Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAccepted-AOC | ₹7.6 Cr Quoted ₹15.2 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L1₹7.6 CrAccepted-AOC | ₹7.6 Cr Quoted ₹15.2 Cr | L1 | Accepted-AOC LOWEST |
| 3 | L2₹15.2 Cr+₹1.3 L (0.09%)Rejected-Finance | ₹15.2 Cr+₹1.3 L (0.09%) | L2 | Rejected-Finance L2 BIDDER |
| 4 | L3₹15.6 Cr+₹45.7 L (3.01%)Rejected-Finance | ₹15.6 Cr+₹45.7 L (3.01%) | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹14.7 Cr
EMD Value
₹10 L
Closing Date
29 Sept 2022, 5:00 pmClosed
SE EC
Office of the Superintending Engineer, Eastern Circle Postal Address - Jalasampad Bhawan, 8th Floor, Salt Lake, Kolkata-700091
Re-construction of Sundarban Embankment (for a length of 515.00 M.) In between ch. 1.00 km to ch. 1.20 km at Mouza - Mousuni, from ch.1.450 km to 1.765 km at Mouza Bagdanga along left bank of river Muriganga Block - Namkhana , P.S. - Frezerganj
2022_IWD_402849_6
WBIW/SE/EC/NIT-06(e)/2022-23
Open Tender
CIVIL WORKS
Percentage
480 days
Mouza - Mousuni
Please refer Tender documents.
4 documents required · 4 mandatory
₹10 L
Yes
O/O SE EC
3 Jul 2023
8 Sept 2022
11 Oct 2022
8 Sept 2022
29 Sept 2022
12 Sept 2022
12 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levelling as per direction ofthe Engineer-in-charge within a lead of, NB : Measurement to be taken on the basis of stack measurement/prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: The rate is inclusive for compensation for earth for land owned and arranged by the contractor add Rs. 25.00 per cum extra over rate of E/W for land owned /arranged by the Department . Royalty charges on earth @ Rs. 29.00 per cum & cesses charges @ Rs. 5.30 per cum (i.e., Rs. 15.00 per 100 cft.), as per Govt. notification , which will be paid on production of necessary documents in support of payment made towrds the royalties & Cesses. | |||||
| 1.01 | Beyond 500 metre and upto 1.00 km. | 1 | Cum. | 1 | ₹1 |
| 1.02 | Beyond 1.00 km. upto 2.00 km. | 0.8 | Cum. | - | - |
| 1.03 | Beyond 3.00 km. upto 4.00 km. | 0.8 | Cum. | - | - |
| 2 | Earthwork in making new embankment / ring bundh/ retired embankment by excavation of earth from borrow pits in all kinds of soil including making berms and depositing the same in layers not exceeding 25 cm. as per profile within an initial lead of 30 metre and lift of 1.5 metre including cost of nicking outlines, dug-belling, putting profiles, cutting and removing thick and thorny jungles, uprooting trees and stumps of all sizes upto 30 cm., girth from the site alignment as per direction of the Engineer in-Charge including dewatering, removal of weeds, carcasses, organic matter etc., if any, breaking clods, rough dressing, watering, ramming, compacting etc. complete.
(Work to be executed on section measurement by pre-work & post-work level section).
A) Where land for earth owned/arranged by the Department. | 1 | Cum. | 1 | ₹1 |
| 3 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | 1 | Cum. | 1 | ₹1 |
| 4 | Compacting earth work in embankment in layers of 25 cms. by power roller or by any other mechanical means, like tractor driven sheep foot roller/vibrating plate compactor earth rammer etc.( Not at OMC) including necessary watering, labour charges, hire charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as perdirection of the Engineer-in-charge.( Payment will be made on the basis of Pre-works & Post-work level). | 1 | Cum. | 1 | ₹1 |
| 5 | Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 metre as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete.
A) Upto depth not exceeding 1.5 M. | 1 | Hundred Cum. | 1 | ₹1 |
| 6 | Making filter with well graded 40 mm. down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm. depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer-in-Charge (measurements will be on finished work /in stack after deducting necessary void).
A) 1st. class Brick Ballast. | 1 | Cum. | 1 | ₹1 |
| 7 | Cast-in-situ cement concrete blocks or lining units as per designed size and specification, with well graded stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 m to act as a separator between the bottom surface of the block and the filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface with 1:3 cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6 mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of filter. (The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete).
A) With Stone aggregates (Pakur, North Bengal or Rajmahal varieties).
i) Nominal Mix 1:1.5:3 with 20 mm. down coarse aggregate. | 1 | Cum. | - | - |
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_791362.xls
BOQ Document • 0.32 MB
104864879.pdf
Tender Document • 1.56 MB
TF_2911.pdf
Tender Document • 1.86 MB
104864881.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .