Loading…
Loading…
Tender Value
₹2.9 Cr
EMD Value
₹5.7 L
Closing Date
16 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
(1)Proposal of cess repair under the jurisdiction of DEN/North/Adra(2) Strengthening of Major bridge approach 89UP and 89DN between KSX-BKSC Section in Adra Division.
E-DRM-Engg-ADRA-51-26
E-DRM-Engg-ADRA-51-26
Open
12 Months
Purulia, West Bengal
₹0
₹5.7 L
23 Jun 2026
23 Jun 2026
2 Jul 2026
A-Execution of all works under SER-HQ-IR-USSOR 2021-3-Ver-1 28628546.17 Below/P
B-Execution of work covered under CPWD DSR-2023-Ver-1 80368.75 Below/P
Item Breakup - A-Execution of all works under SER-HQ-IR-USSOR 2021-3-Ver-1
73471.84 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment.
9551.34 making cess on other side of the track (when no approaches available along track or no road vehicles to work at site) by dumping contractor's own earth, collected along toe of bank of any height on to other side of track & side slope of the existing bank by head load, duly crossing of tracks with all contractor's materials, labour, tools, plant including loading of earth in baskets, lifting, leading to the non-cess side of bank including crossing of tracks & dumping etc. and as directed by the Engineer in-charge. Total 22598233.46 Item- 2 Strengthening of bridge approach vide est. No.58/ADA/26 S No. Item Description of Item Unit Qty Rate Amount No Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
20.00 2400.98 graded stone aggregate 20 mm nominal size)
24.00 2499.64 graded stone aggregate 40 mm nominal size). ADRA DIVISION-ENGG/SOUTH EASTERN RLY P r o v i d i n g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in c h a r g e . N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
cum Centering and shuttering including strutting, propping etc. and removal of form for :
550.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level Supply and using Cement at Worksite
45.00 8964.18 brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
6000.00 500D or more of approved brands/makes.
1150.00 1565.26 Boulders, weighing not less than 35kg each with voids filled with spalls on slopes, laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item).
122.00 2737.41 Specifications underneath pitching in slopes complete as per drawing and Technical Specification. ADRA DIVISION-ENGG/SOUTH EASTERN RLY
2499.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 4573887.05
Item Breakup - B-Execution of work covered under CPWD DSR-2023-Ver-1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CorrectionSlip08.pdf
ATTACHMENT
ANNEXUREVIAforBIDSECURITY.pdf
ATTACHMENT
8.LocationCessRepair-18-ADA-26.pdf
ATTACHMENT
ASC-2GCC-2022.pdf
ATTACHMENT
GCCACS.pdf
ATTACHMENT
CorrectionslipNo.11.pdf
ATTACHMENT
ACS-03OFGCC2022.pdf
ATTACHMENT
AnnexureVIBwithUDIN.pdf
ATTACHMENT
CorrectionslipNo4.pdf
ATTACHMENT
CorrectionslipNo9.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril- correction slip
ATTACHMENT
JPOcabledamage.pdf
ATTACHMENT
Letterofcreditboardletter.pdf
ATTACHMENT
sharamikkalyanportal.pdf
ATTACHMENT
correctionslip.pdf
ATTACHMENT
GCC 2022
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril- Correction slip
ATTACHMENT
CorrectionSlipNo_7ACS-71.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
Download all tender documents and submit your bid