Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹24.6 L+₹12,515 (0.51%)Rejected-Finance 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹25.7 L+₹1.2 L (5.02%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | M/s badrinath Traders L2 | R. P. Suppliers and Construction Co. L1 | VISHWANATH RUBI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning of tanks after desludging from sewage tanks (Stilling chamber-01 No,Bar & screen Chamber-01 No ,Oil & grease Chamer-01 No, Equilisation Tank-01 No, treated water tank -01 No, Chlorine Contact Tank-01 No, Tube Settler Tank -01 No, Sludge Holding Tank -01 No ) at Stp Plants of capacity 2 MLD to 3 MLD etc shall be carried out with water and chemical as applicable and complete white wash from inside after cleaning the tanks and dates of cleaning shall be marked on tank etc complete all as specified & directed.
Note:-1. Rates for Dewatering and desludging of tanks including T&P and safetly equipments all as directed by Engr-in-Charge is included in above item. 2. Cleaning of each tank will be measured and paid seperately. | 32 | Each Job | 4,000 ₹1,28,000 Lowest | 4,000 ₹1,28,000 Lowest | 6,000 ₹1,92,000 |
| 2.00 | Material & labour for carrying out the Tests of treated water from NABL approved lab every month and maintain the record of treated sewage at Each STP Plant as per frequency :-
(i) PH Valve
(ii) TSS
(iii) BOD
(iv) COD
(v) Oil & Grease
(vi) FC Min
(vii) Nitrate CN
Note:- Test report for each month should be submiited at the end of month by contractor. otherwise penalty of Rs. 2000/- per month will be imposed. | 18 | Each | 2,000 ₹36,000 | 1,000 ₹18,000 Lowest | 1,200 ₹21,600 |
| 3.00 | Taking out Non clog submersible sewage pumping set from eqilisation tank at STP (after and including dewatering of well) of 30 HP capacity by lifting and dismantling the same for assessing and carrying out the repair/serving and replacement of unserviceable parts with new parts as listed in subsequent items and making good in running condition with balancing, reassembling and lowering the same in well & fixing on the foundation making connections and testing complete all as specified & directed.
Note:- (a) The replaced parts of pump shall be measured & paid separately here-in-after as supply only.
(b) Dewatering of well upto max 500 mtr distance from well shall be included in the quoted rate of item. | 2 | Each Job | 2,000 ₹4,000 Lowest | 2,000 ₹4,000 Lowest | 4,000 ₹8,000 |
| 4.00 | Rewinding of motor 30 HP non clog submersible sewage pumping set with suitable size and proper guage of winding wire using best quality of insulation material including all connected items complete all as specified & directed. | 2 | Each Job | 10,000 ₹20,000 | 6,000 ₹12,000 Lowest | 6,000 ₹12,000 Lowest |
| 5.00 | Material and labour in replacement of CI impeller with guide bush suitable for 30 HP Non clog submersible sewage pumping set complete all as specified & directed. | 2 | Each | 1,000 ₹2,000 | 150 ₹300 Lowest | 200 ₹400 |
| 6.00 | Material and labour in replacement of lubricated upper/lower bearing for non clog submersible pump set 30 HP complete all as speicified & directed. Make : NBC/SKF or equivalent as approved by GE. | 2 | Each | 1,000 ₹2,000 | 350 ₹700 Lowest | 500 ₹1,000 |
| 7.00 | Material and labour in replacement of pump shaft suitable for non clog submersible pump set 30 HP complete all as speicified & directed. | 2 | Each | 500 ₹1,000 Lowest | 600 ₹1,200 | 1,000 ₹2,000 |
| 8.00 | Taking out Non clog submersible sewage pumping set from eqilisation tank at STP (after and including dewatering of well) of up to 20 HP capacity by lifting and dismantling the same for assessing and carrying out the repair/serving and replacement of unserviceable parts with new parts as listed in subsequent items and making good in running condition with balancing, reassembling and lowering the same in well & fixing on the foundation making connections and testing complete all as specified & directed.
Note:- (a) The replaced parts of pump shall be measured & paid separately here-in-after as supply only.
(b) Dewatering of well upto max 500 mtr distance from well shall be included in the quoted rate of item. | 4 | Each Job | 10,000 ₹40,000 | 2,112 ₹8,448 Lowest | 5,000 ₹20,000 |
| 9.00 | Rewinding of motor 20 HP non clog submersible sewage pumping set with suitable size and proper guage of winding wire using best quality of insulation material including all connected items complete all as specified & directed. | 4 | Each Job | 7,500 ₹30,000 Lowest | 8,000 ₹32,000 | 12,000 ₹48,000 |
| 10.00 | Material and labour in replacement of CI impeller with guide bush suitable for up to 20 HP Non clog submersible sewage pumping set complete all as specified & directed. | 2 | Each | 5,500 ₹11,000 | 200 ₹400 Lowest | 200 ₹400 Lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
21 May 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
PREVENTIVE MAINTENANCE OF STP INSTALLATION AT PANIPAT LINE AND BOH UNDER GE U AMBALA CANTT
2026_MES_762715_1
CA NO GE U AMB 31 OF 2026-27
Open Tender
Civil Works
Item Rate
240 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE UTILITY AMBALA CANTT
₹70,000
9 Jul 2026
29 Apr 2026
23 May 2026
29 Apr 2026
21 May 2026
14 May 2026
29 Apr 2026 - 6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of tanks after desludging from sewage tanks (Stilling chamber-01 No,Bar & screen Chamber-01 No ,Oil & grease Chamer-01 No, Equilisation Tank-01 No, treated water tank -01 No, Chlorine Contact Tank-01 No, Tube Settler Tank -01 No, Sludge Holding Tank -01 No ) at Stp Plants of capacity 2 MLD to 3 MLD etc shall be carried out with water and chemical as applicable and complete white wash from inside after cleaning the tanks and dates of cleaning shall be marked on tank etc complete all as specified & directed.
Note:-1. Rates for Dewatering and desludging of tanks including T&P and safetly equipments all as directed by Engr-in-Charge is included in above item. 2. Cleaning of each tank will be measured and paid seperately. | 32 | Each Job | - | - |
| 2 | Material & labour for carrying out the Tests of treated water from NABL approved lab every month and maintain the record of treated sewage at Each STP Plant as per frequency :-
(i) PH Valve
(ii) TSS
(iii) BOD
(iv) COD
(v) Oil & Grease
(vi) FC Min
(vii) Nitrate CN
Note:- Test report for each month should be submiited at the end of month by contractor. otherwise penalty of Rs. 2000/- per month will be imposed. | 18 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_854368.xls
BOQ • 0.82 MB
Tender.pdf
Tender Documents • 0.82 MB
AMENDMENT.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .