Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹41.1 L
EMD Value
₹42,000
Closing Date
4 Jul 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Appointing Agency for supplying manual staff services for maintenance, repairs & operation of Different location & Radial gates of Karjan Dam under jurisdiction of Irrigation Project Sub Division No.27,Rajpipla for the year 2026-27
315029
10 of 2026-27
Open
Civil - All
Works
Narmada
8 documents required · 8 mandatory
₹1,500
Executive Engineer Irrigation Project Dn. No.4
₹42,000
19 Jun 2026
19 Jun 2026
19 Jun 2026
4 Jul 2026
19 Jun 2026
120 days
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender ( Upto INR 50 Cr.)
Name of Work : Appointing Agency for supplying manual staff services for
maintenance, repairs & operation of Different location & Radial gates of
Karjan Dam under jurisdiction of Irrigation Project Sub Division
No.27,Rajpipla for the year 2026-27
Ite Description of Item (with brief Quantity Unit Rate In Amount
m specification and reference to figures
No book of specifications)
1 Providing services of 1004 Man- 650.9305
Mechanic/Electrician for day
maintenance,repairs & operation of
Different electrical location & Radial
gates of Karjan Dam under
jurisdiction of Irrigation Project Sub
Division No.27,Rajpipla for the year
2 Providing services of Assistant
Elecrician/Helper for operation of 2008 Man- 638.4725
Different location & Radial gates day
of Karjan Dam under jurisdiction
of Irrigation Project Sub Division
No.27,Rajpipla for the year
3 Providing services of unskilled
labourers for operation of 3480 Man- 624.7687
Different location & Radial gates day
of Karjan Dam under jurisdiction
of Irrigation Project Sub Division
No.27,Rajpipla for the year
Note : 1) The Service Charge can’t be in Minus Figure (-)/ Zero “0” and allowed upto one
2) The Price quoted in the tender are Exclusive of GST and GST Will be paid Separately.
I/We/am/are willing to carry out the work at… ................ % above/below percent
Be written in figures and words) of the estimated rate mentioned above. Amount of
my/our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)………………………………
(C)Net Tendered Amount (A-B) (in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. as stated in S.O.R .therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Sign Of Contractor Deputy Executive Engineer Executive Engineer
Irrigation Project Division Sub Div. No.27 Irrigation Project Division No.4
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT karjan dam.pdf
BOQ manpower karjan dam.pdf
SBD karjan dam.pdf
technical specification karjan dam.pdf
terms and condition karjan dam.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .