Loading…
Loading…
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
3 Aug 2026, 6:00 pm
DFO Social Forestry Division Rajouri
DFO Social Forestry Division Rajouri
Construction of Fencing (2000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL KURLIAN (KURAL), Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
2026_FD_317658_4
e-NIT No. 01 of 2026-27 dated 23-07-2026
Open Tender
Civil Works
Percentage
30 days
Rajouri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
DFO Social Forestry Division Rajouri
₹5,400
Yes
25 Jul 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
3 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | |||||
| 2 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 1 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size), including all leads,lift and carriage complete job. | 1 | Cum | - | - |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed including all leads,lift and carriage complete job. | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete | |||||
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | - | - |
| 7Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | |||||
| 8Supply of precast cement conc. poles of size 75mmx100mmx1800mm (including carriage) | |||||
| 9Erecting c.conc. Poles in position with all lifts and carriages | |||||
| 10 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire . To be paid as per actual | 1 | Mtr. | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1043495.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].