Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6 L
Closing Date
1 Oct 2021, 6:00 pmClosed
Riico, Kota
Riico, Kota
Maintenance and up keeping of office building campus. IPIA Kota
2021_RIICO_242193_1
22/2021-22(4)
Open Tender
Civil Works
Percentage
730 days
Kota
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
RIICO Ltd
Exempted
7 Oct 2021
25 Sept 2021
6 Oct 2021
25 Sept 2021
1 Oct 2021
25 Sept 2021
Amount
Day to day maintenance of electric fitting, sanitary and water supply fitting Excluding material will be by done Contractor. This work also included Maintenance of Office garden filling of water tank in desert cooler filling of overhead tank Security arrangement of complete office campus in office time and during govt holidays. General maintenance work related to electrical, sanitary, wood work, paint work etc. will be done by contractor without material All the works shall be executed as per direction of engineer in charge Terms and Condition are as below1.The work for up keeping of office front Garden and Plants and back side garden lawn and plants etc includes watering cutting and maintenance of lawn plants done by contractor as per requirement regularly2.All the material Like Odonil Acid Phenol etc for sweeping cleaning of toilet and all the tools for sweeping, cleaning of toilet for up keeping of Garden Plants etc will be supplied by the contractor at his own cost.3.This work also includes regular cleaning of Toilets Rooms chambers septic tank water tanks in the office campus 4.Regular maintenance of A C fans desert coolers water cooler ducting system invertor false ceiling and all type of installed lights including rewinding of motors and cooler pumps etc without material will be done by contractor Material for above maintenance shall be supplied by RIICO5.In case of burnt motor the charge for repairing Without material lowering and unlowering of the submersible pump set will be borne by the contractor Winding charges Bush etc for submersible pump motor if any shall be borne by RIICO6.Contractor should arrange the water at his cost during shortage of water supply period if required. 7.Contractor is responsible for collecting Electric Water bill of RIICO Office and timely deposit of payment to KEDL JVVNL PHED office. If timely not deposited then penalty will be bear by contractor. 8.Contractor have the follow the minimum wages act and shall be responsible to pay the minimum labour charges Contractor shall be liable to pay PF ESI etc if any 9.Penalty of Rs. 1000 per day will imposed for any lapses in above duty10. Persons involed in each work Security person Gardener sweeper etc should be got approved by E I C
ROOP NARAYAN KHANDELWAL
M.K. ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .