OFFICE OF THE EXECUTIVE ENGINEER, AMRELI IRRIGATION DIVISION,AMRELI
Construction of New Box Culvert No.3 ( 2 span of 3.0 x 2.0 m clear) at Nana Bhandariya to Pipal lag cart track road in upstream of Vadi Irrigation Scheme (2nd Attempted)
283881
22 (SBD) of 2025-26
Open
Civil Works - Water Works
Amreli
8 documents required · 7 mandatory · 1 optional
₹900
Yes
Executive Engineer, Amreli Irrigation Division,Amreli
₹15,000
Yes
7 Mar 2026
7 Mar 2026
7 Mar 2026
25 Mar 2026
7 Mar 2026
No (INR) (Words)
Excavation in all sort of strata and
formations incl. depositing the
unuseful excavated stuff as and
1 where directed incl sorting and
stacking useful materials as directed
upto 200 mt lead and all lift etc.
complete incl. dewatering.
A) IN OVERBURDEN INCL. HARD Rs. Seventy
MURRUM. Nine Only
B) IN SOFT ROCK. 77.00 Cum. 176.00
Seventy Six
Providing,cutting,bending,binding Rs. Seventy
and fixing in position as per drawing Six
.TMT BAR , reinforcement for Thousand
2 R.C.C. works and anchor bars incl 7.100 MT 76574.00 Five
cost of black annealed 16 to 18 Hundred
BWG M.S.. Wire etc.complete with Seventy
all lead and lift.(b) Fe-500 Four Only
Prov. & Laying in position
"NOMINAL MIX' cement concrete
using cement, sand and crushed
ggregate by mass and machine mix
3 for C.C. work incl. necessary
formworks centering scaffolding
compaction by mechanical
vibrator,curing as directed with all
lead & lift etc complete
FOR GENERAL PURPOSE
C) Concrete grade 1:2:4 and MSA-
20.00 Cu.m 3816.00 Eight
Sixteen Only
Prov. and Laying in position
Controlled cement concrete using
cement, sand and crushed
aggregate by mass and machine
mix for R.C.C/CC work including
necessary formworks centering
scaffolding compaction by
mechanical vibrator,curing as
directed with all lead & lift etc
complete Excluding the cost of
reinforcement
FOR PIER AND ABT.
B) Concrete grade M-20 and MSA- One
40mm Hundred
Fifty Seven
Prov. and Laying in position
Controlled cement concrete using
cement, sand and crushed
aggregate by mass and machine
mix for R.C.C/CC work including
5 necessary formworks centering
scaffolding compaction by
mechanical vibrator,curing as
directed with all lead & lift etc
omplete Excluding the cost of
reinforcement
FOR CSY & DSY BARREL
B) Concrete grade M-25and MSA- Nine
20mm Hundred
Twenty Six
Prov. & Laying. in position
controlled cement concrete using
cement, sand and crushed metal
aggregate by machine mix for
R.C.C work incl. necessary
formworks, centering, scaffolding,
compaction by mechanical
vibrator,curing as directed with all
lead & lift etc complete Excluding
the cost of reinforcement.
For Wearing coat 75 mm
thick..Filling expantion joint with
2/d) Concrete grade M-25 and MSA Thousand
- 20mm(Graded) Six Hundred
Sixty Only
Providing and fixing G.I.Pipe railing
( B-class medium duty ) as per Rs. One
design of 1.0 mt height, using Thousand
75x75x10 mm size M.S Angle at 2.0 Nine
mt c/c for vertical posts and 38 mm Hundred
dia G.I.Pipe for 4 horizontal rows Forty Two
incl one coat of red oxide primer & Only
twocoats of oil paint etc complete.
Providing and fixing in position
8 100/110 mm dia PVC Pipe weep 2.10 Rmt 358.00
Fifty Eight
holes in the retaining walls.
Back filling with appropriate
excavated material behind the
structure or refilling the trenches
9 Rs. Eighty
with excavated useful material 38.00 Cu.m 84.00
including watering ramming,
consolidation etc complete with all
lead and lift.
10 Photography and Videography 1.00 Job 500.00 Hundred
(Rupees Forteen Lac Twenty Four Thousand Seven Hundred Sixty and Twenty Paisa)
I/We am/are willing to carry out the work at...… %above/below percent (Should
Be written in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out
*Estimated amount put to tender Rs. *Estimated amount put to tender Rs.
Deduct % Below Rs. Add % above Rs.
Net Rs. Total Rs.
(In words) Rupees (In words) Rupees
1 All works shall be carried out as per Public Works Department Hand Book and other specifications of
Division or as directed.
2 All the columns in schedule should be filled in ink and total of the entries in the last column should be
struck by the contractor under his signature.
3 Rates quoted include clearance of site (prior to commencement of work and its close) in all respect
and hold good for work under all condition, site, moisture, weather etc.,
4 To be continued on additional sheets, if found necessary
Executive Engineer
Amreli Irrigation Division
(B) For Item Rate Tender(For above INR50Cr.):
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Construction of New Box Culvert No.3 Vadi Irrigation.pdf
BOQ Construction of New Box Culvert No.3 Vadi Irrigation.pdf
Tender Notic No.22 of 2025-26.pdf
Download all tender documents and submit your bid