Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-Finance AT BHAGANAL P O KANPUR DIST KEONJHAR STATE ODISHA | KENDUJHAR | ODISHA | 758001 | ₹14.7 L | L1 | Accepted-Finance lottery winner |
| 2 | L1₹14.7 LRejected-Finance | ₹14.7 L | L1 | Rejected-Finance lottery loser |
| 3 | L1₹14.7 LRejected-Finance AT CHUNNATI PO KUPARI PS KHAIRA DIST BALASORE | ₹14.7 L | L1 | Rejected-Finance lottery loser |
| 4 | L1₹14.7 LRejected-Finance | ₹14.7 L | L1 | Rejected-Finance lottery loser |
| 5 | L1₹14.7 LRejected-Finance R W DIVISION ANANDAPUR | BARDHAMAN | WEST BENGAL | 713364 | ₹14.7 L | L1 | Rejected-Finance lottery loser |
Tender Value
₹14.9 L
EMD Value
₹14,900
Closing Date
6 Jul 2026, 5:30 pmClosed
O/o the SE, Baitarani Irrigation Division, Salapad
O/o the SE, Baitarani Irrigation Division, Salapad
Improvement to Service Road of Mathasahi Minor from NH to 800M for the year 2026-27
2026_BDVS_132499_27
BAID 02 OF 2026-27
Open Tender
Civil Works - Canal
Percentage
120 days
Salapada
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹14,900
Yes
26 Jul 2026
22 Jun 2026
7 Jul 2026
22 Jun 2026
6 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of Grass and removal of rubbish upto a distance of 50m outside the periphery of the area including cost of labour T&P etc complete as per the direction of the Engineer-in-Charge | 2,520 | Cum | 2.9 | ₹7,308 |
| 2 | Collecting, conveying and stacking good quality of Moorum from approved quarry and approved quality at work site on regular box of heaps of size 1.5x1.5x0.50m to be measured as one cum and conveying from pre-measured stacks and spreading on road surface watering and rolling with HRR including cost, carriage, royalty of all materials including hire & running charges of HRR etc complete as per the direction of the Engineer-In-Charge | 120 | Cum | 1,572.7 | ₹1,88,724 |
| 3 | Excavation of any approved type of soil in approved borrow arear by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm layers to make ready for watering & ordinary compaction with PRR (8-10 Ton) including construction & Maintenance of haul road including royalty & hire charges of PRR and LW cess to complete the item of work with all labour, T&P etc complete as per the direction of the Engineer-in-Charge (Earth should be arranged by contractor and measurement will be taken on finished level section) | 132 | Cum | 187 | ₹24,684 |
| 4 | Collecting, conveying, supplying, and stacking IRC Grade-II Metal (63mm to 45mm) size crusher broken hard granite metal from approved quarry and stacking at worksite in regular box heaps of size 1.5mx1.5mx0.50m for pre-measurement to be measured as one cum with all cost, conveyance, royalty and taxes of materials to site of work including conveying from stacks and spreading in uniform thickness, hard packing rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of MOSRT&H specification including hire and running charges of P.R.R., labour and T&P required for the work etc complete as per direction of Engineer in charge. | 180 | Sqm | 3,632.1 | ₹6,53,778 |
| 5 | Collecting, conveying and stacking good quality of Moorum and sand from approved quarry and approved quality at work site on regular box of heaps of size 1.5x1.5x0.50m to be measured as one cum and conveying from stacks and admixing Moorum and Sand (70:30) proportionate including watering and compacting to required density with PRR with hire and running charges of PRR, T&P including cost, carriage royalty and all other taxes of all required materials to complete the item of work in all respect as per the direction of the Engineer-in-Charge | 378 | Cum | 1,621.8 | ₹6,13,040.4 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
finance_597234.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_597234.xls
BOQ • 0.33 MB
27.pdf
Tender Documents • 2.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .