Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.5 L+₹52,779.47 (26.1%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ANILKUMAR N L2 | Joji L1 |
|---|---|---|---|---|---|
| 1.00Emergency monsoon cleaning | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 3,750 | sqm | 21.38 ₹80,175 | 16.95 ₹63,562.5 Lowest |
| 1.00 | OD3383/2026-2027: Removal of all floating organic and inorganic wastes such as cloth wastes, bottles, electronic wastes, electric wastes, wooden branches of trees, thermocols, hotel wastes, poultry waste, plastic wastes, kitchen utensils, leafs and other dumped wastes Using any type of departmental/ contractors own machinery including disposal of removed materials by the contractor at his own means without causing damage to environment and society including all leads lifts etc complete as departmental officers in charge. | 45 | sqm | 100.22 ₹4,509.9 | 79.48 ₹3,576.6 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 298.31 | cum | 302.85 ₹90,344.09 | 240.18 ₹71,648.82 Lowest |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 180 | each | 443.95 ₹79,911 | 352.07 ₹63,372.6 Lowest |
Tender Value
₹2.2 L
EMD Value
₹5,542
Closing Date
5 Jun 2026, 6:00 pmClosed
AEE
O/o Asst.Executive Engineer,INSDN(Major), PMG,TVPM
G E N E R A L - I S A P r e m o n s o o n 2026 Ponnanchund-Emergency Premonsoon cleaning and removal of obstruction to the flow in Vamanapuram river at Ponnanchundu and Attumanappuram in Vithura Panchayath- General Civil Work
2026_Irrig_853702_1
IRR/IA/TR/2762/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
Vithura
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹5,542
Yes
7 Jul 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
5 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Emergency monsoon cleaning | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | OD3383/2026-2027: Removal of all floating organic and inorganic wastes such as cloth wastes, bottles, electronic wastes, electric wastes, wooden branches of trees, thermocols, hotel wastes, poultry waste, plastic wastes, kitchen utensils, leafs and other dumped wastes Using any type of departmental/ contractors own machinery including disposal of removed materials by the contractor at his own means without causing damage to environment and society including all leads lifts etc complete as departmental officers in charge. | - | sqm | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.2 | cum | - | - |
| 1.004 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1442781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1442781.xls
BOQ • 0.30 MB
bid.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .