Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹9,064.79 (3.07%)Rejected-AOC CHERKALA CHENGALA KASARGOD KERALA 671541 | KASARAGOD | KERALA | 671541 | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.1 L+₹18,285.95 (6.20%)Rejected-AOC KERALA KL | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.2 L+₹21,206.58 (7.19%)Rejected-Finance | L4 | Rejected-Finance Technical Reason | |
| 5 | L5₹3.2 L+₹22,857.38 (7.75%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹4.2 L
EMD Value
₹10,582
Closing Date
20 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
O/o Asst. Exe Engineer, LID AND EW Sub Division, Kasargod Block Panchyath
Padiyappa Kukkum Kudal Evinja road Concrete Badiadka Gramapanchayath
2022_LSGD_507545_7
01/2022/AE/LIDEW/KBP/KSD
Open Tender
Civil Works - Roads
Item Rate
180 days
BADIADKA
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,582
Yes
5 Nov 2022
13 Sept 2022
23 Sept 2022
13 Sept 2022
20 Sept 2022
13 Sept 2022
120 days
Amount
Road concrete
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
3.3:Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
BM ABDHULLA
AHAMAD MASHOOD K
NAUSHAD
SAYID SUHAIB C A
MUHAMMED FAHEEM BK
M A ASHRAF
MUHAMMED SHAFI.A
MOHAMMED NAVAZ B
Bidder Name
BM ABDHULLA
M A ASHRAF
T A MOHAMMED
MUHAMMED SHAFI.A
AHAMAD MASHOOD K
MUHAMMED FAHEEM BK
NAUSHAD
MOHAMMED NAVAZ B
SAYID SUHAIB C A
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_726868.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .