Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC NOT SPECIFIED | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.5 L+₹31,810.09 (6.17%)Rejected-Finance VPO BARI TEHSIL FATEHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | L2 | Rejected-Finance L2 | |
| 3 | L3₹6.6 L+₹1.5 L (29.0%)Rejected-Finance 1ST FLOOR AMRIT EDUCATION GOVT DEGREE COLLAGE ROAD DHALIARA TEHSIL DEHRA DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | L3 | Rejected-Finance L3 |
Tender Value
₹5.8 L
EMD Value
₹5,774
Closing Date
22 Apr 2022, 5:00 pmClosed
Er. Rajiv Kumar
Operation Circle, HPSEBL, Dalhousie, Distt. Chamba HP
Tender for Supply of equipment / material , design, erection, testing commissioning for SOP to Jal Shakti Vibhag for T/Well Bhapoon by Prov. 11/.4 KV 100 KVA S/Stn. a/w 11 KV HT and LT line in section Dah ESD Indora ED Fatehpur
2022_HPSEB_59421_1
OCD/DB/Bid-04/2022-23
Open Tender
Electrical Works
Turn-key
90 days
Dah Indora
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹5,774
13 May 2022
11 Apr 2022
25 Apr 2022
11 Apr 2022
22 Apr 2022
11 Apr 2022
Amount
11/.4 KV 100 KVA DISTRIBUTION SUB STATION
11/.4 KV 100 KVA DTR (REC Sep. ord 11/1976
Prov. ST Pole Pole 9 Mtr. Long W/L 200 Kgs
Muff for steel tubular pole with concrete filling
X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line
MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LA's )
X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for transformer bed
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer]
MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No.
MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly
MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly
G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly
G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type
D.O Fuse unit
Surge Arrester, 9 kV Station Class
Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.)
Stay set complete
Stay wire (7/3.15mm)( 7 Kg per stay set)
Pipe earthing with GI,Charcoal & Salt
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 100KVA Trf. as per specification
Half clamp (M.S. Flat 50x6)
Full clamps (M.S. Flat 50x6)
M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer)
Aluminium Thimbles
Copper Thimble
Danger Plate
Barbed wire (REC Sp F 3/1981)
LT Cable 3-1/2 core-120mm sq.
Alluminium Paint
Prov.AAAC 7/3.15 mm
Prov. Transformer structure protection plinth(Civil Work As per HPSR) for 100KVA S/Stn
11 kV HT Line
7/3.15 mm sq. (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}
Prov. Steel tubular poles. 9 mtrs
Muff for steel tubular pole (2000mm long) with concrete filling
Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle)
Angle Iron (50x50x5 mm), Length (2x750) mm x 2 structures (Run Through structure (Formation Tringle)
Pole Top Bracket [MSCI:100x50x6mm-100mm]
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle)
Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures
X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures
X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures
Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.)
Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set)
HT earthing set complete (REC Constr. Standared J-1)
Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
Eye Hook for earth wire
Earth Wire Clamp
MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing
Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.)
Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.)
Danger Plate (250X200X1.6 mm)
M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer)
Barbed wire (REC Sp F 3/1981)
G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type
Alluminium Paint
Aman Deep
ILLUMINATE MANAGEMENT AND GLOBAL SERVICES PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .