Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Fee/PreQual/Technical/Finance | -32.38% | ₹16.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹16.6 L+₹33,210.40 (2.04%)Admitted-Fee/PreQual/Technical/Finance RAMNAGAR P O P S AGARTALA AGARTALA | NA | NA | 799001 | -31.00% | ₹16.6 L+₹33,210.40 (2.04%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹16.7 L+₹43,558.57 (2.68%)Admitted-Fee/PreQual/Technical/Finance DHALIAI SONAMURA SEPAHIJALA TRIPURA 799131 | SEPAHIJALA | TRIPURA | 799131 | -30.57% | ₹16.7 L+₹43,558.57 (2.68%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹16.9 L+₹67,624.08 (4.16%)Admitted-Fee/PreQual/Technical/Finance A D NAGAR ROAD NO 1 WEST TRIPURA 799003 | WEST TRIPURA | TRIPURA | 799003 | -29.57% | ₹16.9 L+₹67,624.08 (4.16%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹17.8 L+₹1.5 L (9.20%)Admitted-Fee/PreQual/Technical/Finance V 1 P O BEJIMURA SONAMURA SONAMURA SEPAHIJALA TRIPURA | SONAMURA | SEPAHIJALA | TRIPURA | -26.16% | ₹17.8 L+₹1.5 L (9.20%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.1 L
EMD Value
₹48,131
Closing Date
17 Sept 2026, 2:00 pmClosed
The Executive Engineer Agri West Agartala
The Executive Engineer West-I Department of Agriculture and F W Agartala Tripura
Construction of Approach Road at Sonamura Vegetable Wholesale Market under Boxanagar Agri Sub Division.
2026_AGRI_76820_1
47/AGRI/EE(WEST-I)/2026-27
Open Tender
Civil Works
Percentage
30 days
SONAMURA
AS PER DNIT
6 documents required · 6 mandatory
₹1,000
₹48,131
17 Sept 2026
10 Sept 2026
17 Sept 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Granular Sub-base with well graded material (using Jhama brick aggregate )(Table400.1 by Mix in Place Method) Construction of Granular Sub-Base by providing well graded material ( Jhama Brick Aggregate,as per Table :-400.1 Grading-I), spreading in uniform layers with tractor with attachments or motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRT&H Technical specification Clause401. For Grading-1 Material (Jhama Brick Aggregate) | 202.5 | Cum | 4,756.5 | ₹9,63,191.25 |
| 2 | Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge: (a) 80 mm thick c.c. paver block of M-35 grade with approved colour, design and pattern. | 930 | Sqm | 1,552 | ₹14,43,360 |
stage.html
html • 0.04 MB
finance_78203.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.74 MB
DNIT47.pdf
Tender Documents • 4.08 MB
BOQ_78203.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .