| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-Finance | ₹12.3 L | 1 | Accepted-Finance L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | ABDUL NOUFAL T K L2 | SULFIKER ALI P.P. L1 |
|---|---|---|---|---|---|
| 1.00Road work | |||||
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 327.28 | sqm | 384.7 ₹1,25,904.62 | 373.44 ₹1,22,219.44 Lowest |
| 1.00 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 3,480 | sqm | 14.08 ₹48,998.4 | 13.67 ₹47,571.6 Lowest |
| 1.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | 3,480 | sqm | 278.39 ₹9,68,797.2 | 270.25 ₹9,40,470 Lowest |
| 1.00 | OD68707/2026-2027::Surface dressing of the ground including removing vegetation and inequalities not
exceeding15 cm deep and disposal of rubbish, lead upto 1.5 m. | 105 | sqm | 33.68 ₹3,536.4 | 32.7 ₹3,433.5 Lowest |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 10.5 | cum | 3,070.89 ₹32,244.35 | 2,981.04 ₹31,300.92 Lowest |
| 1.01 | OD68708/2026-2027:75.8.1 Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (WITHOUT FORMWORK)
(i) Nominal mix (1:2:4) | 10.5 | cum | 8,429.73 ₹88,512.17 | 8,183.09 ₹85,922.45 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,764
Closing Date
14 Aug 2026, 6:55 pmClosed
ASSISTANT EXECUTIVE ENGINEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
Annual Plan-Malappuram DP (2026-27), Project No 136-27 -Improvements for Karutheni mullasheri road at Kalikkavu-General Civil Work (Retender)
2026_LSGD_864432_10
DB1/TN/AEE/12/26-27
Open Tender
Civil Works - Roads
Item Rate
365 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹31,764
Yes
11 Sept 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road work | |||||
| 1.001 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 1 | sqm | - | - |
| 1.002 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.003 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | - | sqm | - | - |
| 1.004 | OD68707/2026-2027::Surface dressing of the ground including removing vegetation and inequalities not
exceeding15 cm deep and disposal of rubbish, lead upto 1.5 m. | - | sqm | - | - |
| 1.005 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | - | cum | - | - |
| 1.006 | OD68708/2026-2027:75.8.1 Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (WITHOUT FORMWORK)
(i) Nominal mix (1:2:4) | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1462660.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1462660.xls
BOQ • 0.30 MB
PRELIMINARY AGREEMENT.pdf
Tender Documents • 0.15 MB
E-PAYMENT.pdf
Tender Documents • 0.01 MB
FORM OF TENDER.pdf
Tender Documents • 0.18 MB
INTEGRITY PACT.pdf
Tender Documents • 0.05 MB
AFFIDAVIT.pdf
Tender Documents • 0.35 MB
10SBD.pdf
Tender Documents • 1.73 MB
10.pdf
Tender Documents • 0.02 MB
10NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .