pmClosed
Addl. General Manager (Engg)-III
DHANA DHANYA AUDITORIUM ALIPORE KOLKATA
CONSTRUCTION OF MAHAKAL MAHATIRTHA IN MATIGARA, SILIGURI, DARJEELING.
2026_HIDCO_987936_1
HIDCO/AGM(E)III/MM/NIT22/25-26
Open Tender
CIVIL WORKS
Percentage
730 days
Siliguri
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹50 L
HIDCO BHABAN, 3rd floor, Conference Hall
6 Mar 2026
13 Jan 2026
23 Feb 2026
13 Jan 2026
21 Feb 2026
29 Jan 2026
27 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PILING WORK | - | - | - | - |
| 2 | BORING
Providing Bored Cast-in-situ M:30 grade R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete but excluding the cost of reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2)
(a) Using hydraulic piling rig
iv) Pile diameter - 600 mm.
The Rate of providing the temporary steel casing upto 3m depth is included. | 10,500 | Mtr. | 3,890.19 | ₹4,08,46,995 |
| 3 | (a) Using hydraulic piling rig
i) Pile diameter - 750 mm.
The Rate of providing the temporary steel casing upto 3m depth is included. | 525 | Mtr. | 5,809.68 | ₹30,50,082 |
| 4 | Providing MS casing pipe around RCC cast-in-situ bored piles of different diameters in position including cost of all materials, fabrication, handling etc. complete as per direction of Engineer-in-Charge. | - | MT | 56,592 | - |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | 270 | MT | 66,502 | ₹1,79,55,540 |
| 6 | Removal of mud/sludge/slurry/liquid earth obtained during piling work from the working site and disposal of the same beyond the KMC/Municipal or any suitable area with conformity of Municipal Corporation Rules using tanker including loading and unloading the same with pump, clearing the site complete in all respect as per direction of the Engineer-in-charge.
(c) For 600mm Pile | 10,500 | Mtr. | 38 | ₹3,99,000 |
| 7 | (d) For 750mm Pile | 525 | Mtr. | 56 | ₹29,400 |
| 8 | Performing Lateral load test on two piles or two groups of piles by introducing a hydraulic jack with gauge between two piles or pile groups under test by applying horizontal loads in increments of about 20% of the estimated safe load at each stage and applying the next increment after the rate of displacement is nearer to 0.1 mm. per 30 minutes till the total displacement becomes, 12 mm at the cutoff level including the cost of arranging the entire set-up, hire charges of all implements including at least two dial gauges, preparing the pile head if necessary, and removal of all arrangement after completion etc. complete in all respect including cost of carriage of all materials and as per IS specification and direction of Engineer-in-charge. | 3 | EA | 27,400 | ₹82,200 |
| 9 | Performing Vertical load test on single Pile in accordance with IS:2911(Part-IV) by hydraulic jacks on pile/piles with 1.5 times the design load including preparation of the head of piles with concrete of required strength for receiving the jacks with all ancillary arrangements for setting up gauges, construction of suitable platforms, keeping the loads and dismantling and removing all arrangement etc. complete as per IS specification and direction of Engineer-in-charge.
iii) Testing load between 150 T and 200 T.
N.B.
This item is applicable for both work pile and test pile. Test should be carried out as per IS 2911 part IV 1985. | 3 | EA | 89,600 | ₹2,68,800 |
| 10 | Integrity testing of Pile using Low Strain / Sonic Integrity Test / Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerized equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-incharge.
c) North Zone | 635 | EA | 1,160.8 | ₹7,37,108 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.47 MB
DRAWING.pdf
Tender Documents • 21.79 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.59 MB
2911_FORM.pdf
Tender Documents • 0.16 MB
DBR.pdf
Tender Documents • 16.58 MB
BOQ_2413331.xls
BOQ • 1.87 MB
TECHSPEC.pdf
Tender Documents • 5.32 MB
Special_Terms_and_Condition.pdf
Tender Documents • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].