Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 118 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical GOKULPURI GADHI ROAD ELECTRIC POWER LAKHIMPUR KHERI | KHERI | UTTAR PRADESH | 261501 | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.2 L
EMD Value
₹42,000
Closing Date
16 Mar 2026, 5:00 pmClosed
Sachiv,Sahakari Ganna Vikas Samiti Aira, Lakhimpur
Office Of The Sachiv,Sahakari Ganna Vikas Samiti Aira, Lakhimpur Kheri
CONSTRUCTION OF GENTS URINAL AT SAHKARI GANNA VIKAS SAMITI AIRA LAKHIMPUR KHERI
2026_CDSI_1120955_2
871/C/Nirman/Date 27-02-2026
Open Tender
Civil Works
Fixed-rate
90 days
Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,430
Sachiv,Sahakari Ganna Vikas Samiti Aira, Lakhimpur
₹42,000
4 Aug 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
16 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUB-STRUCTURE-Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 9.91 | CUM | 185.45 | ₹1,838.21 |
| 2 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation | 2.55 | CUM | 4,853.07 | ₹12,377.5 |
| 3 | R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item AND PLINTH BEAM | 0.62 | CUM | 8,196.85 | ₹5,073.28 |
| 4 | First Class brick work in 1:6 cement and coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour, and T & P etc.required for proper completion of the work. | 10.31 | CUM | 5,081.22 | ₹52,396.74 |
| 5 | SUPER STRUCTURE-Brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand) | 6.66 | CUM | 6,486.63 | ₹43,227.03 |
| 6 | Brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than .5 brick thick. (1:6 cement & coarse sand) | 0.94 | CUM | 6,486.63 | ₹6,122.86 |
| 7 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in slab excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item.(A)Ground Floor | 0.99 | CUM | 8,196.85 | ₹8,090.29 |
| 8 | P/F TMT Bar -Fe 500 in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (Ground Floor) | 1.89 | QTL. | 7,683.55 | ₹14,529.45 |
| 9 | 12mm cement plaster in single coat on fair side of single or half brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm in girth and finished even and smooth. 1 cement : 6 Course sand | 82.45 | SQM | 244.83 | ₹20,186.41 |
| 10 | Engraving lines in the plaster of outer face wall vertically and horizontally to display the surface as stone facing as directed by the Engineer-in-charge including labour & T& P etc. required for proper completion of the work. Add for extra labour to all items of plaster.(A)Ground Floor | 13 | RM | 55.85 | ₹726.11 |
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.15 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
T2.pdf
Tender Documents • 0.26 MB
BOQ_2085288.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .