| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC First lowest |
| 2 | L2₹7.0 LRejected-AOC | ₹7.0 L | L2 | Rejected-AOC Second lowest |
| 3 | L3₹7.1 LRejected-AOC | ₹7.1 L | L3 | Rejected-AOC Third lowest |
| Sl No | Description | Qty | Unit | K.C.THANKAPPAN L1 | Alathur Labour Contract Co Operative Society Ltd L3 | SUKESH.S L2 |
|---|---|---|---|---|---|---|
| 1.00ROAD CONCRETNG | ||||||
| 1.00 | OD148855/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains ( not exceeding 1.50 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 39.48 | cum | 288.56 ₹11,392.35 | 353.77 ₹13,966.84 | 350 ₹13,818 |
| 1.00 | OD148856/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site | 73.12 | cum | 3,203.41 ₹2.3 L | 3,927.25 ₹2.9 L | 3,889 ₹2.8 L |
| 1.00 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | 4.3 | cum | 7,326.25 ₹31,502.88 | 8,981.68 ₹38,621.22 | 8,896 ₹38,252.80 |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.15 | tonne | 77,337.73 ₹11,678 | 94,812.82 ₹14,316.74 | 93,908 ₹14,180.11 |
| 1.00 | 3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 31.5 | cum | 12.37 ₹389.66 | 15.17 ₹477.86 | 15 ₹472.50 |
| 1.01 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 21 | cum | 2,570.2 ₹53,974.20 | 3,150.96 ₹66,170.16 | 3,120 ₹65,520 |
| 1.01 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 31.5 | cum | 7,364.18 ₹2.3 L | 9,028.18 ₹2.8 L | 8,942 ₹2.8 L |
| 1.01 | OD148854/2025-2026:Supplying and providing ready made GI name board with all conveyance, labour and hire charges etc. complete using GI hollow tube of size 80 x 40 x 1.40 mm outer frame, 0.60 mm thick iron sheet of size 90 x 60 cm with two coat of enamel painting over a coat of primer,lettering with suitable colour and size fixing the post in ground with CC 1:2:4 etc. complete | 1 | no | 2,159.3 ₹2,159.30 | 2,647.22 ₹2,647.22 | 2,621 ₹2,621 |
Tender Value
₹7.5 L
EMD Value
₹18,743
Closing Date
12 Sept 2025, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, LID And EW Sub Division, Alathur Block Panchayath
Alathur Block Panchayath-Annual Plan-2025-26-Renovation of Kulakkad Gramam Road-Proj No. 80 in Tarur Grama Panchayath
2025_LSGD_794077_1
09/AEE/ABP/2025-26
Open Tender
Civil Works - Roads
240 days
Alathur Block Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,655
Yes
₹18,743
Yes
26 Dec 2025
3 Sept 2025
15 Sept 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
Amount
ROAD CONCRETNG
OD148855/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains ( not exceeding 1.50 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
OD148856/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD148854/2025-2026:Supplying and providing ready made GI name board with all conveyance, labour and hire charges etc. complete using GI hollow tube of size 80 x 40 x 1.40 mm outer frame, 0.60 mm thick iron sheet of size 90 x 60 cm with two coat of enamel painting over a coat of primer,lettering with suitable colour and size fixing the post in ground with CC 1:2:4 etc. complete
SUKESH.S (BID ID -2335949)
Alathur Labour Contract Co Operative Society Ltd (BID ID -2335403)
Bidder Name
K.C.THANKAPPAN
SUKESH.S
Alathur Labour Contract Co Operative Society Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid