Executive Engineer, Gir Somnath Irrigation Division, Veraval Ishvar Complex, 3rd Floor, A-Wing, Opp. Reliance Mall, Veraval-Junagadh Road, Veraval-362265
Construction of R.C.C. Road Surface For Approach Road Of Hiran-2 Dam From Village Umrethi,Generator Room And Approach Road OF Dam Of D/S To LHS Of Hiran-2 Irrigation Scheme.
273431
Online E-Tender Notice No. 35 of 2025-26
Open
Civil - All
Works
Gir Somnath
8 documents required · 8 mandatory
₹3,600
Yes
Executive Engineer,Gir Somnath Irrigation Division,Veraval
₹2.3 L
Yes
5 Feb 2026
5 Feb 2026
5 Feb 2026
25 Feb 2026
5 Feb 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Dismantling stone/brick masonry &stacking 116.00 Cum. 616.00
of useful and unusefu material from the
dismantled materials as directed etc
complete. (a) In cement mortar
2 Dismantling of RCC work viz. slab, beam, 15.00 Cum. 1362.00
lintel, barrel, staircase, etc. including
removing the steel from the dismantled
portion without damage to reinforcement
sorting and stacking of useful and unuseful
material from the dismantled material as
directed etc comp
3 Excavation in all sort of strata and formations 96.00 Cum 79.00
incl. depositing the unuseful excavated stuff
as and where directed incl sorting and
stacking useful materials as directed upto
200 mt lead and all lift etc. complete incl.
A) IN OVERBURDEN INCL. HARD
4 Prov. and Laying in position Controlled 10.00 Cum. 4032.00
cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for R.C.C/CC work
including necessary form work
centering scaffolding compaction by
vibrator,curing as directed with all lead
&l ift etc complete Excluding the cost of
FOR PLINTH COURSE & COPING :: B)
Concrete grade M-15 and MSA-40mm
5 Providing,cutting,bending,binding and fixing 3.84 M.T. 75789.00
in position as per drawing H.Y.S.D. BAR
reinforcement for R.C.C. works and anchor
bars incl cost of black annealed 16 to
BWG M.S.. Wire etc.complete with all lead
6 Prov. and Laying in position Controlled 41.00 Cum 5448.00
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including necessory
formworks centering scaffolding compaction
by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the
cost of reinforcement FOR SOLID SLAB OF
ROAD BRIDGE A) Concrete grade M-20 and
7 Providing & Laying in position controlled 72.00 Cum 4729.00
cement concrete using cement sand &
crushed metal aggregate by machine mix
incl.necessary formworks, compaction by
mechanical vibrator curing as directed with
all lead and lift etc complete. Excluding the
cost of steel. For training wall, side wall and
general purpose.
C) Concrete grade M-20 and MSA-
8 Earthwork / Back filling with selected earth 69.00 Cum 141.00
brought from out side borrow area or from
excavated useful material incl. spreading in
layers, watering , Compaction by
pneumatic/Mechanical equipment and all
lead and lift etc complete.
9 Providing and fixing in position 100/110 mm 22.00 Rmt 358.00
dia PVC Pipe weep holes in the retaining
walls/sidewall/abt etc
10 Box cutting the road surface to proper slope 2703.38 Cum 215.62
and camber for making a base for road work
including removing the excavated stuff and
depositing on the road side slope as directed
upto 50Mt.lead.
11 Granular Sub-base with Black trap crushed 1081.35 Cum 934.86
stone Well Graded Material (Table 400.1)By
Mix in Place Method Construction of granular
sub-base by providing Black trap crushed
stone well graded material, spreading in
uniform layers with motor grader on
prepared surface, mixing by mix in place
method with rotavator at OMC, and
compacting with vibratory roller to achieve
the desired density, complete as per
Technical Specification Clause 401. For
Grading I Material
12 Supplying and Stacking of Machine Crushed 1622.03 Cum 737.98
Stone Aggregates, chippings of Hard Stone
25 to 50 mm size free of disintegrated
pieces of deleterious and organic matter ( for
W.B.M.Road ) and grading as per I.R.C.
code with 07.00 K.M. lead including filling
13 Spreading the stone aggregate for rolling 1622.03 Cum 274.73
and W.B.M. including filling the interstices to
required camber and gradient (excluding
spreading of Blindage)(iii) 25mm to 50mm
size crushed stone
14 Rolling and consolidation using vibratory 1622.03 Cum 59.09
road roller 8 - 10 tonne capacity (C) Water
bound Macadam (Layer not exceeding
100mm thickness)
15 Construction of concrete road using tremix 2202.75 Cum 6081.05
system with 22cm thick controlled C.C. M-
300 concrete mixing conplast P-211 water
reduction admixture @ 100 ml/bag of
cement using fixing and removing 'C'
channels of required road depth levelling if
placed concrete with surface vibrator,
finishing the surface with power floter and
towel tight brooming as directed with
providing Contraction joints using cocnrete
cutter machine and filling with sealent etc.
16 Providing and fixing in position FE 500D 65.31 M.T. 73243.02
TMT bar reinforement including cutting,
bending and tying complete as per detailed
drawings. (A) R.C.C. Kerb. (B) R.C.C.
Footpath.(C) R.C.C. Approch slab.(D)
17 (i) Supplying of murrum / binding 961.20 Cum 106.66
18 Spreading blindage or road crust filling the 961.20 Cum 162.22
gaps in metal and leveling to camber and
gradient as directed.(i) Murrum
Total Amount :-
Total Amount :-
In words(Two crore Twenty Seven Lakh Eighty One Thousand Five Hundred Sixty Eight
and Fifteen paisa only)
I/We am/are willing to carry out the work at….......................% above/below percent (Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book figures
of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Gir Somnath Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD RCC Road Umrethi.pdf
BOQ.pdf
Tender Notice No 35 of 2025-26.pdf
Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .