Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC ANUGRAH H MANGOTTUPARAMBA PUTHIYANGADI EDAKKAD PO CALICUT 673005 | KOZHIKODE | KERALA | 673005 | ₹3.9 L | L1 | Accepted-AOC agreement executed |
| Sl No | Description | Qty | Unit | BRIJESH L1 |
|---|---|---|---|---|
| 1.00cutting tree branches | ||||
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 28 | each | 317.05 ₹8,877.4 Lowest |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 25 | each | 567.5 ₹14,187.5 Lowest |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 18 | each | 771.6 ₹13,888.8 Lowest |
| 1.00 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 61 | cum | 230.91 ₹14,085.51 Lowest |
| 1.00 | OD17983/2026-2027: Engaging labours for varios job like clearing sunshades, roof top,plumbing etc complete. | 47 | Day | 908.52 ₹42,700.44 Lowest |
| 1.01 | OD53974/2026-2027:Engaging Plumbers for repairing leaking in water supply lines and other plumbing lines including all cost of material & labour charges etc complete | 25 | each | 1,112.46 ₹27,811.5 Lowest |
| 1.01 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 5,560 | sqm | 15.26 ₹84,845.6 Lowest |
| 1.01 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 4 | each | 2,060.47 ₹8,241.88 Lowest |
| 1.01 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 3 | each | 9,563.45 ₹28,690.35 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,578
Closing Date
16 Jul 2026, 3:00 pmClosed
AEE
AEE, Office of the AEE, PWD Building subdivision,Civil station,Kozhikode.
In this estimate the works such as Cutting of overhanging branches of trees, Clearing of Light Jungle,dumped waste,internal drain,sun shade , roof top etc
2026_PWD_857938_2
PWD/BLDG/TR/7067/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
kozhikode
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
Yes
₹10,578
Yes
17 Sept 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1cutting tree branches | |||||
| 1.001 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.002 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.003 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.004 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | - | cum | - | - |
| 1.005 | OD17983/2026-2027: Engaging labours for varios job like clearing sunshades, roof top,plumbing etc complete. | - | Day | - | - |
| 1.006 | OD53974/2026-2027:Engaging Plumbers for repairing leaking in water supply lines and other plumbing lines including all cost of material & labour charges etc complete | - | each | - | - |
| 1.007 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.008 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
| 1.009 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1454094.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1454094.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .