| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹17.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.9 L+₹29,941.79 (1.71%)Admitted-Fee/PreQual/Technical/Finance | ₹17.9 L+₹29,941.79 (1.71%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹18.9 L+₹1.3 L (7.36%)Admitted-Fee/PreQual/Technical/Finance | ₹18.9 L+₹1.3 L (7.36%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹19.9 L+₹2.3 L (13.2%)Admitted-Fee/PreQual/Technical/Finance CALICUT ROAD KAKKATTIL CALICUT | KOZHIKODE | KERALA | 612906 | ₹19.9 L+₹2.3 L (13.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | KALPETTA ZONE LABOUR CONTRCT CO-OPERATIVE SOCIETY LTD L4 | T SURESH BABU L3 | M SURESH L1 | NAWAS P M A L2 |
|---|---|---|---|---|---|---|---|
| 1.00Repair and rennovation | |||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.64 | cum | 1,864.6 ₹1,197.07 | 1,769.19 ₹1,135.82 | 1,647.7 ₹1,057.82 Lowest | 1,675.96 ₹1,075.97 |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 10 | each | 332.29 ₹3,322.9 | 315 ₹3,150 | 293.6 ₹2,936 Lowest | 298.67 ₹2,986.7 |
| 1.00 | 15.17.2:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats | 104.54 | kg | 2.07 ₹216.41 | 1.97 ₹205.95 | 1.8 ₹188.18 Lowest | 1.86 ₹194.45 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 268.94 | sqm | 66.42 ₹17,862.99 | 63 ₹16,943.22 | 58.7 ₹15,786.78 Lowest | 59.7 ₹16,055.72 |
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 23.5 | sqm | 507.54 ₹11,927.19 | 481.57 ₹11,316.9 | 448.5 ₹10,539.75 Lowest | 456.19 ₹10,720.47 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 3,200.71 | sqm | 17.93 ₹57,388.73 | 17 ₹54,412.07 | 15.8 ₹50,571.22 Lowest | 16.12 ₹51,595.45 |
| 1.01 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 5,191.95 | sqm | 99.76 ₹5,17,949.43 | 94.65 ₹4,91,418.54 | 88.2 ₹4,57,930.43 Lowest | 89.66 ₹4,65,510.69 |
| 1.01 | 13.111.1:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface | 1,657.04 | sqm | 122.53 ₹2,03,037.11 | 116.26 ₹1,92,647.47 | 108.3 ₹1,79,457.43 Lowest | 110.13 ₹1,82,489.82 |
| 1.01 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 612.77 | sqm | 95.04 ₹58,237.47 | 90.17 ₹55,253.29 | 84 ₹51,472.51 Lowest | 85.42 ₹52,342.64 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
24 Aug 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division,Kalpetta
GENERAL-USR to working womens hostel- Painting, Bathroom tile work, Window grill and other repair works in working womens hostel- Kalpetta- General civil work -1
2026_PWD_865741_1
PWD/BLDG/TR/14346/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Kalpetta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
29 Aug 2026
17 Aug 2026
29 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair and rennovation | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.002 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.003 | 15.17.2:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats | 0.6 | kg | - | - |
| 1.004 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 1 | sqm | - | - |
| 1.005 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | - | sqm | - | - |
| 1.006 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | - | sqm | - | - |
| 1.007 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 1 | sqm | - | - |
| 1.008 | 13.111.1:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface | 1 | sqm | - | - |
| 1.009 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 0.2 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1465130.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1465130.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .