Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹12.8 Cr+₹9.0 Cr (237.1%)Admitted-Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | ₹12.8 Cr+₹9.0 Cr (237.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical AS PER RFP |
| 4 | Rejected-Technical | - | - | Rejected-Technical AS PER RFP |
| 5 | Rejected-Technical C 111 STATION PLAZA STATION ROAD STATION ROAD BHANDUP W MUMBAI 400078 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | - | - | Rejected-Technical AS PER RFP |
| Sl No | Description | Qty | Unit | Mercury Ship Repairs Pvt Ltd L2 | RNP SCAFFOLDING AND FORMWORK PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value =01 Nos | 9,268 | Nos | 4,500 ₹4,17,06,000 | 975 ₹90,36,300 Lowest |
| 2.00 | Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value=01 Nos | 9,268 | Nos | 1,000 ₹92,68,000 | 525 ₹48,65,700 Lowest |
| 3.00 | Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value =01 Nos | 6,860 | Nos | 4,500 ₹3,08,70,000 | 1,200 ₹82,32,000 Lowest |
| 4.00 | Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value=01 Nos | 6,860 | Nos | 1,000 ₹68,60,000 | 650 ₹44,59,000 Lowest |
| 5.00 | Material hiring charges including transportation cost per day for IN Ships. 01Nos = 12 Pipes which includes 104 standard, 04 ledger and 04 transom as shown in diagram attached in annexure -1 | 350 | Nos | 3,000 ₹10,50,000 | 93.33 ₹32,665.5 Lowest |
| 6.00 | Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value =01 Nos | 3,972 | Nos | 4,500 ₹1,78,74,000 | 975 ₹38,72,700 Lowest |
| 7.00 | Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value=01 Nos | 3,972 | Nos | 1,000 ₹39,72,000 | 525 ₹20,85,300 Lowest |
| 8.00 | Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value =01 Nos | 2,940 | Nos | 4,500 ₹1,32,30,000 | 1,200 ₹35,28,000 Lowest |
| 9.00 | Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value=01 Nos | 2,940 | Nos | 1,000 ₹29,40,000 | 650 ₹19,11,000 Lowest |
| 10.00 | Material hiring charges including transportation cost per day for IN Submarines. 01Nos = 12 Pipes which includes 104 standard, 04 ledger and 04 transom as shown in diagram attached in annexure -1 | 150 | Nos | 3,000 ₹4,50,000 | 93.33 ₹13,999.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹13.3 L
Closing Date
12 Apr 2022, 10:30 amClosed
AGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
RATE AGREEMENT FOR ONE YEAR EXTENDABLE UP TO ONE MORE YEAR FOR ERECTION /REMOVAL OF PIPE SCAFFOLDING AND CANTILEVERS ONBOARD IN SHIPS AND SUBMARINES
2022_NAVY_515901_1
DYT/DDHP21-22/106AB/PL-IN/ SHIP SM CANTILEVER/488
Open Tender
Marine Services
Item Rate
365 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13.3 L
Yes
NAVAL DOCKYARD MUMBAI
1 Aug 2022
30 Mar 2022
13 Apr 2022
30 Mar 2022
12 Apr 2022
5 Apr 2022
5 Apr 2022
Amount
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value=01 Nos
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value=01 Nos
Material hiring charges including transportation cost per day for IN Ships. 01Nos = 12 Pipes which includes 104 standard, 04 ledger and 04 transom as shown in diagram attached in annexure -1
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 = 7.5 cum will be 01 unit value=01 Nos
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Submarines. (steel stage will be on volume basis i.e Lx B x H. Length, breadth & height will be considered in multiples of 2mtr, 1.25mtr & 3 mtr. Therefore the least count will be 2 x 1.25 x 3 =7.5 cum will be 01 unit value=01 Nos
Material hiring charges including transportation cost per day for IN Submarines. 01Nos = 12 Pipes which includes 104 standard, 04 ledger and 04 transom as shown in diagram attached in annexure -1
Mercury Ship Repairs Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .