| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC Reasonable |
| 2 | L2₹8.8 L+₹48,604 (5.83%)Rejected-Finance | ₹8.8 L+₹48,604 (5.83%) | L2 | Rejected-Finance High Rate |
Tender Value
₹11.2 L
EMD Value
₹22,347
Closing Date
25 Jun 2026, 3:00 pmClosed
The Executive Engineer,BishalgarhDivision,PWD(RnB)
O/O Executive Engineer,BishalgarhDivision,PWD(RnB)
Mtc of different PWD road within Amtali PWD (RnB) Sub_Division during the year 2026_27_SH_Patch soling, palasiding, mtc of pucca drain, placing of gunny bags etc with other allied works
2026_CEPWD_73814_1
03_R_EE_BSLD_PWD_RnB_2026_27
Open Tender
Civil Works - Roads
Percentage
100 days
Amtali
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹22,347
12 Aug 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
18 Jun 2026 - 23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Flat Brick Soling
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | - | sqm | 603.9 | - |
| 0.0 | Surface Drains
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.
(I) Surface Drains in Ordinary Soil (A) Manual Means | - | mtr | 114.6 | - |
| 0.0 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per MoRD technical specification Clause 1907. | - | mtr | 4.6 | - |
| 0.0 | Maintenance of Earthen shoulder (stripping of excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MORD technical specification clause 1903. | - | sqm | 19.1 | - |
| 0.0 | Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903. | - | sqm | 46.3 | - |
| 0.0 | Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201. (I) By Manual Means
(A) In area of non-thorny jungle | 1 | Hec | 86,289.2 | ₹86,202.91 |
| 0.0 | A. Without dewatering.
Earth work in excavation for structure as per drawing and MoRD technical specification clause 305.1 in/c setting out construction of shoring & bracing removal setting out construction of shoring & bracing removal of stumps & other deleterious materials and disposal upto a lead of 50m dressing of sides & bottom and backfilling in trenches with excavated suitable materials.I) Ordinary soil. upto 3.0m depth. | - | cum | 458.2 | - |
| 0.0 | Filling in foundation trenches as per drawing & MoRD technical specification clause 305.3.9, 1200. I) Sand filling. | - | cum | 1,345.85 | - |
| 0.0 | Providing concrete for plain concrete(using jhama brick agg) in open foundation complete in/c form work as per drawing & MoRd technical speciification clause 802,803, 900,1202 and 1203 (in/c centering shutering staging etc but ex/c reinforcement .
I) PCC Grade M-10 (using jhama agg)
(i)Nominal mix 1:3:6 . | - | cum | 9,441.75 | - |
| 0.0 | Brick masonaryin cement mortar in foundation completed ex/c pointing plastering as per drawing & MoRD technical spcification clause 600, 1202 & 1203. (II) Brick masonary in 1:4 cement mortar. | - | cum | 9,753.95 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_75114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
Upload_DNIeT.pdf
Tender Documents • 2.63 MB
BOQ_75114.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .