| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.0 LAccepted-AOC | L1 | Accepted-AOC work awarded | |
| 2 | L2₹95.3 L+₹5.3 L (5.84%)Rejected-AOC | L2 | Rejected-AOC rejected | |
| 3 | L3₹96.5 L+₹6.5 L (7.19%)Rejected-AOC | L3 | Rejected-AOC rejected | |
| 4 | L4₹99.2 L+₹9.2 L (10.3%)Rejected-AOC | L4 | Rejected-AOC rejected | |
| 5 | L5₹1 Cr+₹10.0 L (11.1%)Rejected-AOC | L5 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | ABDUL SATHAR B A L3 | MCN INFRASTRUCTURE SOLUTIONS L4 | M.T MUHAMMED MUNAZIR L2 | HUSSANKUNHI M L5 | ANISH MATHEW L6 | gafoor c m L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 47.3 | cum | 240 ₹11,352.24 Lowest | 312 ₹14,757.91 | 269.6 ₹12,752.35 | 300 ₹14,190.3 | 313.92 ₹14,848.73 | 254.73 ₹12,048.98 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 4.88 | cum | 80 ₹390.72 Lowest | 115 ₹561.66 | 98.19 ₹479.56 | 110 ₹537.24 | 114.33 ₹558.39 | 92.77 ₹453.09 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.12 | cum | 6,000 ₹18,720 | 6,300 ₹19,656 | 5,945.44 ₹18,549.77 | 6,500 ₹20,280 | 6,922.77 ₹21,599.04 | 5,617.44 ₹17,526.41 Lowest |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.49 | cum | 7,800 ₹97,398.6 Lowest | 8,100 ₹1,01,144.7 | 9,572.32 ₹1,19,529.56 | 10,500 ₹1,31,113.5 | 11,145.85 ₹1,39,178.23 | 9,044.24 ₹1,12,935.42 |
| 1.00 | OD78867/2022-2023:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 21.23 | cum | 5,800 ₹1,23,139.8 | 5,250 ₹1,11,462.75 | 5,462.54 ₹1,15,975.19 | 6,000 ₹1,27,386 | 6,360.49 ₹1,35,039.56 | 5,161.13 ₹1,09,575.95 Lowest |
| 1.01 | OD78868/2022-2023:
Laterate masonry with neatly dressed laterate stone of size30x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 99.32 | cum | 6,700 ₹6,65,437.3 | 6,300 ₹6,25,709.7 | 6,123.88 ₹6,08,217.64 | 6,700 ₹6,65,437.3 | 7,130.54 ₹7,08,198.1 | 5,786.04 ₹5,74,663.71 Lowest |
| 1.01 | OD78866/2022-2023:Providing and laying in position machine batched and machine mixed design mix M25 grade cement concrete for reinforced cement concrete work ,using cement content as per approved design mix ,including pumping of concrete to site of laying but excluding the cost of centering ,shuttering ,fininshing and reinforcement,including admixtures in recommended proportions as per IS:9103 to accelerate ,retard setting of concrete,improve workability without impairing strength and durability as per direction of Engineer in charge Note: Cement content considered in this item is @330kg/m3.Excess cement used as per design mix is not payable or less usage of cement content is recoverable separately.All work above plinth level up to floor V level | 79.26 | cum | 10,200 ₹8,08,452 | 10,450 ₹8,28,267 | 9,621.26 ₹7,62,581.07 | 10,500 ₹8,32,230 | 11,202.83 ₹8,87,936.31 | 9,090.44 ₹7,20,508.27 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,167.71 | kilogram | 75 ₹87,578.25 | 75 ₹87,578.25 | 84.26 ₹98,391.24 | 68 ₹79,404.28 Lowest | 98.11 ₹1,14,564.03 | 79.61 ₹92,961.39 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 12,503.62 | kg | 75 ₹9,37,771.5 | 77 ₹9,62,778.74 | 84.26 ₹10,53,555.02 | 68 ₹8,50,246.16 Lowest | 98.11 ₹12,26,730.16 | 79.61 ₹9,95,413.19 |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
8 Oct 2025, 11:00 amClosed
Superintending Engineer
O/o the Superintending Engineer PWD Buildings North Circle, Kozhikode. PIN 673001 Tel.No. 0495 2720812
Construction of Second floor and finishing works of all three floors.
2025_PWD_803224_1
PWD/BLDG/TR/12061/2022_23
Open Tender
Civil Works - Buildings
Item Rate
540 days
Mavicheri
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,515
Yes
₹50,000
Yes
19 Nov 2025
27 Sept 2025
10 Oct 2025
27 Sept 2025
8 Oct 2025
27 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335296.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .