Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC | L1 | Accepted-AOC As per AOC Note attached | |
| 2 | L2₹26.1 L+₹1.5 L (6.14%)Rejected-Finance | L2 | Rejected-Finance As Per Summary attached | |
| 3 | L3₹27.1 L+₹2.5 L (10.3%)Rejected-Finance | L3 | Rejected-Finance As Per Summary attached |
Tender Value
₹33.2 L
EMD Value
₹66,330
Closing Date
26 Nov 2024, 6:30 pmClosed
MD,JKHPMC Ltd
Opposite Presentation Convent School, Rajbagh, Srinagar-190008, Jammu and Kashmir
Construction of Boundary Wall with Gate at Bomai Sopore
2024_HPD_264890_1
06 of 2024-25
Open Tender
Civil Works
Item Rate
30 days
Sopore
As per tender document
2 documents required · 2 mandatory
₹500
Accounts Officer,JKHPMC
₹66,330
23 Dec 2024
16 Nov 2024
28 Nov 2024
16 Nov 2024
26 Nov 2024
16 Nov 2024
Amount
Construction Of Boundary Wall with Gate
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil
Providing and Laying Stone Soling Hand Packed Complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete
Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to I:S: 2222 in Superstructure above plinth level upto floor five level in cement mortar 1:6 ( 1 cement : 6 coarse sand ) and curing complete in: with modular bricks
Extra for brick work/tile brick/AAC block masonry in superstructure above floor V level for each four floors or part thereof by mechanical means:
Extra for brick work in: Square or rectangular pillars
Providing & fixing upto floor five level precast cement concrete hollow blocks, including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete.
1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etc upto floor V level, including curing but excluding the cost of centring, shutteringand finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
Columns, pillars, piers, abutments, posts and struts.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded (Providing & Fixing of MS Main Gate & MS Wicket Gate including all necessary arrangements & accessories and (as per given drawing).
12mm Cement plaster of mix:
1 : 4 ( 1 cement : 4 fine sand)
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. 1KL
Providing and fixing of water bars
Dismantling of Existing Structures (Brick Pillars, Existing Plinth, Service Quarter/ Toilet Block/ Gate Building etc.)
Carriage of material by mechanical transport
Stone soling Avg lead Km avg lead 10 km
Sand, stone aggregate below 40 mm nominal size ang lead 20 km
Cement, stone blocks, G.I. C.I., A.C., Stainless Steel & C.C. pipes below 100 mm dia and other heavy materials Avg lead 10 Km
Bricks avg lead 10 km 1000 No's
M.M.CONTRUCTIONS (BID ID -2256602)
NAZIR AHMAD TELI (BID ID -2257047)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .