Loading…
Loading…
Tender Value
₹13.0 L
EMD Value
₹26,000
Closing Date
14 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER , P.H. DIVISION, BHABHUA, KAIMUR
EE
P.H.E.D. OFFICE NEAR JAGJEEVAN STADIUM BHABHUA
MD NABI HASAN, SUPERINTENDING ENGINEER, SASARAM
SUPERINTENDING ENGINEER (SE)
NAME OF WORK:- Estimate of safe demolitioning of unserviceable RCC overhead Water tower (Capacity- 25000 Gallon) of the scheme PWS Sahdullapur under P.H Division, Bhabhua for the year 2026-27.
137574
NIT NO.- 08/2026-27/BHABHUA/GROUP-01
Open Tender
CIVIL
Kaimur (bhabua)
• Earnest Money.
• Registration Paper of PHED, Govt. of Bihar.
• GST registration in state of Bihar.
• Details of Tools & Plant (appropriate Elevated Crane, Tractor, Hammer machine and cutting equipment, cranes, safety belts, barricading materials etc. required for safe demolition. All equipment shall be in working condition. ownership papers/ lease agreement valid for the period of work)
• Affidavit from the noatary certifying that the bidders/ contractor has completed 80%/more than 80%/completed the work previously awarded to him within the P.H.E. Patna Zone, Patna & And regarding nither debar for including as the defaulter list
• Work Experience of Similar Nature
• Power of attorney / partnership deed/MOU of private limited company etc. if applicable.
• Valid Character Certificate of D.M./S.P.
• Details of Skilled/Technical staffs
• PAN Card
CIVIL
PERCENTAGE
L1
1
13 documents required · 13 mandatory
₹2,500
Processing Fee: 1180
₹26,000
8 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
Name of Work NAME OF WORK:- Estimate of safe demolitioning of unserviceable RCC overhead Water tower (Capacity- 25000 Gallon) of the scheme PWS Sahdullapur under P.H Division, Bhabhua for the year 2026-27. Cost of Work as per BOQ Time of Completion (in months) 02 Months
SI NO. Items Requirement
Name of the contractor
Address of the contractor
1 Earnest Money (A) As prescribed in Tender document duly pledged in Favour of Executive Engineer, P.H. Division, Bhabua 25972
Bid Security Amount - Bid Security Amount - Rs.
2 Registration No. of PHED, Govt. of Bihar. (Participation in one or more groups would be within the financial limits of the registration)
4 GST registration in state of Bihar
5 Details of Tools & Plant
6 Affidavit from the notary certifying that the bidders/ contractor has completed 80%/more than 80%/completed the work previously awarded to him within the P.H.E. Patna Zone, Patna.
7 Work experience of similar nature
8 Power of attorney / partnership deed/MOU of private limited company etc. if applicable.
9 Details of Skilled/Technical Staffs
10 Valid Character Certificate issued by DM/SP
11 Other as per NIT & Notes to Tenderer.
Executive Engineer,
P.H. Division, Bhabhua
NAME OF WORK:- Estimate of safe demolitioning of unserviceable RCC overhead Water tower (Capacity- 25000 Gallon) of the scheme PWS Sahdullapur under P.H Division, Bhabhua for the year 2026-27.
Date of Tender :- 07.08.2026
Estimated Cost:- ₹ 1,298,600.00
Earnest Money :- ₹ 26,000.00
Time of Completion :- 02 Month 25972 26000
Cost of BOQ :- 2500.00/- (Through online mode) & As per e-proc2 (Through online mode Processing Fee)
S. N. Particulars Qty. Unit Rate Amount
1 Demolition of over head Tank under the scheme PWS Sahdullapur as per direction of E/I. 1 Nos. Each Rs.1,298,600.00 Rs.1,298,600.00
Total = Rs.1,298,600.00
1 Estimated cost Rs. 1298600.00 (A)
2 Cost of Govt. Material :- NIL NIL (B)
3 Name of the Contractor :-
4 Address of the Contractor :-
5 I/we offer in Figures……. in words………………… % (Percentage) High / Less/Estimated cost. IN FIG.
Note :- Bidders has to quote rate in Percentage High/Less/Estimated Cost only.
Executive Engineer, P.H.Division, Bhabhua
Estimate of safe demolitioning of unserviceable RCC overhead Water tower (Capacity- 25000 Gallon) of the scheme PWS Sahdullapur under P.H Division, Bhabhua for the year 2026-27.
S.No. Description Qty. Unit Rate Amount
1 5.9 Centring and shuttering including strutting, propping etc. and removal of form for.
5.9.3- Suspended floors, roofs, landings, balcnies and access platform.- 3.14*12m*12m/4= 113.40 113.40 sqm 437.50 49,612.50
5.9.14- Extra for shuttering in circular work (20% of respective centring and shuttering items) 22.68 sqm 20.20 458.14
2 5.11 Extra for additional height in centering, shuttering wherever required with adequate bracing, propping etc. including cost of de-shutering and de centring at all levels over a height of 3.5 m ,for every additional height of 1 metre or part thereof (Plan area to be measured)
5.11.1-Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) -113.40*(21-3.5)= 1984.50 1984.5 sqm 174.00 345,303.00
3 15.3 Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material withing 50 metres lead:
top dome 3.14x1.35x8mx8mx0.20/4=13.565m3
top dome ring beam 3.14x8.5mx0.50mx0.50=6.67m3
vertical wall 3.14x8mx3.5mx0.20=17.584m3
bottom dome 3.14x1.35x6mx6mx0.20/4=7.63m3
bottom dome ring beam 3.14x8.5mx0.50mx0.50=6.67m3
conical ring beam 3.14x8.5mx0.50mx0.50=6.67m3
landing 3.14x9.5mx1.50mx0.15=6.71m3
vertical column 6nosx3.14x1.10mx1.10/4x21m=119.68m3
bracing 12 nosx3.5mx0.50mx0.25=5.25m3
Office room roof slab 3.14x8mx8mx0.15/4=7.536m
staircase landing slab4nosx 3mx2mx0.15=3.60m3
chhajja slab 4x0.6mx2mx0.15=0.72m3
parapet. 28x(1.25x.25mx.50m)/2=4.375 m3
4 15.5 Extra for cutting reinforcement bars in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) 341.52 per RCC 489.50 167,174.04
5 15.6 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. 14000 kg 3.90 54,600.00
6 15.7 Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 meters lead
7 15.58 Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum.Placing tipper at loading point, loadingwith front end loader, dumping, turning for return trip, excluding time for haulage and return trip 378.27 cum 195.10 73,800.48
8 15.58 Cost of Haulage Excluding Loading and Unloading.Haulage of materials by tipper excluding cost of loading, unloading and stacking. Qty= 378.27*2.5*5=4728.375 t-km 4728.38 t-km 11.20 52,957.80
9 15.12 Dismantiling doors windows and clerestory windows (steel or wood) shutters including chowkhats, architrage, holdfasts etc. complete and stacking within 50 metres lead:
15.12.1- Of area 3 sqm and below 3 each 151.80 455.40
15.12.1- Of area beyond 3 sqm 1 each 208.80 208.80
10 15.58 Providing sal ballah barricading with departmental sal ballah average 150 dia. And 2M long sal ballah post at interval of 2.5 M C/C fixed 0.5 M average below ground, packed with earth and Brick bats, well watered and rammed with three rows of average 100mm dia. Sal ballah horizontal runners fixed with iron spikes and wires, white washing one coat to exposed surface, dismantling the barricade after function, filling the holes, excluding carriage of sal ballah from and to godown up to 5K.M. lead, stacking them in countable stacks in godown including cost of all labour and materials and taxes all complete job as per specification and direction of E/l. 100 per m 215.30 21,530.00
11 113 Chowkidar 2 nos.(day/night) 60 days *2=120 120 per day 302.00 36,240.00
12 Less Scrap M.S Steel Contractors Property L.S rate-58.60*10%=5.860 14000 kg 5.86 82,040.00
Total after deduction of usable scrap materials Rs.1,232,524.15
Add GST @ 6% (multiplying factor = 1.0536) Rs.66,063.29
Grand Total Rs.1,298,587.00
Executive Engineer,
P.H. Division, Bhabua
NAME OF WORK:- Estimate of safe demolitioning of unserviceable RCC overhead Water tower (Capacity- 25000 Gallon) of the scheme PWS Sahdullapur under P.H Division, Bhabhua for the year 2026-27.
Date of Tender :- 07.08.2026
Estimated Cost:- ₹ 1,298,600.00
Earnest Money :- ₹ 26,000.00
Time of Completion :- 02 Month 25972 26000
Cost of BOQ :- 2500.00/- (Through online mode) & As per e-proc2 (Through online mode Processing Fee)
S. N. Particulars Qty. Unit Rate Amount
1 Demolition of over head Tank under the scheme PWS Sahdullapur as per direction of E/I. 1 Nos. Each Rs.1,298,600.00 Rs.1,298,600.00
Total = Rs.1,298,600.00
1 Estimated cost Rs. 1298600.00 (A)
2 Cost of Govt. Material :- NIL NIL (B)
3 Name of the Contractor :-
4 Address of the Contractor :-
5 I/we offer in Figures……. in words………………… % (Percentage) High / Less/Estimated cost. IN FIG.
Note :- Bidders has to quote rate in Percentage High/Less/Estimated Cost only.
Executive Engineer, P.H.Division, Bhabhua
Estimate of safe demolitioning of unserviceable RCC overhead Water tower (Capacity- 25000 Gallon) of the scheme PWS Sahdullapur under P.H Division, Bhabhua for the year 2026-27.
S.No. Description Qty. Unit Rate Amount
1 5.9 Centring and shuttering including strutting, propping etc. and removal of form for.
5.9.3- Suspended floors, roofs, landings, balcnies and access platform.- 3.14*12m*12m/4= 113.40 113.40 sqm 437.50 49,612.50
5.9.14- Extra for shuttering in circular work (20% of respective centring and shuttering items) 22.68 sqm 20.20 458.14
2 5.11 Extra for additional height in centering, shuttering wherever required with adequate bracing, propping etc. including cost of de-shutering and de centring at all levels over a height of 3.5 m ,for every additional height of 1 metre or part thereof (Plan area to be measured)
5.11.1-Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) -113.40*(21-3.5)= 1984.50 1984.5 sqm 174.00 345,303.00
3 15.3 Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material withing 50 metres lead:
top dome 3.14x1.35x8mx8mx0.20/4=13.565m3
top dome ring beam 3.14x8.5mx0.50mx0.50=6.67m3
vertical wall 3.14x8mx3.5mx0.20=17.584m3
bottom dome 3.14x1.35x6mx6mx0.20/4=7.63m3
bottom dome ring beam 3.14x8.5mx0.50mx0.50=6.67m3
conical ring beam 3.14x8.5mx0.50mx0.50=6.67m3
landing 3.14x9.5mx1.50mx0.15=6.71m3
vertical column 6nosx3.14x1.10mx1.10/4x21m=119.68m3
bracing 12 nosx3.5mx0.50mx0.25=5.25m3
Office room roof slab 3.14x8mx8mx0.15/4=7.536m
staircase landing slab4nosx 3mx2mx0.15=3.60m3
chhajja slab 4x0.6mx2mx0.15=0.72m3
parapet. 28x(1.25x.25mx.50m)/2=4.375 m3
4 15.5 Extra for cutting reinforcement bars in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) 341.52 per RCC 489.50 167,174.04
5 15.6 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. 14000 kg 3.90 54,600.00
6 15.7 Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 meters lead
7 15.58 Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum.Placing tipper at loading point, loadingwith front end loader, dumping, turning for return trip, excluding time for haulage and return trip 378.27 cum 195.10 73,800.48
8 15.58 Cost of Haulage Excluding Loading and Unloading.Haulage of materials by tipper excluding cost of loading, unloading and stacking. Qty= 378.27*2.5*5=4728.375 t-km 4728.38 t-km 11.20 52,957.80
9 15.12 Dismantiling doors windows and clerestory windows (steel or wood) shutters including chowkhats, architrage, holdfasts etc. complete and stacking within 50 metres lead:
15.12.1- Of area 3 sqm and below 3 each 151.80 455.40
15.12.1- Of area beyond 3 sqm 1 each 208.80 208.80
10 15.58 Providing sal ballah barricading with departmental sal ballah average 150 dia. And 2M long sal ballah post at interval of 2.5 M C/C fixed 0.5 M average below ground, packed with earth and Brick bats, well watered and rammed with three rows of average 100mm dia. Sal ballah horizontal runners fixed with iron spikes and wires, white washing one coat to exposed surface, dismantling the barricade after function, filling the holes, excluding carriage of sal ballah from and to godown up to 5K.M. lead, stacking them in countable stacks in godown including cost of all labour and materials and taxes all complete job as per specification and direction of E/l. 100 per m 215.30 21,530.00
11 113 Chowkidar 2 nos.(day/night) 60 days *2=120 120 per day 302.00 36,240.00
12 Less Scrap M.S Steel Contractors Property L.S rate-58.60*10%=5.860 14000 kg 5.86 82,040.00
Total after deduction of usable scrap materials Rs.1,232,524.15
Add GST @ 6% (multiplying factor = 1.0536) Rs.66,063.29
Grand Total Rs.1,298,587.00
Executive Engineer,
P.H. Division, Bhabua
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT.pdf
NIT • 1.26 MB
PAPER CUTTING.pdf
NIT • 0.60 MB
Technical Bid.xlsx
NIT • 0.04 MB
NIT DOCUMENT.pdf
NIT • 1.26 MB
NOTESTOTENDERFORSAFEDEMOLITIONING OF UNSERVICEABLE RCC WATER TOWER.docx
NIT • 0.02 MB
Financial Bid(B.O.Q).xlsx
NIT • 0.03 MB
Financial Bid(B.O.Q)-2.xlsx
NIT • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .