Tender Value
₹45.1 Cr
EMD Value
₹11 L
Closing Date
30 Jul 2026, 4:00 pm
Additional Chief Engineer (P&C)
Supply, Erection, Testing and Commissioning of 220 kV 1C x 1200 sq. mm Aluminum Conductor XLPE Underground Cable (2(6+0)) (Twin per Phase) from Proposed 220 kV M/C Cable Termination Tower AP-4 to 220 kV Kanbha GIS and from AP-37 to 220 kV Dehgam S/S (Route Length: 0.950 km U/G + 17.32 km O/H + 1.650 km U/G) under 220 kV D/C Kanbha–Dehgam (PGCIL) Line.
322345
ACE(P&C)/Contract/E-471/220kv/UG/S,L&E
Open
Electrical Works
Vadodara
36 documents required · 33 mandatory · 3 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹11 L
9 Jul 2026
9 Jul 2026
9 Jul 2026
30 Jul 2026
9 Jul 2026
Estimated Cost of laying of two equal lengths of FOAC (Fiber Optic Approach Cable) ( DWSM - Dual window single mode, 48F) - with
installation hardware like ties / clips / cleats, conduits, HDPE ducts, supports, fittings, accessories etc with required arrangement to lay along
side of U/G cable - (Annexure-B1 (Supply) & B2 (Erection))
Estimated Cost (Supply Part) (Annexure-B1)
Sr.No. Name of Line FOAC Single Length Nos. of such sigle length Total length of FOAC
(DWSM 48F) (meter) of FOAC required (DWSM 48F) (meter)+
Length of approach cable
1 220Kv Kanbha-Gantry to AP-4/0 1050 2
2 220Kv Dehgam-Gantry to AP-37/0 1820 2
Estimated Cost (Erection Part) (Annexure-B2)
Sr.No. Name of Line FOAC Single Length Nos. of such sigle length Total length of FOAC
(DWSM 48F) (meter) of FOAC to be laid (DWSM 48F) (meter)+
Length of approach cable
1 220Kv Kanbha-Gantry to AP-4/0 1050 2
2 220Kv Dehgam-Gantry to AP-37/0 1820 2
Following points are important from work execution perspective, same may please be noted.
i) Fiber optic approach cable (FOAC) shall be laid with 220kV cable system strictly as per approved method of construction i.e MOC. Each run of FOAC shall be of
continuous length, no in between splicing is allowed.
ii) Two to Three rings of extra loop length shall be kept buried underground at foot of both end termination tower after laying FOAC cable with 220kV cable as per
iii) FOAC cable length remain outside and above the ground level shall be 2 times the height of each termination tower at both end. Each run of FOAC cable coming
out after laying in underground section should be brought up to third cross arm of termination tower after passing it through HDPE pipes and properly tying up
with tower. Also, each run of FOAC cable shall be terminated in individual joint box on each termination tower.
iv) Balance length of each FOAC cable (i.e. Approximately half of tower height) after bringing out the FOAC cable above from ground level and up to third cross arm
of termination tower, it shall be managed in rings properly with fixing clamp arrangement to hold up it on end termination tower.
v) As per standard GETCO format of "End to End test.pdf" , after laying FOAC cable, each length shall be tested for end to end test using power meter and OTDR.
Original copy of Test report duly sealed and signed with date, name & designation of testing person, executing contractor and witnessing officer one each from
telecom as well as TR/Const. nominated from respective EE(Telecom) and EE(TR)/EE(const.) respectively, shall be submitted to under signed & one copy to
respective telecom unit, invariably without fail
vi) Only after getting clearance on validity of test report submitted to this office, filed officer will take further necessary action on commercial part.
vii) DRS (Data requirement sheet) and drawing approval shall be taken for FOAC & joint box before kick starting any erection activity. The work executing
contractor must have to do correspondence on eamil to concern EE (Const.) with copy to project & engineering department, corporate office, GETCO for necessary
concurrence and intimation about to start erection/laying.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
16.EMD BG Format.pdf
1. 220KV POWER CABLE TRENCH -220KV KANBHA-DEHGAM LINEl.pdf
2. 400-220-132 kV LA R6 June 22.pdf
3. Amendment- Structure weight.pdf
5. combine MOC siddheshwar 31.01.2025.pdf
6. G.I. EARTHING STRIPS.PDF
7. OPGW (48F) specs final-R2-11.09.2023 final.pdf
8. Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
9. TOWER MATERIAL-220KV LINE-ZEBRA.PDF
10. TS R1 220 kV Al conductor Al corrugated 1200 sq mm XLPE cable.pdf
11. TS SS STR R12 11.03.2024.pdf
4. Annexure-II PLCC BOQ.pdf
12.BOQ Supply E-471.pdf
13.BOQ Erection Work E-471.pdf
14.BOQ considerations For reference Only.pdf
15.Public Procurement Circular of GOI.pdf
16.EMD BG Format.pdf
17.SD cum PBG Format.pdf
18.Form for Networth Annual turnover LA.pdf
19.ONLINE SCHEDULE_TECH.pdf
20.Online Schedule-QR.pdf
21. Tender Notice-E-471.pdf
22. E-471 Amendment -I Part-I Tender Specification.pdf
23. E-471 Tender Specification Part-I.pdf
Download all tender documents and submit your bid